Taken from another (really interesting) thread.The 309s were originally intended for the ECML on services London to York. The electrification never happened though, (in the '60s, - it eventually did in the '80s), by which tome other (faster) electric options were available. A 309 set was also used for testing high speed running on the WCML but it only reached just over 100mph. I would suggest that the DC traction setup was tuned to the GEML route infrastructure.
So what would have happened north of York? Was the electrification to have stopped there and a Weymouth-style arrangement handled trains to Newcastle and Edinburgh (assuming the route between them stayed open)?
Or was electrification to proceed beyond York and a mix of 309s and 81-85-type locos to be used? Presumably in those enlightened times the intention was always to have electric freight.
That’s all interesting in itself, but what most intrigues is why the ER opted for long distance EMUs and the LMR didn’t. Was it because the ECML lends itself to semi-fast services more than the West Coast? Or were there different mindsets in the regional HQs? The LNER and its constituents had been dreaming of main line electrification for decades after all; I don’t think the LMS had been.
Last edited: