The plan is for 96TS to be refurbished there.The chances are, that once the 1992 work eventually finishes, there will be no future work and the facility will be mothballed.
The plan is for 96TS to be refurbished there.The chances are, that once the 1992 work eventually finishes, there will be no future work and the facility will be mothballed.
More than likely due to the delays in CLIP as the intent was for the facility to do S Stock heavy work on this site, but it's now due at the same time.The chances are, that once the 1992 work eventually finishes, there will be no future work and the facility will be mothballed.
So looks like the plan is to do everything there.The plan is for 96TS to be refurbished there.
Or the 95, they're starting to look equally tired. Wasn't the 96 refurbished within the last decade?The S stock? Surely the '09 stock is in more need?
The last I heard the 96TS was more along the lines of life extension work than a refurbishment - although the refurbishment (refresh) at Stratford was more internal only. 96TS work is something that probably would historically have been done via TMU like the 72TS extension works.More than likely due to the delays in CLIP as the intent was for the facility to do S Stock heavy work on this site, but it's now due at the same time.
== Doublepost prevention - post automatically merged: ==
So looks like the plan is to do everything there.
Also, wasn't 1996TS just "Refurbished" in the TFOS at Stratford Market?
Or is this to now do the welding work that's been known about for ages but wasn't done because they money wasn't wanting to be spent?
The 09TS can't practicably fit through the tunnels to get to Acton.The S stock? Surely the '09 stock is in more need?
The 95s are leased from Alstom though until 2031 I think. I assume all work would be done by Alstom.Or the 95, they're starting to look equally tired. Wasn't the 96 refurbished within the last decade?
Something we keep hearing time and time again; they really are rare as hen's teeth.Despite being a daily Central line user the Clip trains have managed to evade me thus far but I’ve finally managed to catch!
Despite being a daily Central line user the Clip trains have managed to evade me thus far but I’ve finally managed to catch one.
Externally, half of one car was completely covered in graffiti, including the windows.
Inside, the brighter lighting, new floors and new moquette have definitely improved the ambience, but none of the panels seem to have been touched with evidence of years of build up of grime and vandalism still visible.
Unlike other interior refreshes, the seats are still well padded and the moquette seems quite loosely fitted.
“The next station is” announcement plays twice, once whilst you’re still pulling out of the station before and then again when on the approach, which seems a bit unnecessary.
I was also surprised to see that they have taken the opportunity to re-fit all the eye-level stickers to indicate to staff what is beneath the seats. These are all individual stickers that look quite easy to peel off, so not sure now long these will last!
The 'serious attempt' has been in the rework of the internals of the trains, the traction motors, the addition of CCTV, wheelchair spaces and displays. I would argue a project that just included repainting/replacing some flaking paint on panels would be far less of a 'serious attempt'.What this shows is that this work really is a “do minimum to keep the trains in service”, rather than a serious attempt to refurbish them.
The 'serious attempt' has been in the rework of the internals of the trains, the traction motors, the addition of CCTV, wheelchair spaces and displays. I would argue a project that just included repainting/replacing some flaking paint on panels would be far less of a 'serious attempt'.
I didn't blame Covid? I don't think there is any denying that CLIP hasn't gone totally to plan, and that financial realities mean that it isn't possible to refurbish the 'nice to haves' like paintwork. I'm not sure 'burying heads [..] in the sand' is the correct term though. TfL committed to CLIP in 2016, back then they were spending all this money just to have a programme that wrapped up in 2022, before fleet replacement in 2028. If they were burying their heads in the sand they would've just said they would try to keep the stock in service until 2028 and not bothered with CLIP.The motors have been giving trouble for decades, and the accessibility work should have happened in time for 2020, so none of this can be blamed on Covid.
This all seems to me more a case of burying heads very firmly in the sand until things reached a point where if the above works weren’t done there would actually have been no Central Line service.
ISTR at one point over half the fleet was unavailable, though they seemed to have managed to keep things ticking over better since that low point.
It is notable that there is certainly a list of things which haven’t been touched.