dk1
Veteran Member
Yes, quite an over dramatic choice of phraseI haven heard't the exact phrase either, but the concept certainly reminds me of Disaster Area...
Yes, quite an over dramatic choice of phraseI haven heard't the exact phrase either, but the concept certainly reminds me of Disaster Area...
I don't think that's correct. What other designs of intercity trains have been built for British railways in the past 20 years? The Class 745 (arguments over definitions aside) was a small order, as was the Class 397. Pretty clearly the IET has effectively become the default when ordering new intercity trains.
Yet this is what most other countries do, and what we have done in the past. There are risks of putting your eggs in one basket, but these are outweighed by the advantages of having a single type of train in terms of economies of scale and ease of operation and maintenance. The classic reference case is Transpennine Express's order of three different train types. Had they gone for a single order of 80Xs they would have been in far better shape. We don't have a very large market for intercity rolling stock and attempting to sustain multiple suppliers means losing economies of scale.
The Class 805 and 807 were ordered after the Auroras and have been in service for a couple of years now. It seems Hitachi can build their standard 80X design fairly effectively, but the bespoke features of the 810 have caused a lot of problems.
We're talking about what was available to purchase. I don't think the Pendolino or Voyager/Meridian designs were still available when the IET programme came around.It was the only new train at the time, but there were plenty of still relatively young Pendolinos and Voyagers/Meridians around. As I said, it was the new kid in town.
Other posters have pointed out the very legitimate drawbacks of 26 metre vehicles in terms of seats to door ratios (dwell times), carriage width and needing stiff suspensions to not bust the kinematic envelope.
The 745s interior doors have been permanently open every time I’ve travelled on them. And I’ve cleared the class, so often enough.I don't think I understand what you mean, sorry.
The 745's seating areas are separated from the exterior doors by means of an interior door and partition.
3. LNER trains are too short. So they are ordering a micro fleet of longer trains so that they can run more services with doubled-up 5 car units. Who in their right mind thought that putting 5-car services on all-day diagrams to/from Leeds (one of the busiest long distance routes in the country) made sense?So what have learnt so far?
1. XC trains are too short. But their fleet size was and is still rigorously controlled by DfT, even though there are unused units of the same class available.
2. EMR trains are too short. Their fleet size was also agreed by DfT.
By the way, how many threads on these subjects have we got now?
3. LNER trains are too short. So they are ordering a micro fleet of longer trains so that they can run more services with doubled-up 5 car units. Who in their right mind thought that putting 5-car services on all-day diagrams to/from Leeds (one of the busiest long distance routes in the country) made sense?
GWR's Camarthen services, among others, would need a rethink if you took away all of their 5 car units.One could even argue for sending 9s from LNER to GWR and cascading all the 5s to XC, and backfilling with even more 897s. The capacity uplift of even a 5 car 80x from a 4-5 car Voyager is significant. ScotRail could potentially also be interested instead of the broken old tat they're actually getting from EMR.
GWR's Camarthen services, among others, would need a rethink if you took away all of their 5 car units.
And if that means not going to certain places once a day that can only take a 5 car, so be it, I'd say.
If there are services where portion working is unavoidable due to signal positions (platform lengths can be dealt with by way of ASDO) then a few might need to be retained for those services. Equally one could question whether there is really value in through intercity services that can't even come close to filling a full length train. What worked them in HST days and why can't a full length 80x do it now?
A 9-car 80x is longer than an 8-car HST, and you have to remember many of the HSTs were 7-cars when they started so any spare infrastructure length was eked out when the HSTs were lengthened.
In LHCS days many routes the full set didn’t go to destination, take Cornwall a lot of the train was taken off at Plymouth etc.
The original idea was 10 to Plymouth, 5 beyond, but this was soon binned off as inadequate. Most Penzance trains are 9 these days.
Can a 9 not go to Carmarthen even if you have to use ASDO for half of it? Sometimes signalling is an issue here (e.g. on the Marston Vale) but it's fairly rare.
No, 9 cars don’t fit behind the starting signals and if you run the train off the former Aberystwyth end of the platform it blocks the barrow crossing which is the only way to get between platforms as there is no footbridge or subway.
