• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Way to go, whoever drew up the Lymington branch timetable

jupiter

Member
Joined
9 May 2021
Messages
333
Location
Dorset
I take my hat off to you but I wonder how it feels as a driver to pull up at the pier with a ferry arriving at the same time, to have to change ends and drive away while the ferry foot passengers are disembarking. Joke of a timetable.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,261
A half hourly train service that has to fit in with a main line operation, and ferries that don't run half hourly is never going to have perfect connections for all journeys.

Seems to be a problem on the main line railway in any case.
https://www.southwesternrailway.com/plan-my-journey
Due to a train hitting an obstruction on the line between Bournemouth and Southampton Central all lines are blocked.

What's Going On:
Train services running through these stations may be cancelled, delayed by up to 60 minutes or revised. Disruption is expected until the end of the day.

What We're Doing About It:
Response teams are now on site assisting the train that has hit the object. The train that has unfortunately hit the object is now not able to move due to a fault as a result of hitting the object. The train crew are in contact with their fleet maintenance team and until the fault can be rectified, trains are unable to run towards Bournemouth and Southampton Central in both directions.

Long Distance & Mainline Services

Our Weymouth/Bournemouth to London Waterloo and Bournemouth to Winchester services are currently unable to run between Bournemouth and Southampton Central in both directions.

How do I get to my destination?

At the moment trains are now unable to run between Bournemouth and Southampton Central in both directions due to the power to the track being switched off whilst the fault is attempted to be fixed by the teams on site. This means that there will be delays and cancellations to these services. Please do keep checking journey planners. We are currently arranging for your tickets to be accepted on local buses between Southampton and Weymouth and will update if these are confirmed.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,941
Location
Up the creek
Recollection from when I used to travel that way regularly is that the two made reasonable connections, but then Wightlink changed the ferry timetable. Not that they made much effort to cater for the slightest delay: a dozen people coming off the train to see the gangway (they were still using it) just starting to lift and being greeted by a smiling member of staff telling us not to worry as that was the previous ferry running late.
 

sharpener

Member
Joined
4 Oct 2018
Messages
371
greeted by a smiling member of staff telling us not to worry as that was the previous ferry running late

Seems endemic where there are two different operators.

E.g. Bus 164 from Salcombe to Totnes is run by Tally Ho!. 93S is run by Stagecoach to a modified timetable from Torcross to Kingsbridge and often delayed by the culvert works in the centre of Kingsbridge (they can't organise a S/bound exit from the bus station so it has to go all round the town).

On my last trip the 93S arrived 20 late and pulled up right behind the 164, which promptly left leaving any transfer pax firmly behind.

Of course if the Primrose Line had remained open it would have been a lot easier. Think what tourist revenue it would be raking in these days...
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,099
I take my hat off to you but I wonder how it feels as a driver to pull up at the pier with a ferry arriving at the same time, to have to change ends and drive away while the ferry foot passengers are disembarking. Joke of a timetable.
Is this the railway's fault or the ferry operator's issue?
 

MrC

Member
Joined
20 Nov 2009
Messages
218
There's always been complaints about the Lymington connections, whether at the ferry or for up/down trains at Brockenhurst. Plus the sectional running times for the branch don't really give much leeway to cater for changes to other services at either end (also tide/weather dependant). So having a max 30 min wait isn't really a killer - there's a waiting room/cafe on the quay. Travellers just need to check their ferry/branch/mainline times before travelling.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,634
Whats considered the more important? Ferry connection or connection at Brockenhurst?
 

MrC

Member
Joined
20 Nov 2009
Messages
218
Whats considered the more important? Ferry connection or connection at Brockenhurst?
Operationally, neither. There were times when Control might ask for the Lymy to be held such as in disruption and there was a risk of missing the last ferry/train etc. There's quite a few services at Brockenhurst so no real way to synchronise connections.
 

Forty29

Member
Joined
10 Dec 2021
Messages
760
Location
Bicester
It sounds like the ferry connection is well catered for if the thread discussion is about the train and ferry arriving at the same time. Connecting at Brockenhurst shouldn't be a problem either as their are plenty of services aren't there? Sorry should have looked at a timetable before assuming that!
 

PP57601

Member
Joined
3 Jun 2019
Messages
77
I take my hat off to you but I wonder how it feels as a driver to pull up at the pier with a ferry arriving at the same time, to have to change ends and drive away while the ferry foot passengers are disembarking. Joke of a timetable.
This has to be the most pointless thread going on the forum ‍♂️‍♂️‍♂️
 

sjm77

Member
Joined
8 Jan 2020
Messages
330
Location
Manchester
Don't forget that some weekdays the ferry goes every 40 minutes and on others every hour. The train services from Waterloo and the connection to Lymington are every 30 minutes. Clearly that will not work on a day when the ferry runs every 40 minutes. I blame the ferry.
 

Top