At around 15:00 on 9 August 2025, a steam locomotive moved unexpectedly while it was being coupled to a second steam locomotive in platform 1 at Sheffield Park station. This caused both locomotives to travel together for approximately 4 metres, at slow speed.

Sheffield Park station is located on the Bluebell Railway, a heritage railway in Sussex. At the time the movement took place, a volunteer member of staff
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

UP13

Member
Joined
27 Jul 2018
Messages
513
Glad nobody was hurt! Must have been scary for the person, even at low speed.
 

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,043
Location
Newhaven
How does the second steam locomotive move as well? Can the piping release the brakes on all locomotives when attached? Even that being the case 4m is quite a distance on a flat section of track
 

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,900
Location
Rugby
The RAIB report has now been published


At around 15:00 on Saturday 9 August 2025, a shunter was coupling two steam locomotives together when they unexpectedly moved while the shunter was in between them. The locomotives moved around 3 metres (10 feet) before the movement was stopped by another member of staff who was on the platform. The shunter was uninjured but was shaken by the incident.

The incident occurred during the Bluebell Railway’s 65th anniversary mini-gala event. The locomotives, named Fenchurch and Stepney, were being coupled in preparation for their return to a nearby shed.

The two locomotives unexpectedly began to move because steam pressure was able to build up in the cylinders of Fenchurch, which caused it to make an uncommanded movement. This pressure build-up occurred because the regulator valve was not fully closed, which admitted steam into the cylinders. In addition to this, the reverser was not in a position that would have reduced the risk of movement by the locomotive.

Fenchurch had also not been effectively immobilised. This was because its air brake was not fully applied. In addition, the actions the shunter took to prevent Fenchurch from moving were ineffective because they had not been made aware of the type of braking system used by the locomotive.

An underlying factor to the incident was that the Bluebell Railway was not effectively managing the risks associated with coupling air-braked rolling stock.

Recommendations
RAIB has made one recommendation to the Bluebell Railway. This recommends that the railway undertakes a risk-based review of its arrangements for coupling and uncoupling rail vehicles.
 