West Yorkshire Combined Authority have responded my Freedom of Information request for information on their business case on the station. They responded with a business case and an engineering report done in 2025. The link to the FOI can be found here as the files are too big to attach to the post https://www.whatdotheyknow.com/request/leeds_bradford_airport_parkway_s_2 The business case goes through their plan in 2019 for the construction of the station and the engineering report goes over the feasibility of building the station.
In the response letter when talking about the business case they state,
Edited to comply with forum rules
In the response letter when talking about the business case they state,
It’s good they are provided the business case from 2019 but it is worrying that that parts of the project are, as I understand, not progressing. While they did an engineering report in 2025, it does feel like nothing is happening and they aren’t too bothered about building this station.Attached to this response are two documents. The first is business case document. We should clarify that this business case is not a complete document. It is a draft produced
in 2019, work to update it has not yet resumed, and no date has currently been set for that work to begin. It should not be treated as reflecting the current position on the scheme.
Edited to comply with forum rules