quantinghome
Established Member
- Joined
- 1 Jun 2013
- Messages
- 2,847
There is nothing good about 4-5 carriage intercity trains. It's a ridiculous idea which has caused problems wherever it's been implemented. I don't know where the obsession has come from but it needs to stop immediately.
The Voyagers were a fiasco from the start. Even now, when they have finally got a bit more rolling stock to run doubled up trains they have to run half the train out of service because they don't have the staff to have both units in operation.
LNER and GWR frequently turn out single 5 car trains for services intended to be a 10 car doubled up formation.
EMR's new trains have been an absolute fiasco because someone decided it was necessary to have 5-car trains which could be doubled up, thus requiring Hitachi to redesign their train. Ordering standard length 9-car Class 80X trains would have saved a whole world of pain.
Having done a fair bit of rail travel this summer, it's interesting to compare equivalent services in Europe. They seem happy to run long trains (14 carriages or more) and seem unconcerned that this means they are fairly empty for a considerable amount of the day.
EMR, Cross country and Transpennine intercity networks all need more stock. We should stop faffing around with bespoke this and that. GBR will command considerable economies of scale. Bang in a big order for off the shelf full length trains. Pile the seats high and sell 'em cheap. What's not to like?
The Voyagers were a fiasco from the start. Even now, when they have finally got a bit more rolling stock to run doubled up trains they have to run half the train out of service because they don't have the staff to have both units in operation.
LNER and GWR frequently turn out single 5 car trains for services intended to be a 10 car doubled up formation.
EMR's new trains have been an absolute fiasco because someone decided it was necessary to have 5-car trains which could be doubled up, thus requiring Hitachi to redesign their train. Ordering standard length 9-car Class 80X trains would have saved a whole world of pain.
Having done a fair bit of rail travel this summer, it's interesting to compare equivalent services in Europe. They seem happy to run long trains (14 carriages or more) and seem unconcerned that this means they are fairly empty for a considerable amount of the day.
EMR, Cross country and Transpennine intercity networks all need more stock. We should stop faffing around with bespoke this and that. GBR will command considerable economies of scale. Bang in a big order for off the shelf full length trains. Pile the seats high and sell 'em cheap. What's not to like?