Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Hi all,
are their documents, compared to WTT, showing timetables, planned paths through the Eurotunnel?
Or are any other types of timetable existing containing traffic through the tunnel?
Regards from Germany
Adrian
Hi everybody,
are any (passenger?) services scheduled to run via the Battersea Reversible Line (Clapham Jn -> Pouparts Jn -> Stewarts Lane Jn.) during the current timetable period or the period 2019 (May-December).
Greetings from Germany
Adrian ;-)
Hello,
after I've asked a lot of questions the last days I want to share with you the reason why I did.
We (a German signal box simulation) started to rebuild parts of the UK rail system. We started with London Waterloo and making our way the South West Main Line down. It's free to play :)...
Hello,
according to the May-December 2019 WTT the following services stop to set down/detach at Basingstoke:
2T13
5B17
2T45
On the other hand i couldn't find a train stopping to take up/attach.
I also couldn't find services starting at Basingstoke that could be formed out of the splitted...
Good evening,
I'm trying to rebuilt London Waterloo station as a simulation. I'm nearly done, but as a small Easteregg, I want to programme the diverted Southeastern Trains to London Waterloo as it was in summer 2017. I think it was a 2 tph service from Sevenoak, runing via Windsor Reversible...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.