Cloud Strife
Established Member
- Joined
- 25 Feb 2014
- Messages
- 2,967
It doesn't drive demand, but being the only GB preclearance facility would incentivise a massive uplift in departures, which in turn would require more runway capacity.
Runway capacity isn't really that big a problem. Stansted think they can reach 51 million with a single runway, and Edinburgh could extend the runway if needs be.
The problem is the lack of terminal capacity. Any preclearance facility can only be used for US flights, and it's not an ideal use of airport space. It doesn't matter so much in Dublin because they've got plenty of underused gates, but this isn't the case in Edinburgh.