Month-long shutdown of North Wales Coast Line for engineering works

Russel

Established Member
Joined
30 Jun 2022
Messages
5,613
Location
Lichfield
Perhaps this thread would also be suitable:



Similar thoughts to me on first seeing the CGI of the new footbridge.

I get the requirement for disabled access etc, but Network Rail must be propping up the entire UK steel industry!

== Doublepost prevention - post automatically merged: ==

Can someone explain the reason for the addition of a second footbridge at Prestatyn?

Unless I'm missing something, it's next to an existing bridge, with a footpath?

6c4add0193f14ced8d2bf89536cf2d0f.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
22,004
Location
Airedale
Similar thoughts to me on first seeing the CGI of the new footbridge.

I get the requirement for disabled access etc, but Network Rail must be propping up the entire UK steel industry!

== Doublepost prevention - post automatically merged: ==

Can someone explain the reason for the addition of a second footbridge at Prestatyn?

Unless I'm missing something, it's next to an existing bridge, with a footpath?

6c4add0193f14ced8d2bf89536cf2d0f.jpg
Looking at the direction it takes, parallel to the railway, is it a footpath diversion for the crossing about 1/4m to the West?
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,613
Location
Lichfield
Looking at the direction it takes, parallel to the railway, is it a footpath diversion for the crossing about 1/4m to the West?

Ah possibly yeah, but why not just run some steps down from the road bridge?

I'm sure there is a perfectly good reason!
 

Welshguy1048

Established Member
Joined
6 Apr 2023
Messages
2,410
Location
North Wales
Looking at the direction it takes, parallel to the railway, is it a footpath diversion for the crossing about 1/4m to the West?
@30907
@Russel

The foot crossing to the west (Sandy Lane) and another one further west (Beverley Drive) have been closed

All the details are here :


Dave
 
Last edited:

Russel

Established Member
Joined
30 Jun 2022
Messages
5,613
Location
Lichfield
@30907

The foot crossing to the west (Sandy Lane) and another one further west (Beverley Drive) have been closed

All the details are here :


Dave

In this image, you can see there is a link between the long ramp and the road bridge, so I still don't understand why a second bridge across the track is required here.

Prestatyn-bridge-3-2048x1152.jpg
 

Welshguy1048

Established Member
Joined
6 Apr 2023
Messages
2,410
Location
North Wales
In this image, you can see there is a link between the long ramp and the road bridge, so I still don't understand why a second bridge across the track is required here.

Prestatyn-bridge-3-2048x1152.jpg
@Russel

It's to replace the two foot crossings that have been closed...read the network rail link I posted above....this explains everything.

Dave

== Doublepost prevention - post automatically merged: ==

This from Network Rail details and explains about the full line closure between Holyhead and Chester in January and all about the work they will be carrying out during the line closure


Dave
 
Last edited:

Sheridan

Member
Joined
11 Jan 2012
Messages
641
Ah possibly yeah, but why not just run some steps down from the road bridge?

I'm sure there is a perfectly good reason!

Various options were considered, including using or upgrading the existing footway on Bridge Road. During the consultation process, the option of a new footbridge was the one that came out on top, seemingly as it could be made more accessible.

All detailed in this document: https://www.networkrail.co.uk/wp-co...Prestatyn-Level-Crossing-previous-options.pdf
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,613
Location
Lichfield
@Russel

It's to replace the two foot crossings that have been closed...read the network rail link I posted above....this explains everything.

I get that it is to replace foot crossings, my point was that building a second bridge to duplicate an existing footpath that is within a couple of new new structure just seems like throwing money away.
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,611
I get that it is to replace foot crossings, my point was that building a second bridge to duplicate an existing footpath that is within a couple of new new structure just seems like throwing money away.
I wonder if it's something to do with the maximum width of the bridge before different regulations apply? i.e. to put in a bridge that had a decent width footpath would mean having to make it significantly stronger, and it was cheaper to just add a separate footbridge (that is me wildly guessing though)
 