• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Tyne and Wear Metro - Washington loop extension

vic-rijrode

Member
Joined
31 Aug 2016
Messages
440
I would imagine that would go down like a lead balloon for users at the stations between Pelaw & Sunderland going from 5tph (soon to be 6tph) to 3tph.

I still can't help think the project will quietly get shelved on grounds of cost, and replaced with a fast busway.
I cannot imagine for a moment that "half one way and half the other" would be introduced. 3tph each way may just be acceptable to Washington N & S etc. but not on the existing Pelaw-Sunderland-South Hylton line considering the population that line serves...
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,336
Location
Hertfordshire / Teesdale
I cannot imagine for a moment that "half one way and half the other" would be introduced. 3tph each way may just be acceptable to Washington N & S etc. but not on the existing Pelaw-Sunderland-South Hylton line considering the population that line serves...

That being the case (and I agree it would be politically unviable to reduce frequency at least between Pelaw and Sunderland), this essentially leaves two options

Either the new service will need to run through Newcastle to a turn back location north of the city centre, or it would have to run as an extension of the existing South Hylton services terminating at Pelaw, with Newcastle-Washington journeys essentially requiring a change there.

The whole thing is actually quite messy.
 
Joined
4 Jun 2025
Messages
35
Location
Tyneside
I would imagine that would go down like a lead balloon for users at the stations between Pelaw & Sunderland going from 5tph (soon to be 6tph) to 3tph.
It would depend how long it takes to go around the new loop but the stations from Seaburn through to Pallion might not notice much difference, being accessible from both directions. I'd be interested to see proposed services and timings either way.
 

CLH

Member
Joined
1 Jul 2015
Messages
24
I guess you need extra trains and an additional “line” that runs from North of Newcastle city centre (Monkseaton or Regent Centre maybe)? That extra line probably needs to terminate somewhere though (Sunderland or Park Lane maybe).

I think turfing people off at Pelaw while simpler would not be politically popular.

That helps you bring back peak trains too, with the added benefit of them running all day with additional capacity in the core.
 

Magrar

On Moderation
Joined
20 Jun 2026
Messages
195
Location
Reading
It's bizarre that they don't even mention Nissan.

The proposed "Washington South" station is just 2,000m from the front door, along the A1290.
 

inais20

Member
Joined
12 Nov 2014
Messages
87
Is it just me or is the plan for everything south of ”Washington South“ a bit, pointless? With an expensive, listed viaduct to restore, a new stretch of line containing no stations and a rebuild of South Hylton station to pay for I can’t see how it would justify itself?
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,083
Is it just me or is the plan for everything south of ”Washington South“ a bit, pointless? With an expensive, listed viaduct to restore, a new stretch of line containing no stations and a rebuild of South Hylton station to pay for I can’t see how it would justify itself?
I guess it depends what the expected demand is between Washington and Sunderland.

Also, would it be faster to Sunderland that way from Newcastle (assuming no change at Pelaw)?
 

deanmachine

Member
Joined
13 Jul 2019
Messages
51
Location
South Tyneside
Is it just me or is the plan for everything south of ”Washington South“ a bit, pointless? With an expensive, listed viaduct to restore, a new stretch of line containing no stations and a rebuild of South Hylton station to pay for I can’t see how it would justify itself?
Yeah, why would anyone in Washington, in the City of Sunderland, want to go to Sunderland?
 

inais20

Member
Joined
12 Nov 2014
Messages
87
Yeah, why would anyone in Washington, in the City of Sunderland, want to go to Sunderland?
I don’t disagree that there’s probably *some* flow of Washington residents into and out of Sunderland on a daily basis but given how little impact this line has on the centre of Washington I really can’t see the economic case winning over, say, improved bus services which can go right into where people actually live.

I’m assuming Nexus will publish the cost benefit analysis as part of the business case, it’ll be interesting for sure to see the numbers.
 

