Indeed, knowing how quickly they can accidentally travel through the Vale of YorkA class 80x could better that time if allowed to to 140 mph
Indeed, knowing how quickly they can accidentally travel through the Vale of YorkA class 80x could better that time if allowed to to 140 mph
ETCS on it's own does not permit 140mph. And there is very little hope in the current environment for funding of an upgrade to meet today's standards for a retrofitted 140mph line. It would needs swingnose crossings and closed off platforms, for a start. And that's before you look at OLE spec, track & cant tolerances, underline structures, and whether the timetable could allow 140mph running (and all the rest...).Perhaps with ETCS 140 mph running will happen again. A class 80x could better that time if allowed to to 140 mph.
ETCS on it's own does not permit 140mph. And there is very little hope in the current environment for funding of an upgrade to meet today's standards for a retrofitted 140mph line. It would needs swingnose crossings and closed off platforms, for a start. And that's before you look at OLE spec, track & cant tolerances, underline structures, and whether the timetable could allow 140mph running (and all the rest...).
That's platforms. (Still needs work, as you mention). Now for installing swingnose crossings on every 140mph sections and upgrading all the OLE and track...On the ECML there are not really that many platforms. Presumably it is only worth doing North of Hitchin as increasing the speed differential between services South of there would be counter productive. Platforms 2/3 at Biggleswade and St.Neots could be closed off in normal operations. Peterborough, Retford and Doncaster are platform free on the fast lines. Grantham has a 100mph limit for the curve at the North end. Newark has the 100 mph restiction just North of the station. The only real problem is Northallerton, and there is a long term plan to 4 track up to the station with new platforms on the slows. That would leave only Chathill with its almost useless service currently on 125mph lines on the ECML in England. There is also Prestonpans and Wallyford in Scotland on a 125mph section but it is highly doubtful that more than a few seconds would be gained form upgrading so literally no point. All others are resticted below 125mph mainly due to curvature.
Looking through Milepost* 32/2 (Oct 2011) I read a very interesting article by Jeremy Harthill which complements the above quoted stats nicely.Just been doing a bit of research for myself which I thought others might find interesting. Basically I was looking through the latest update of the Railway Performance Society's Fastest Times booklet and seeing what the fastest times are for each of the main lines. More lines are in the booklet but I have not included them for reasons of space.
Railway Performance Society Fastest Times
HS1 International - 124.8mph - Ashford Intl to Ebbsfleet - 2019 - C374
HS1 Domestic - 119.3mph - Stratford to Ashford Intl - 2019 - C395
ECML - 117.5mph - Peterborough to York - 1991 - C91
WCML - 115.7mph - Watford Junc to Coventry - 2011 - C390
GWML - 110.9mph - Paddington to Swindon - 2020 - C800*
MML - 104.0mph - St Pancras to Kettering - 2021 - C222
Bristol to Taunton - 99.5mph - Bristol to Taunton - 1997 - HST
Reading to Penzance - 95.7mph - Reading to Exeter - 1996 - HST
Derby to Birmingham - 92.0mph - Tamworth to Burton OT - 2006 - C220
GEML - 90.3mph - Norwich to Ipswich - 1994 - C86
Birmingham to Bristol - 87.2mph - Cheltenham to Bristol PW - 2020 - C221
Waterloo to Southampton - 89.4mph - Basingstoke to Winchester - 2017 - C220**
Glasgow to Edinburgh - 88.3mph - Falkirk High to Haymarket - 2019 - C385
Birmingham to Marylebone - 88.1mph - Banbury to High Wycombe - 2016 - C68
Brighton line - 78.6mph - Brighton to E Croydon - 2017 - C377
North Wales - 77.3mph - Colwyn Bay to Rhyl - 2010 - C175
Perth to Inverness - 75.9mph - Dalwhinnie to Kingussie - 2005 - C67
Salisbury to Exeter - 75.8mph - Basingstoke to Andover - 1991 - C50
Swindon to Gloucester - 75.3mph - Swindon to Gloucester - 2022 - C800
Welsh Marches - 74.2mph - Hereford to Ludlow - 2003 - C158
Oxford to Hereford - 73.4mph - Morton in Marsh to Charlbury - 2016 - HST
Inverness to Aberdeen - 66.9mph - Elgin to Keith - 1989 - C156
* next fastest was 110.5mph by an HST run from Paddington to Bristol Parkway in 1980 (diesel powered on 1980 infrastructure....)
** Class 220s are interlopers, next fastest was 89.1mph by C442 Basingstoke to Southampton Airport in 1988
It will be noticed many of these fastest times are quite old. There are a few reasons for that, there are fewer longer services (i.e. more stops), "defensive driving" and, how can we put this, less "latitude" for drivers to make up time by using their experience (since runs are now all logged).
Full details of most of the runs are available to RPS members on the website. The odd run appears in the RPS archive but not in printed the list of fastest times (which is what I am using) not sure why. If any members spot any errors please let me know either on this thread, or by PM, or by E mail.
The original source is an article in Railway Magazine October 1974 "Britain's Fastest Trains".Fastest services on British Rail mainlines in October 1974
WCML - Rugby to Watford - 88.8mph
ECML - Stevenage to York - 81.7mph
MML - St Pancras to Wellingborough - 74.4mph
Scotland - Haymarket to Lenzie - 73.5mph
SR (Western) - Basingstoke to Woking - 72.3mph
GWML - Paddington to Exeter - 71.3mph**
GER - Witham to Colchester - 68.3mph
SR (Eastern) - Ashford to Tonbridge - 63.8mph
SR (Central) - Croydon to Haywards Heath - 61.1mph
This surprises me. I'd have expected something like Reading to Bath or Paddington to Swindon to be faster. I do not have the timetable for 1974 but I do for 1975 and the latter services are indeed slower, fastest appeared to be Paddington to Bath and Paddington to Chippenham, both averaging 65.5mph. Maybe engineering work for the forthcoming 125mph services was slowing schedules ?