overthere 2
On Moderation
I came across this thread a while ago when I was searching for something else: https://www.railforums.co.uk/thread...oup-propose-reopening-heathfield-line.148974/. I did some digging around and I found some news stories from the late 20teens to the early 2020s and the plan seemed to be commuter/passenger services Monday to Friday and Heritage trains at weekends, sadly going back now to the news stories most of the links are dead. I also found a website that had the usual Who we are, History of the line, Contact us, etc but when you clicked on anything all you got was blank pages.
I have been keeping an eye on the website "just in case" and a while ago it was updated to a shiny new one but I did not bother to post as a shiny website means nothing.
heathfieldrail.org
There doesn't seen to be any mention of heritage rail on both the old website and this one its all about commuter trains which I am very supportive of:
But if they are still planning it then as we we'll know heritage railways are facing a lot of issues, particularly any new start ups but if things come together then they could potentially catapult themselves forward for penny's:
Stations - Newton Abbott is ready to go and looking at Google maps both Teigngrace and Heathfield station platforms seem relatively intact so they could use a couple of porter cabins as temporary station buildings and you immediately have three stations ready to go including a crucial NR platform connection.
Track - Up until recently the line was being used for freight, so beside a short section that was washed away in a flood, which is now being repaired. It should be good to go for a light railway order and while in the long term the track might need to be upgraded to at least 40mph, as a start, to see if there is a demand for a commuter rail service 25mph should be satisfactory.
Signalling - While the line runs in to Newton Abbott it comes in on a separate branch and in to the bay platform so as long as they do "one engine in steam", it should mean no need for any signalling.
Locomotive(s)/Carriages etc - While getting hold of a heritage diesel/DMU/Pacer and looking after it should not be a major problem, getting hold of a steam engine and maintaining it particularly at the start could be. So to start things off, I am assuming that the engines and coaches on the Paignton and Dartmouth steam railway (DSR) are NR compliant? as they are running in to Paignton station which is NR owned. So what could happen is Heathfield railway rent a steam engine and rake of coaches from the DSR, and in the morning a steam engine and a rake of empty coaches run from the DSR on to the NR tracks to Newton Abbott then on to the Heathfield branch they then spend the day running up a down then head back to Paignton at the end of the day.
Workshops/storage - Right next door to Heathfield station is a large industrial estate so there's bound to be at least one warehouse that they could rent/buy for workshop/storage.
Future extensions - Just North of Heathfield station the track peters out but just North of that there is a big oblong shaped industrial estate that looks like it was built right up to the old track beds boundary so they could run to the East side of that and then go a bit further and put a terminus at the roundabout at the Southern end of Bovey Tracey here: https://maps.app.goo.gl/oQfJN4KzXkz4xwRn7.
They also could rebuild a small bit of the Teign valley line running from Heathfield station to the South of Chudleigh Knighton but sadly no further as the A38 has taken the track bed, perhaps as a narrow gauge railway for those volunteer's who don't want to play with full size trains.
Volunteer's - While a lot of railway's are struggling for volunteers this one could attract a lot right from the start because unlike a lot of start up railway's where it can be at least ten/twenty years from starting up to at least running a diesel industrial shunter and a brake van up and down this has the potential to be up and running in a couple of years.
Other attractions - They are already working with the Stover canal restoration people: https://stovercanal.co.uk/ so when the canal is restored I am assuming the canal people might want to run boat trips so they could work together and offer joint ticket's which gets you both a train ride and a canal boat trip also it would be a pleasant day out to get a train from Newton Abbott to Heathfield/Bovey and then walk back along the canal.
I have been keeping an eye on the website "just in case" and a while ago it was updated to a shiny new one but I did not bother to post as a shiny website means nothing.
Visiting the website recently there are a couple of news stories and it appears they have been quietly getting on with things, with the latest being they are in negotiation with Network Rail (NR) to work on Teigngrace station and according to their website they have already been working on the bay platform at Newton Abbott for a while so I assume NR will give them their blessing.Introducing the New Heathfield Rail Link Website! | Heathfield Rail Link Association
heathfieldrail.org![]()
Introducing the New Heathfield Rail Link Website!
by HRLA | Sep 26, 2025 | Uncategorized | 0 comments
![]()
We are thrilled to announce the launch of the freshly built Heathfield Rail Link Association website: heathfieldrail.org. This marks a major step forward in making our vision, updates, and community engagement more accessible and dynamic.