Andymo

Member
Joined
24 Dec 2018
Messages
30
Yeah, why would anyone in Washington, in the City of Sunderland, want to go to Sunderland?
Very few in my opinion, and nobody is producing the data to counter that view yet.

Passenger flow follows economic drivers not governance boundaries and the vast majority of the traffic will be north from Washington.

The existing and historical low passenger numbers on the line from Park Lane and the old heavy rail service are in line with my view.

Are there multiple heavily used bus services or cars on congested roads serving this flow now? I would suggest not, and indeed any passenger flow could represent abstraction from the existing (my old commute would saving a few minutes).

The loop south of Washington represents most of the cost in both land acquisition and engineering through very low population density and little potential for growth. It shouldn’t be on the agenda.
 
Last edited:

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,336
Location
Hertfordshire / Teesdale
Very few in my opinion and nobody is producing the data to counter that view yet. Passenger flow follows economic drivers not governance boundaries and the vast majority of the traffic will be north from Washington. The existing and historical low passenger numbers on the line from Park Lane and the old heavy rail service are in line with my view. Are there multiple heavily used bus services or cars on congested roads serving this flow now? I would suggest not and indeed any passenger flow could represent abstraction from the existing (my old commute would saving a few minutes).
The loop south of Washington represents most of the cost in both land acquisition and engineering through very low population density and little potential for growth. It shouldn’t be on the agenda.

I suspect there will end up being a political angle to all this, as in it could become politically controversial if Washington gets a link to Tyneside (ie Newcastle) but not to Wearside (Sunderland).

The distance from Washington to South Hylton is very small and the alignment is intact and almost all there, unfortunate that it’s all suddenly got more complex than it really needed to be.

I don’t think losing woodland or a bridleway should be justification for substantially increasing construction costs, if that indeed is the case. I can see some justification in avoiding level crossings.
 

Andymo

Member
Joined
24 Dec 2018
Messages
30
I agree, there’s also the cost of an A19 underpass, land acquisition, re-routing roads in South Hylton, remodelled station, an entirely new SE curve off the viaduct and works to the Victoria viaduct itself.

It’s worth looking on a map to see how few live in the area west of the A19 and the figures for ridership from South Hylton onwards to Sunderland which are low. There’s also data on commuting patterns by all modes which doesn’t support the loop.

If Nexus have the data, that’s fair enough. but it’s not forthcoming.

Politics and parochialism may well be at play, and happy to be shown to be incorrect as a user and enthusiast for Metro.
 
Last edited:

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,336
Location
Hertfordshire / Teesdale
I guess you need extra trains and an additional “line” that runs from North of Newcastle city centre (Monkseaton or Regent Centre maybe)? That extra line probably needs to terminate somewhere though (Sunderland or Park Lane maybe).

I think turfing people off at Pelaw while simpler would not be politically popular.

That helps you bring back peak trains too, with the added benefit of them running all day with additional capacity in the core.

If changing at Pelaw in undesirable, then it would essentially have to be an extra 6tph through the city centre, assuming a standard 6tph service. A new bay platform at Benton (think there’s some empty land on the inbound side there) would work fairly well, possibly with the services extended to Monkseaton at peak times?
 

MetroTyler

Member
Joined
17 Oct 2024
Messages
93
Location
Newcastle Upon Tyne
What about the people in Sunderland who work in Washington? It works both ways.
This is pretty much why it makes sense; the loop provides timely transport from Sunderland and Newcastle and ultimately forms a greater connection for jobs.

The chances are, it'll allow Washington as an area to expand in housing and employment opportunities - this is also a point made in the Washington case.

It is a costly endeavour, but should pay off economically, especially when compared with any other reasonable Metro extensions.
 

