• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Next priority project: Requadrupling the MML- Wigston to Syston.

Johnnie2Sheds

Member
Joined
10 Jan 2011
Messages
193
Location
West Midlands
And electrification through to Elmsall junction. The three East Midlands cities on the Midland, along with Sheffield should be electrified as a matter of urgency for the survival of the line. The layout at Leicester needs the Derby treatment to allow higher speeds and greater freight capacity. Trent junction needs remodelling to allow greater speeds if possible.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,263
I don't see why the extension of electrification all the way to beyond Sheffield would alter the chances of "survival" of the line?

The line is extremely unlikely to close barring some catastrophic natural disaster or similar event.

At this time, electrification through to the Leeds-Doncaster line (but not to Doncaster itself?) doesn't seem to gain the railway very much for the enormous expense.
EMR has its fleet of new electrodiesels either way.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,207
Location
Oxford
I don't see why the extension of electrification all the way to beyond Sheffield would alter the chances of "survival" of the line?

The line is extremely unlikely to close barring some catastrophic natural disaster or similar event.

At this time, electrification through to the Leeds-Doncaster line (but not to Doncaster itself?) doesn't seem to gain the railway very much for the enormous expense.
EMR has its fleet of new electrodiesels either way.
Finishing the electrification between Leicester and Nottingham/ Leeds/ Doncaster, along with Birmingham to Derby are the kind of thing which should be tackled in the medium term.

Then a new batch of straight electric trains could allow the 810s to be cascaded to somewhere the bimode design could offer benefits, and we'd have no more requirement for 125 operation away from the wires.

As for 4 tracking through Leicester, if that solves an actual problem then that should be somewhere on the wishlist.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,733
Location
Newport
MML priority 1 - Timetable*
Priority 2 - Wires
Priority 3 - London terminal capacity


* Flitwick (for example) to Derby - Four trains!
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,156
MML priority 1 - Timetable*
Priority 2 - Wires
Priority 3 - London terminal capacity


* Flitwick (for example) to Derby - Four trains!
I’m not sure what you mean by four trains between Bedford and Derby. Please elaborate why this is a higher priority than electrification.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,251
There's the 16.10, change at Bedford - which doesn't appear on NRES as far as I can see.

What's the other one?
Derby / Sheffield trains call at Bedford on Sunday mornings during the two-track railway period.

However, I am not sure that four tracks through south Leicester is the thing that unlocks easier journeys from Flitwick to Derby.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,733
Location
Newport
I’m not sure what you mean by four trains between Bedford and Derby. Please elaborate why this is a higher priority than electrification.
The timetable is a higher priority than electrification because it doesn’t need the wires to make it happen.

Currently Bedford or Luton to Derby or Sheffield needs 3 trains changing at Kettering and Leicester at most times of the day. Start from (my example) Flitwick or another intermediate and you add a 3rd change/4th train.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
There's the 16.10, change at Bedford - which doesn't appear on NRES as far as I can see.

What's the other one?

0639, 0711, 0739 off Bedford to Nottingham each weekday (and similar times Saturday), connections from Flitwick and other stations further south.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,293
Location
The Fens
However, I am not sure that four tracks through south Leicester is the thing that unlocks easier journeys from Flitwick to Derby.
What unlocks this is a platform on the up fast line at Bedford.

Hopefully that will come as part of the Bedford rebuild for East West Rail.

The objective will be easier journeys from the north to Wixams/Stewartby for Universal, from which Flitwick will also benefit.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,253
Location
Swansea
Leicester would benefit from 4-tracking, especially from Wigston to Leicester station.

The main beneficiaries of electrification need the Birmingham line to be wired. That seems further down the list. You could have EMUs on the Ivanhoe line, and maybe a local to Derby, but that does not really create the benefits now the 810s exist. This also needs there to be more capacity on Birmingham to Leicester and I am not sure that can be done. Perhaps a local service from Nuneaton to Leicester to give a second train per hour at the stops on that section and extend the current Birmingham to Leicester to Nottingham?

I would be inclined to run London to Sheffield like London to Norwich. That might not be "InterCity", but it would be suitable for the line length and offer the requisite shorter dwells and acceleration to allow more stops south of Leicester. That would need electrification.

So the priority to me would be getting the layout at Leicester sorted and laying tracks in a way that would accommodate electrification at a later stage.
 

Top