You could possibly lengthen at the Aberystwyth end but would mean building a station footbridge.
Doesn't sound like a terrible idea to be honest, certainly better than retaining a 5 car fleet for one service*. Barrow crossings being the only way to cross the line really should have gone out with the ark.
* Oxford services at 5 car are always overcrowded, though really the answer to that is to wire to Oxford so the turnbacks are served by 12 car EMUs.
Doesn't sound like a terrible idea to be honest, certainly better than retaining a 5 car fleet for one service*. Barrow crossings being the only way to cross the line really should have gone out with the ark.
That said, the arrangements at Carmarthen shouldn’t be dictating the provision for an entire line. The station should really have been remodelled as part of the IET project.
In the case of Carmarthen it’s probably the most sensible way of doing things. The barrow crossing crosses a headhunt which nowadays sees virtually zero use.
That said, the arrangements at Carmarthen shouldn’t be dictating the provision for an entire line. The station should really have been remodelled as part of the IET project.
Or alternatively the service should have been curtailed to Swansea and Carmarthen served by a more frequent, clockface connecting TfW service. Though I appreciate that is a bit political, I do question the value of GWR's odd extensions, and if it was more like the WCML it would just be Plymouth/Penzance, Bristol via Bath and Swansea, twice an hour each.
Or alternatively the service should have been curtailed to Swansea and Carmarthen served by a more frequent, clockface connecting TfW service. Though I appreciate that is a bit political, I do question the value of GWR's odd extensions, and if it was more like the WCML it would just be Plymouth/Penzance, Bristol via Bath and Swansea, twice an hour each.
Indeed in a sensible world that would include the wires going to Swansea and a pure EMU service.
I’ve never really understood the point of the Carmarthen services, apart from that they exist for political reasons.
Apart from the odd IC services to Wrexham and maybe Harrogate and Skipton, other infrequent extensions on LNER and AWC serve significantly bigger populations than the combined total of Llanelli, Burry Port and Carmarthen (about 75k), and often over much longer distances.No different to WCML running 5 a day to Holyhead or 2 a day to Blackpool and 1 a day to Wrexham.
Or on ECML running 1 a day to Hull and Inverness, 4 a day to Aberdeen etc.
Limited amounts of direct through services to London usually are political. There’s lots of anomalies around the country whether it be intercity or the odd direct regional train London to Harwich or London to Stratford-upon-Avon etc.
The Summer Saturday workings to West Wales are no different they provide the necessary extra capacity to holiday destinations such as Tenby by providing direct links from Bristol area etc.
Identical to the door layouts of some Mark 1 and early Mark 2 loco-hauled coaches.What defines InterCity for me is a quality of environment that suits a long distance journey and trumps travelling by car. Linespeed is irrelevant.
I certainly don’t want to be exposed to the elements at every station stop in suburban train style, something which makes the current 745/755 internal layout ‘regional’ in my eyes.
Yes. TSOs. Luckily very long banished on IC services. Before they went, quite a few were modified by blocking the door off with a luggage rack.Identical to the door layouts of some Mark 1 and early Mark 2 loco-hauled coaches.
Identical to the door layouts of some Mark 1 and early Mark 2 loco-hauled coaches.
Personally I can see the argument for the through ECML Inverness service being rather marginal, however the Aberdeen extensions are pretty busy and operate instead of the usual ScotRail nearly clockface semi fasts between Edinburgh and Aberdeen. So rather than consider whether the exceptions are worth it, might there be an argument to consider making ECML Aberdeen - Kings Cross an hourly clockface norm?I'm not absolutely wedded to having LNER run through to Aberdeen or Inverness – and if the through services were replaced with regular intercity-standard express services to Edinburgh running every hour from Inverness and probably every half-hour from Aberdeen, I wouldn't object to the through services being cut – but I can see a lot more justification for those than for the extension to Carmarthen.
What defines InterCity for me is a quality of environment that suits a long distance journey and trumps travelling by car. Linespeed is irrelevant.
I certainly don’t want to be exposed to the elements at every station stop in suburban train style, something which makes the current 745/755 internal layout ‘regional’ in my eyes.