If the whole of the ECML could be up graded to 140 mph, where it’s feasible, then a journey time of approx 3 hrs 35 mins Kings Cross-Edinburgh, could be achieved so its not a small gain. I know this sounds un feasible, but in the mid 90’s, 1T01 which was a shortened 225 set, with 5 Mk4’s, did Kings Cross-Edinburgh non stop in 3hrs 29 mins, running at 140 mph where it was feasible to. The 140mph sections were:
Hitchin-Huntingdon, then towards Connington etc,
Peterborough-Grantham-Newark, then in places to Doncaster,
Doncaster-York,
York-Darlington,
these were the major 140mph stretches, with other shorter stretches where 135mp-140mph was possible, though on some of these parts, the top speed wasnt done for various reasons, and there were couple short stretches between Newcastle-Edinburgh, where on at least one part, only approx 125 mph was reached. The run just barely did it in 3hrs 29 mins, it was a close run thing. Taking this run with 2 stops gives possible timing of about 3hrs 35 mins, so if this could be done it would be worthwhile and of economic benefit.
Sorry this is not right.
1T01 went rather faster than 140mph in places. It also ‘parted the Red Sea’ in that anythign in the way was mived out of the way.
At 140 vs 125:
Hitchin to Connington saves approx 90 seconds
Peterborough - Stoke and Peascliff to Newark together save approx 90 seconds
”in places to Doncaster” saves around 1 minute
Doncaster to York saves 2 minutes
York to Darlington saves 2 minutes.
Total 8 minutes over today’s timings. At best.
All of which assumes that on the sections abive 125mph:
every Level Crossing is closed
every set of pointwork is replaced with swing nose crossings or remived entirely
all contact and catenary wire is replaced, and retensioend along with any supports that are not structurally independent or of sufficient strenght for the higher tension
all signalling is replaced
most track on curves is recanted
all strcutures above and below the railway are reassessed
many structures rebuilt for higher dynamic loading / higher aerodynamic forces / gauging
power supplies upgraded
and more.