Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
What would be the quickest non stop timing between these 2 centres? 45 mins, possibly. Given that much of this section is permitted for 90mph. Today's service is 54 min with 3 calling points. It was 72 mins in 1985. Can't remember the 1970s.
Does anyone have any affection for this operation that I believe ran from 1974/5 up until the sad closure of Consett works in 1980. The 37s were still backwards and forwards until 1983 with scrap metal. The actual railway, nearer the Consett end still lay there until 1987 before final track...
I find it very annoying that I want to travel from Cambridge to Elgin and cannot travel until after 9.30 if I want to pay anything close to a reasonably priced fare. Why can't they allow passengers who are travelling such huge distances some leeway. After all, this is set to be a 9/10 hour...
I used to travel between Whittlesford and Cambridge on these DMUs quite often. Service was infrequent, not like today.
Services to London were much slower if you travelled from intermediate stations like Whittlesford.
During the 80s/to mid 90s, I probably had to stand more than I sat when travelling between Peterborough to Durham/Newcastle on Inter city. When the class 91 started, at least they had seats in the corridor.
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.