DGH 1

Member
Joined
14 Jan 2020
Messages
386
Location
County Durham
This is pretty much why it makes sense; the loop provides timely transport from Sunderland and Newcastle and ultimately forms a greater connection for jobs. Chances are, it'll allow Washington as an area to expand in housing and employment opportunities - this is also a point made in the Washington case. It is a costly endeavour but should pay off economically, especially when compared with any other reasonable Metro extensions.
I agree completely, what ever happens, it's going to benefit the area massively in my opinion.
 

inais20

Member
Joined
12 Nov 2014
Messages
87
But nobody’s arguing that the good people of Washington shouldn’t have good public transport links to Sunderland (and vice versa). The real question is whether this hugely expensive proposal is the most cost effective way of doing it.

In the final business case I’d really like to see a comparison with other modal options, such as improved bus services (maybe even a Bee Network-style solution for the region).
 

LLivery

Established Member
Joined
13 Jul 2014
Messages
1,711
Location
Southeastern land
I've also been wondering what the proposal is for actual service.

It would be a little more expensive, but I can see merit having a branch to Station Road Penshaw, terminating the Green Line services there, and sending the Washington services through to Sunderland, with a turnback wherever it can fit north of Sunderland station, potentially around Stadium of Light.

I don't know capacity of the network up there, but I'd then run a 'new line' from either the Airport or Regent Centre turnback to St Peter's/Stadium of Light via Washington.
 

DGH 1

Member
Joined
14 Jan 2020
Messages
386
Location
County Durham
But nobody’s arguing that the good people of Washington shouldn’t have good public transport links to Sunderland (and vice versa). The real question is whether this hugely expensive proposal is the most cost effective way of doing it.

In the final business case I’d really like to see a comparison with other modal options, such as improved bus services (maybe even a Bee Network-style solution for the region).
Please See comment #68
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,567
Location
Macclesfield
In the final business case I’d really like to see a comparison with other modal options, such as improved bus services (maybe even a Bee Network-style solution for the region).
I think the Washington South - South Hylton rail connection is a questionable commitment; especially given the work required to Victoria Bridge, the new alignment on the south bank of the Wear and the disruption it'll cause getting it under the A19; but it must be said that the 56 bus between Newcastle, Washington and Sunderland has gone from strength to strength over the past twenty years or so, to the extent that going beyond the current double decker every twelve minutes probably does suggest that a rail solution might be pragmatic.

It's quite the turnaround when you consider that the Sunderland Metro extension in 2002 resulted in the rapid removal of the competing Go Ahead X64 express bus service from Newcastle, though serving different local markets to the 56, and there'd still be demand for a local service between Washington and Sunderland via Hylton.

== Doublepost prevention - post automatically merged: ==

It would depend how long it takes to go around the new loop but the stations from Seaburn through to Pallion might not notice much difference, being accessible from both directions. I'd be interested to see proposed services and timings either way.
From Seaburn, and I suspect the other two stations north of the river, I'm reasonably confident we wouldn't consider going round via Washington. If passengers from the likes of Millfield, Pallion and, certainly, South Hylton might consider the route via Washington to be faster, though, then that might free up some room on a reduced frequency of Metros on the Durham Coast route. Though I suspect not much.

== Doublepost prevention - post automatically merged: ==

I could see this being descoped to a Pelaw - Washington South extension for cost reasons in the coming years, to be fair - Maybe running to Benton at the North End if that turnaround siding is still available.

In an ideal world, I'd consider connecting that up to the oversubscribed Ashington heavy rail service to be a greater priority than establishing a Wear loop to match the Tyne one, personally. Surely a new link at Northumberland Park and electrification of an existing operational formation largely on the level would be cheaper than the engineering proposed south of Washington?
 
Last edited:

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,459
Location
Isle of Man
The obvious route would be to continue along the old track alignment through the errr... ancient woodland. So the bit that would be destroyed is not at all ancient.
Look at HS2 from the sky. The construction space is significantly wider than the alignment. So yes, the woodlands either side of the alignment would be destroyed.

I have a feeling it'll be 3tph in each direction giving 6tph Newcastle to Sunderland with half going each way around the new loop.
I don’t.

