Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
In the Uk axle load has no bearing on this. Highest axle loads tend to be on the lower track categories (lower line speeds) where wider centres are required. I would guess this has more to do with the lower dynamic forces at lower speeds
The answer isn't necessary straight forward.
If you see strings of rail in the 4ft/cess then they have probably been dropped for a future renewal, or have been left from a cancelled renewal. Rail will be left in place so work can be replanned. If the renewal in not replanned the rail is left...
There was a recent test to try a single 66 headed biomass weight train out of Victoria which was largely successful. With a 60 or 59 would have been better though!
Ding ding we have a winner.
There has been a 30mph TSR on for some time with it being reduced to 20moh more recently. This was caused by a previous track lower to give the route the published gauge clearance to allow container traffic to divert through here. The drainage was never lowered and a...
I’m pretty sure you can’t weld repair HP switches, as such installation has to be centrally approved.
Standards stipulate you need to install 0 cant to 0 cant to prevent uneven wear on curves between the HP and grade A rail. This does give a bit of (I believe) unintended wiggle room on flat curves!
I don't think having to work green zone would be a massive issue. Also if you've guard rail from a train derailment point of view there would be no issues there, you might need to do something for the staff but if it's ok now maybe not such an issue (unless there are grandfather rights).
Elsewhere in the world there is great engineering access, in Germany and Austria through the vast amount of bidirectional running and cross overs allowing the machines to crack on an renew large sections in one go, hence the costs come right down.
In the U.K. we're extremely limited with...
NR have 2 TRS (track laying) machines and 5 BCS (ballast cleaning) machines.
I believe one of the TRS machines is being mothballed cp6 but the BCS machines have plenty of work. NTC are a different beast all together.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.