• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Southern Railway/Region DC Overhead in Yards Question - Which ones and Which Years

Kentish RYS

Member
Joined
16 Jul 2026
Messages
113
Location
Kent
Pretty much as the title suggests, as a quick search only gives some vague answers;

The Southern Railway/Region DC Overhead in Yards for use by what BR called the class 70 & 71 (were there more than these 2?)
Which yards were fitted? As I have found articles that say among or including but no full lists
When was it first installed and how long did it last? Obviously the class 73 with a small diesel engine & the MLVs with batteries for yards was the alternative idea so presumably not tremendously long lasting?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,430
Location
S Yorks, usually
A quick search for "southern region overhead" took me here, a maker of model overhead equipment
from which
750v DC overhead catenary was, in 1941, installed at Brighton and Balcombe initially for testing CC1/2. The overhead was later installed at Angerstein Wharf, Betteshanger Colliery, Bricklayers Arms, Deal, Dover Town, Faversham, Hither Green Goods, Hoo Junction, Maidstone West, Plumstead, Shepherdswell, Sittingbourne, and Snowdown Colliery.
I'm kind of surprised it didn't list Norwood Junction, as an important Brighton line yard, when CC1/2 (20001/2) were predominantly on that route.

== Doublepost prevention - post automatically merged: ==

Also some extra info on this old thread at rmweb:
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,057
Location
Up the creek
By the time the wires were put up the first of the SR’s 350 hp shunters had gone to Norwood Junction and could be used (even though the War Department took them), although so could a steam loco. My understanding is that the wires were installed at locations where there was a fair amount of traffic that could best be handled by electric locos, but where it wasn’t worth basing a steam shunter.
 

contrex

Established Member
Joined
19 May 2009
Messages
1,684
Location
St Werburghs, Bristol
A quick search for "southern region overhead" took me here, a maker of model overhead equipment
from which

I'm kind of surprised it didn't list Norwood Junction, as an important Brighton line yard, when CC1/2 (20001/2) were predominantly on that route.

== Doublepost prevention - post automatically merged: ==

Also some extra info on this old thread at rmweb:

Coincidentally, I'm reading 'The Story of the Big Four Railway Companies' by Colin Maggs (2022), and in the 'Southern Electric' chapter, he wrote:

In 1942 a Co-Co electric locomotive No CC1 appeared [...] Two more of the class were built and were used on trains varying from a heavy freight to a Newhaven boat express. The catenaries over goods yards never appeared.

Did he not do enough research, or is there some definition of a 'goods yard' that he may have used, or were the wires put up in BR days and thus nominally outside the scope of the book?
 

Rescars

Established Member
Joined
25 May 2021
Messages
2,600
Location
Surrey
Was the idea that the entire yard could be shunted by the electric loco, without involving any other motive power? Presumably the wiring had to extend beyond the yard perimeter, at least far enough for the electric loco to pick up the third rail.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,345
Strangely there were hardly any electric locomotives to use such wires. The interval between the first E5000 loco (the couple previously being experiments) and the first Electro-diesel (when they realised that was the better way) was just a couple of years. Steam lasted surprisingly late in the electrified areas, and they moved on to diesel for anything not mainstream passenger services. I remember passing Snowdown colliery in Kent in the late 1970s and it still having wires, but wonder what had ever used them.

There was however wiring elsewhere in the country that was hardly, if ever, used by electric locos. The big installation all across Basford Hall yard at Crewe seemed likewise always shunted by diesel shunters.
 

marshlinker

Member
Joined
18 May 2026
Messages
201
Location
Romney Marsh
Was the idea that the entire yard could be shunted by the electric loco, without involving any other motive power? Presumably the wiring had to extend beyond the yard perimeter, at least far enough for the electric loco to pick up the third rail.
Think here in East Kent it was mostly used in Colliery Exchange sidings and associated yards so that the mainline engine could pull the coal train out on to the third rail. The shunting having already been completed by steam engines.
 

Kentish RYS

Member
Joined
16 Jul 2026
Messages
113
Location
Kent
Thanks all, interesting info! And interesting how short lived it was in use

A quick search for "southern region overhead" took me here, a maker of model overhead equipment
I tried the exact search term and didn't get what you did, so I'm obviously not using the same search engine!
 

Rescars

Established Member
Joined
25 May 2021
Messages
2,600
Location
Surrey
Think here in East Kent it was mostly used in Colliery Exchange sidings and associated yards so that the mainline engine could pull the coal train out on to the third rail. The shunting having already been completed by steam engines.
This makes good sense. Difficult to see how a colliery could load wagons easily with tramway style OHE potentially getting in the way.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,848
Location
SW London
Strangely there were hardly any electric locomotives to use such wires. The interval between the first E5000 loco (the couple previously being experiments) and the first Electro-diesel (when they realised that was the better way) was just a couple of years.
The ectro diesels did arrive shortly after the E5000s, but I'm fairly sure i saw the wires still up at Hither Green in the late 70s
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,996
Location
Airedale
Coincidentally, I'm reading 'The Story of the Big Four Railway Companies' by Colin Maggs (2022), and in the 'Southern Electric' chapter, he wrote:



Did he not do enough research, or is there some definition of a 'goods yard' that he may have used, or were the wires put up in BR days and thus nominally outside the scope of the book?
The context is CC1/2 and overhead wires never appeared on their patch - the Kent Coast project was 17 years later.
Not sure about Lovers' Walk though :)
 
Last edited:

testertrev

Member
Joined
17 Nov 2016
Messages
23
 

Rescars

Established Member
Joined
25 May 2021
Messages
2,600
Location
Surrey
Just a thought, but I assume no parts of the LBSC DC OHE was reused in the SR yard installations. IIRC a few masts survived for a long time after the LBSC lines were converted to third rail.
 

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,788
Location
St Albans
Angerstein Wharf is mentioned on the model maker's site linked to in post #2. According to "Charing Cross to Dartford" (V Mitchell and K Smith, Middleton Press, 1990) the OLE was installed on this branch in 1959 and removed in 1976. A diagram in the same book shows the branch was electrified by third rail for the first 600 feet and then 530ft of OLE covering basically the reception and departure loop. No other part of the branch was electrified. I recall seeing more class C 0-6-0 goods engines on the branch than I did electric locos up to 1964, when I stopped passing along that road after leaving school.
The same book makes no mention of any OLE at Plumstead goods yard although I have memories of seeing it.
 

Top