There is no reason why it couldn’t be 12tph Pelaw to Regent Centre. It’s what runs/ran with the peak extras.
I still can't help think the project will quietly get shelved on grounds of cost, and replaced with a fast busway.
I can’t see it becoming a guided busway. Whether or not it gets built, who knows (and I’m sceptical), but it won’t be a busway.

== Doublepost prevention - post automatically merged: ==

In the final business case I’d really like to see a comparison with other modal options, such as improved bus services
Bus services between Newcastle, Gateshead, and Washington, and between Heworth and Washington, are already about as good as you’re ever going to get them.

There’s a limited stop express bus from Washington to Newcastle every 12 minutes. Trouble is, it takes 40 minutes. Which is why Go North East have cut the frequency down from every 10 minutes. Similar with the 4 to Heworth and the 56 too.

If you want to get modal shift it needs Metro.
 
Last edited:

John R

Established Member
Joined
1 Jul 2013
Messages
6,083
Look at HS2 from the sky. The construction space is significantly wider than the alignment. So yes, the woodlands either side of the alignment would be destroyed.
That's a fair point to some extent, but I would imagine the land take on either side of reconstructing a disused trackbed to around 50mph standard would be an order of magnitude less than for a completely new alignment engineered for 200mph+ and for which the majority is at a different level to the existing land.
 

deanmachine

Member
Joined
13 Jul 2019
Messages
51
Location
South Tyneside
Very few in my opinion, and nobody is producing the data to counter that view yet.

Passenger flow follows economic drivers not governance boundaries and the vast majority of the traffic will be north from Washington.

The existing and historical low passenger numbers on the line from Park Lane and the old heavy rail service are in line with my view.

Are there multiple heavily used bus services or cars on congested roads serving this flow now? I would suggest not, and indeed any passenger flow could represent abstraction from the existing (my old commute would saving a few minutes).

The loop south of Washington represents most of the cost in both land acquisition and engineering through very low population density and little potential for growth. It shouldn’t be on the agenda.

The 56 that runs between Sunderland and Newcastle straight over the Leamside at the proposed Washington North Station is a 12 minute double decker service that runs 23 hours of the day 7 days a week, the only service in the North East of England to run that many hours of the day 7 days a week. But sure, nobody would want to use a metro that goes that way.
 

Andymo

Member
Joined
24 Dec 2018
Messages
30
Indeed the 56 does run hourly overnight and frequently by day but it also runs north of the Wear serving the areas and industry along Wessington Way/IAMP and it’s more heavily loaded on the leg from Newcastle to Washington rather than Washington to Sunderland in my experience. That service would still be needed as obviously that flow is not served by the loop. The question needing to be answered is how many passengers travel from Washington to Sunderland centre or to points on the route from South Hylton to the centre.
I commuted south of the Wear through Washington at times and loadings are light on the services there such as the 2, the X1 being changed to serve points south rather than along the Wear to Sunderland centre several years ago.
I am not saying “nobody” travels just that passenger flow is “few” and not in the realm of needing mass transit ie not in the millions. I am pretty sure there would be high numbers travelling north from Washington. If still commuting I would use the Metro from Gateshead via Washington but that would be abstraction since I would normally have done the same commute on Metro via Sunderland centre.
There is an old document on commuting patterns to areas of employment in Tyne and Wear which is worth a look but Nexus really should be providing new data to the public to justify such a major project as then we wouldn’t need to speculate.
 
Last edited:

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,459
Location
Isle of Man
Technically there's no reason not to, but there are monetary reasons. Does the system need double the existing capacity to Sunderland?
It's not about Sunderland itself, it is about the intermediate stations. The system does need the existing capacity at Stadium of Light to Fellgate; halving it to 3tph would be disastrous.

If they can't afford a 5tph or 6tph service on the Washington line then they can't afford the Washington line.
 

Top