Perhaps this thread would also be suitable:
Does Network Rail have an over-engineering problem?
Every time I see this gantry at Tulse Hill I wonder: is so much steel really necessary to support a couple of colour light signals (plus a human maintaining them)? (Image is of a signal gantry with very substantial steelwork) There are lots of other examples, including most station...www.railforums.co.uk
Similar thoughts to me on first seeing the CGI of the new footbridge.
I get the requirement for disabled access etc, but Network Rail must be propping up the entire UK steel industry!
== Doublepost prevention - post automatically merged: ==
Can someone explain the reason for the addition of a second footbridge at Prestatyn?
Unless I'm missing something, it's next to an existing bridge, with a footpath?