Are temporary speed restrictions (TSRs) no longer required after track renewal work?

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,476
Location
Gomshall, Surrey
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,371
Location
Yorkshire
I had thought that speed restrictions at track renewal sites were a thing of the past, with modern tamping and packing methodology. I'm sure I have travelled over many sites at line speed very soon after relaying. I must be mistaken...
We’ve made greater strides in reopening the railway at higher speeds following essential track renewals – and it’s all thanks to advances in engineering...
...We’ve designed our engineering assurance process to focus on the installation quality to prove we can open the track at a higher speed and reduce the impact on services...
The above article suggests that handback speeds are higher, but not necessarily eliminated entirely.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
625
Location
Hull
Dynamic Track Stabilisation has been around for 50 Years, BR started using it during the ECML electrification scheme. They made a big claim to be the first railway to return a section of relayed track at full 125mph line speed the next morning, it was one of the reasons for the journey time reductions following electrification as there was less engineering slack time in the schedules.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
Moderator note: Split from

I had thought that speed restrictions at track renewal sites were a thing of the past, with modern tamping and packing methodology. I'm sure I have travelled over many sites at line speed very soon after relaying. I must be mistaken...



The above article suggests that handback speeds are higher, but not necessarily eliminated entirely.

I haven’t read the article, but I guess it says that higher speed handbacks are enabled by using a Dynamic Track Stabiliser - DTS - (which has been around 40 years) and welding up the joints before handback.

Thing is, the DTS can’t be used in lots of places, and it also puts time into the weekend schedule which may not be available for the site. Similarly, stressing and welding up the strings of rail also takes time that may not be available. It also usually costs more. For context a 50mph restriction on a 90mph line for a typical renewals site will cost less than a minute, and less than that still if it is within the braking / acceleration areas of a station. Essentially there is no point in using the DTS and welding up for any linespeed of 75mph or under - it just costs more for minimal benefit.

Where it is useful is on lines with speeds over 100mph.

So, there are plenty of renewal sites with speed restrictions on post work, but usually only for a week.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
Go back even 40yrs and the site would open at 20mph after renewal by the 90's it was increased to 40mph when they introduced the whacking machines to get the base stone well consolidated before laying sleepers as well as getting very close to design level so you dont need to lift the track much with tamping. It was then increased to 50mph when they got certification for high strength rail clamps.

This was achieved with tamping machines only.

Temporary speeds used to come off on a Friday after weekend works but are often spated by Wednesday now in the Southern area where line speeds are lower.
 