• London TravelWatch expressed concern with the proposals, particularly about Euston capacity and congestion and how station capacity will be mentioned.
• West Midlands Trains (WMT) opposed the application, based on performance, capacity, Euston platforming, rolling stock and abstraction concerns.
• East Midlands Railway (EMR) opposed the application based on capacity and performance concerns
• Northern Trains opposed the application based on capacity and performance concerns, and abstraction. In particular it raised concerns over compatibility with London Task Force plans.
• AWC opposed the application on capacity and performance grounds, and abstraction from its services. It also noted concerns about interactions with HS2 and long-term capacity planning.
• GB Railfreight (GBRf) opposed the application due to uncertainty over its impacts on freight capacity, and capacity at key WCML bottlenecks.
• Transport for Wales (TfW) opposed the plans on capacity and performance grounds, particularly around Crewe and Manchester, and also raised concerns about undermining Manchester Task Force Plans
• DfT opposed the application on grounds of capacity, performance, power supply, HS2 interactions and revenue abstraction. DfT's modelling predicted approximately £4m of revenue would be abstracted from other operators, with just £600k of new revenue generated, representing a 0.15 NPA ratio before the ICC is phased in.