Built by Falcon Digital under Their National Charity & Community Scheme
This website is much more than a digital address — it’s the result of a meaningful collaboration. The build was handled by Falcon Digital, through their national Charity & Community Scheme, enabling non-profits and community initiatives like ours to gain modern, responsive websites without bearing the full cost themselves.
We’re Not Hanging Around…! | Heathfield Rail Link Association
We’re Not Hanging Around…!
by HRLA | Jun 30, 2026 | Uncategorized | 0 comments
![]()
Unlike last year’s flood damage to a small section of the line between Newton Abbot and Teigngrace crossing, we continue to move forward positively after a recent successful meeting with Network Rail and Railfuture.
We have been in discussions to obtain a Community Order Licence to gain access to Teigngrace Halt, which will allow us to start some clearance work. We look forward to working more closely with NR in the future!
There doesn't seen to be any mention of heritage rail on both the old website and this one its all about commuter trains which I am very supportive of:
We are a community group of volunteers since 2017, working to promote the re-opening of the railway line from Newton Abbot to Heathfield in Devon.
Originally part of the Teign Valley railway line, we believe that the re-opening of the remaining five miles of track to Heathfield will be a valuable asset, easing local transport pressures within the region.
This green environmentally-friendly transport corridor will help the local economy by providing a regular commuter service for the busy town of Newton Abbot.
But if they are still planning it then as we we'll know heritage railways are facing a lot of issues, particularly any new start ups but if things come together then they could potentially catapult themselves forward for penny's:
Stations - Newton Abbott is ready to go and looking at Google maps both Teigngrace and Heathfield station platforms seem relatively intact so they could use a couple of porter cabins as temporary station buildings and you immediately have three stations ready to go including a crucial NR platform connection.
Track - Up until recently the line was being used for freight, so beside a short section that was washed away in a flood, which is now being repaired. It should be good to go for a light railway order and while in the long term the track might need to be upgraded to at least 40mph, as a start, to see if there is a demand for a commuter rail service 25mph should be satisfactory.
Signalling - While the line runs in to Newton Abbott it comes in on a separate branch and in to the bay platform so as long as they do "one engine in steam", it should mean no need for any signalling.
Locomotive(s)/Carriages etc - While getting hold of a heritage diesel/DMU/Pacer and looking after it should not be a major problem, getting hold of a steam engine and maintaining it particularly at the start could be. So to start things off, I am assuming that the engines and coaches on the Paignton and Dartmouth steam railway (DSR) are NR compliant? as they are running in to Paignton station which is NR owned. So what could happen is Heathfield railway rent a steam engine and rake of coaches from the DSR, and in the morning a steam engine and a rake of empty coaches run from the DSR on to the NR tracks to Newton Abbott then on to the Heathfield branch they then spend the day running up a down then head back to Paignton at the end of the day.
Workshops/storage - Right next door to Heathfield station is a large industrial estate so there's bound to be at least one warehouse that they could rent/buy for workshop/storage.
Future extensions - Just North of Heathfield station the track peters out but just North of that there is a big oblong shaped industrial estate that looks like it was built right up to the old track beds boundary so they could run to the East side of that and then go a bit further and put a terminus at the roundabout at the Southern end of Bovey Tracey here: https://maps.app.goo.gl/oQfJN4KzXkz4xwRn7.
They also could rebuild a small bit of the Teign valley line running from Heathfield station to the South of Chudleigh Knighton but sadly no further as the A38 has taken the track bed, perhaps as a narrow gauge railway for those volunteer's who don't want to play with full size trains.
Volunteer's - While a lot of railway's are struggling for volunteers this one could attract a lot right from the start because unlike a lot of start up railway's where it can be at least ten/twenty years from starting up to at least running a diesel industrial shunter and a brake van up and down this has the potential to be up and running in a couple of years.
Other attractions - They are already working with the Stover canal restoration people: https://stovercanal.co.uk/ so when the canal is restored I am assuming the canal people might want to run boat trips so they could work together and offer joint ticket's which gets you both a train ride and a canal boat trip also it would be a pleasant day out to get a train from Newton Abbott to Heathfield/Bovey and then walk back along the canal.