Leeds Bradford Airport Parkway Business Case and Engineering Report

Joined
21 Jan 2024
Messages
79
Location
London
West Yorkshire Combined Authority have responded my Freedom of Information request for information on their business case on the station. They responded with a business case and an engineering report done in 2025. The link to the FOI can be found here as the files are too big to attach to the post https://www.whatdotheyknow.com/request/leeds_bradford_airport_parkway_s_2 The business case goes through their plan in 2019 for the construction of the station and the engineering report goes over the feasibility of building the station.

In the response letter when talking about the business case they state,
Attached to this response are two documents. The first is business case document. We should clarify that this business case is not a complete document. It is a draft produced
in 2019, work to update it has not yet resumed, and no date has currently been set for that work to begin. It should not be treated as reflecting the current position on the scheme.
It’s good they are provided the business case from 2019 but it is worrying that that parts of the project are, as I understand, not progressing. While they did an engineering report in 2025, it does feel like nothing is happening and they aren’t too bothered about building this station.

Edited to comply with forum rules
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
That’s interesting. The comments about Starbeck station on page 22/23 interest me as well. I am guessing that the plan is to extend the York bound platform towards Harrogate and move the current signal towards Harrogate to create an overlap that doesn’t require the barriers on the very busy Starbeck High Street level crossing to be lowered as early as they currently are when a York bound train approaches.
 
Last edited:

Midland Man

Member
Joined
10 Jun 2017
Messages
45
That’s interesting. The comments about Starbeck station on page 22/23 interest me as well. I am guessing that the plan is to extend the York bound platform towards Harrogate and move the current signal towards Harrogate to create an overlap that doesn’t require the barriers on the very busy Starbeck High Street level crossing to be lowered as early as they currently are when a York bound train approaches.
Road traffic passing over a level crossing is not an obstruction for the purpose of accepting a train on AB. I worked Starbeck as a relief signaller but can't remember whether the barriers had to he lowered to permit a Knaresborough bound train to access the platform ( which woukd have been unusual). But the Chief Signalling Inspector constantly reminded us that drivers must be given green signals whenever possible so moving the signal back towards Harrogate would not reduce barrier down time. That said new signals are not now sited close to level crossings thus an overlap is provided. But again that wouldn't alter barrier down time.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,856
I worked Starbeck as a relief signaller but can't remember whether the barriers had to he lowered to permit a Knaresborough bound train to access the platform ( which woukd have been unusual).
They do have to be lowered before the train can be permitted into the platform.
 

Leedslad_

Member
Joined
15 Mar 2018
Messages
14
I remember when they said a direct spur to the terminal was too pricey at £100m...

Now they're proposing close to that for a really naff bus/train combination
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,869
I remember when they said a direct spur to the terminal was too pricey at £100m...

Now they're proposing close to that for a really naff bus/train combination
Just think what the real cost of the direct spur would have been.
 

class26

Member
Joined
4 May 2011
Messages
1,199
Easy jet have just announced they are leaving Leeds Bradford so passenger numbers will fall significantly next yera.
 

TheGrew

Member
Joined
31 Jul 2012
Messages
514
Glancing at the Wikipedia page, it looks as though all the destinations are served by other airlines at the airport. When I think Leeds/Bradford I tend to think of Jet2 rather than the others.
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
10,496
Location
Cheshire
Easy jet have just announced they are leaving Leeds Bradford so passenger numbers will fall significantly next yera.
They only had 2 or 3 flights a day maximum, so it's not going to make a massive impact. If anything the other operators may take up the easyJet slots.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,666
Easy jet have just announced they are leaving Leeds Bradford so passenger numbers will fall significantly next yera.
Will barely make a dent in their passenger numbers. A few flights a day to places that someone else serves. Now if Jet2 were leaving Leeds... That might be different!
 

yoyothehobo

Member
Joined
21 Aug 2015
Messages
853
I suggest closing the airport entirely and moving it to Church Fenton to allow a nice little gadgetbahn to run from Church Fenton station to the airport....I like the sound of Church Fenton International:D
 
Last edited:

eisenach

Member
Joined
6 Feb 2014
Messages
189
Location
Leominster
I suggest closing the airport entirely and moving it to Church Fenton to allow a nice little gadgetbahn to run from Church Fenton station to the airport....I like the sound of Church Fenton International

It was around as a good idea when I was a teenager in Leeds in the 70s.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,702
Location
Leeds
As I remember, there were three elements; the station for the airport, a park & ride and a business park (of sorts). The P&R only works if there's a station, but didn't justify the cost of the station on it's own; you needed the business park as well.

I've not heard anything about either for years.
 

19Gnasher69

Member
Joined
1 Jul 2021
Messages
172
Location
Aire Valley
I think that the station was originally conceived as simply serving the airport, allied to a bus shuttle.

It soon became apparent that this use alone wouldn’t work, so it morphed into a P&R (there’s a decent catchment - Yeadon, Pool-in-Wharfedale and Otley plus the new housing on the other side of the railway).

Post-Covid the prospective commercial development off Whitehouse Lane seems to have been thrown into the mix. Presumably things have evolved in this way as the BCR was always out of reach!

The WYCA acquired a farm/livery yard some years ago to enable the station to be constructed. I can’t recall whether land on the east side of the line was also acquired.
 

Kingston Dan

Member
Joined
19 Apr 2020
Messages
344
Location
N Yorks
They should just close the airport and use Manchester instead - there are more direct trains there from Leeds and Bradford now than there ever will be to LBA.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,840
They should just close the airport and use Manchester instead - there are more direct trains there from Leeds and Bradford now than there ever will be to LBA.
There's one train per hour from Leeds and none from Bradford to Manchester Airport.
 

johntea

Established Member
Joined
29 Dec 2010
Messages
3,034
As much as I'm a fan of rail the last time I went to Leeds Bradford Airport I just caught the bus from (at the time) right outside Leeds rail station which took around 40 minutes, dropped off right outside the entrance to the airport and security took a whole couple of minutes to get through

These days it would only be £2.50 each way too!
 