Getting the most out of the new Alstom units for TPE?

hwl

Established Member
Joined
5 Feb 2012
Messages
8,297
Well per metre it is, yes.

But in the battery era I'm not sure how much cost per metre matters. I think the better metric is seconds of pantograph up per pound spent.

A kilometre of track on a 100mph railway only charges each train for something like 23 seconds. At 20mph it is 115 seconds, the 20mph section could be treble the price per metre and still be the better choice.

A station platform is great because it gets you the dwell time almost for free. The tracks around Sheffield are heavily utilised and at low speeds, especially between dore and Totley and meadowhall, I think they could be extremely expensive per metre and still be the best choice of charging location

I personally think Sheffield needs a total rebuild more than anything, but I doubt one is forthcoming.
In the absence I'm not sure the BEMU programme can afford to get scope creeped into non charging infrastructure improvements.
You metric of "seconds of pantograph up per pound spent" is certainly heading in the right direction but probably need to include elements of needing reasonable lengths of contiguous wiring (outside of termini with long layovers), not having monster gaps and aiming to cover high power draw sections e.g. acceleration and up hill to make battery specification less demanding.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Killingworth

Established Member
Joined
30 May 2018
Messages
6,510
Location
Sheffield
Well per metre it is, yes.

But in the battery era I'm not sure how much cost per metre matters. I think the better metric is seconds of pantograph up per pound spent.

A kilometre of track on a 100mph railway only charges each train for something like 23 seconds. At 20mph it is 115 seconds, the 20mph section could be treble the price per metre and still be the better choice.

A station platform is great because it gets you the dwell time almost for free. The tracks around Sheffield are heavily utilised and at low speeds, especially between dore and Totley and meadowhall, I think they could be extremely expensive per metre and still be the best choice of charging location

I personally think Sheffield needs a total rebuild more than anything, but I doubt one is forthcoming.
In the absence I'm not sure the BEMU programme can afford to get scope creeped into non charging infrastructure improvements.
Quite. Although running a BEMU from Liverpool to Sheffield might work, stabling overnight in a wired platform maybe to be first westbound and last eastbound of the day.
 

eldomtom2

On Moderation
Joined
6 Oct 2018
Messages
2,402
aiming to cover high power draw sections e.g. acceleration and up hill to make battery specification less demanding.
"High power draw sections" would also include sections of high (100mph+) speed, am I right in assuming that?
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
669
Location
Hull
So in the case of engineering works, you split the service at Leeds – no big deal. You could have both trains use the same platform to make it really easy for passengers to just walk along the platform to change trains. It's still better than pretty much any of the usual alternatives. Passengers from Hull and Scarborough regularly have to change at Leeds or York in those circumstances, this would just switch around which passengers retain through services and which don't. It's not a big enough issue to be the deciding factor in any procurement exercise.
They split the Hull and Scarborough services because they have the least passengers on them so it means fewer passengers are disrupted than if you split the Newcastle service, can't see why you would want to change what current works well. The important TPE passenger flow is Liverpool - Manchester - Leeds - York - Newcastle, Saltburn / Scarborough / Hull are just convenient places to send the trains since they need a train service providing.

The 802's can do the Calder Valley diversions and the BEMU's used from Leeds / York as is now the case.
 

eldomtom2

On Moderation
Joined
6 Oct 2018
Messages
2,402
there probably won't be much non electrified 100+mph running on their route.
If we're talking about the UK as a whole there's quite a lot - electrifying 100mph or above lines would mean doing the GWML (via both routes) up to about Starcross, the MML, and the Cross Country Route.

Of course if we're talking about TPE specifically there isn't much, but it could benefit from electrification done for other services.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,880
Location
West of Andover
Would these units work on the south TPE route between Liverpool and Cleethorpes? Use Electric from Lime Street to Hazel Grove, Battery over the Hope Valley (could use regenerative braking on the downhill section from Edale), charge a bit at Doncaster (depending on charge times) and battery along the [mostly] flat route all the way to Cleethorpes. Would probably need charging facilities at Cleethorpes.

There is a slight gap in the overhead wiring between the Liverpool South Parkway area & the Old Trafford area. Unless you are proposing routing the services via Chat Moss
 

Class 317

Member
Joined
7 Jul 2020
Messages
587
Location
Cotswolds
Well per metre it is, yes.

But in the battery era I'm not sure how much cost per metre matters. I think the better metric is seconds of pantograph up per pound spent.

A kilometre of track on a 100mph railway only charges each train for something like 23 seconds. At 20mph it is 115 seconds, the 20mph section could be treble the price per metre and still be the better choice.

A station platform is great because it gets you the dwell time almost for free. The tracks around Sheffield are heavily utilised and at low speeds, especially between dore and Totley and meadowhall, I think they could be extremely expensive per metre and still be the best choice of charging location

I personally think Sheffield needs a total rebuild more than anything, but I doubt one is forthcoming.
In the absence I'm not sure the BEMU programme can afford to get scope creeped into non charging infrastructure improvements.
I love cost per second a pantograph is up versus cost!

Think it should be charging time versus cost to account through.
 