• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Scrap EMR Connect and extend Thameslink to Corby

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,205
Location
Oxford
If anything, I'd say that has a slightly stronger case, unless another destination could be found for the Paddington (future Old Oak Common?) terminators.
Keeping the GEML and GWML separate is a good reason to limit the scope to OOC.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

NorthKent1989

Established Member
Joined
13 May 2017
Messages
2,168
If anything, I'd say that has a slightly stronger case, unless another destination could be found for the Paddington (future Old Oak Common?) terminators.

Didcot is quite far out though, it’s in Oxfordshire, I doubt TfL would run services out that far.

However if the EL weren’t a TfL service and was part of a wider CrossRail network of rail services (RER style) it would be a different story.


Keeping the GEML and GWML separate is a good reason to limit the scope to OOC.

Agreed.
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,242
Keeping the GEML and GWML separate is a good reason to limit the scope to OOC.
Didcot is quite far out though, it’s in Oxfordshire, I doubt TfL would run services out that far.

However if the EL weren’t a TfL service and was part of a wider CrossRail network of rail services (RER style) it would be a different story.
The emphasis is very much on the "slightly", compared to Thameslink services to Corby.

I thought the GEML part of Crossrail services was mostly self-contained, with the GWML generally causing most of the delays as it is.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,205
Location
Oxford
Operationally Crossrail has the electric lines to itself, but if something affects the signalling then it may impact all 4 - and during disruption Crossrail may use the mains, or GA may use the electrics. The knock ons from that are what you want to keep clear of the GWML.
 

Top