• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Is 5mph the slowest speed limit possible?

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,859
Location
Newport
Carriage wash speed at Temple Mills when washing is 3kmh for 373 and 5kmh for 374; boy does 3kmh feel slow :lol:
I was with an official visit to Eurostar at North Pole via an ECS trip from Waterloo. The final section onto the depot was possibly the wash road and was undoubtedly my slowest train ride ever.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

IlkleyRunner

Member
Joined
14 Feb 2024
Messages
22
Location
West Yorkshire
There's one on the Maesteg branch, certainly. North Berwick as well, although I don't know if it's been changed as I haven't travelled on the North Berwick branch.

No idea of the reasons for either.

North Berwick is still 5 mph - it was set after the long-ago (well 1975) buffer overrun - you could walk in quicker over the last 100m or so! Must require a fair use of the brakes as the last section is definitely downhill.
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,891
With reference to locos fitted with Slow Speed control for discharging wagons, I believe they had a separate speedo that came to life when it was selected, with 0-5mph as the whole range.
 

Dave W

Member
Joined
27 Sep 2019
Messages
885
Location
North London
North Berwick is still 5 mph - it was set after the long-ago (well 1975) buffer overrun - you could walk in quicker over the last 100m or so! Must require a fair use of the brakes as the last section is definitely downhill.
Pretty certain it's 5mph at the platform at Stourbridge Town too - and is also very certainly downhill!
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
881
Location
Ayrshire
Not a track limit per se, however the speed for hump shunting, certainly at Tinsley, was 1.3mph to ensure that one cut cleared the points before gravity took hold on the next wagon, without the need to stop pushing.
The class 13s had separate low range speedometers for this purpose
 

jamesst

Established Member
Joined
4 May 2011
Messages
1,370
Location
Merseyside
The washes at Kirkdale and Birkenhead North depots are only 3mph. (Raised from 2mph). Fairly easy to do as the 777s have a wash mode button that restricts you to that speed.
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
756
Location
Warrington
Does that have a standard speed restriction sign, and if so does it read '0.5'?
Indeed it does in Drax as someone mentioned previously! I found this fascinating when I first saw this picture (not mine for absolute clarity)

[Link redirects to Flickr post of 37901 stood next to a 0.5mph speed restriction sign in Drax]
 

Sean Emmett

Member
Joined
9 Mar 2015
Messages
522
Belaugh Green Level Crossing on the Bure Valley Railway (about a mile west of Wroxham) is an open crossing over a public road.

It has a westbound PSR of 5 mph, but only 2 mph eastbound, due to poor visibility.

From my visit in May 2026 I gather there are plans to upgrade it with barriers, as was done for Spratts Green crossing at the other end of the line, just over a mile out of Aylsham.
 

MR-507508

Member
Joined
17 Jan 2020
Messages
1,020
Location
North West
The washes at Kirkdale and Birkenhead North depots are only 3mph. (Raised from 2mph). Fairly easy to do as the 777s have a wash mode button that restricts you to that
Does the washer at Birkenhead North actually operate and is used?
Evertime I pass it looks as though it has never been used. The brushes are always very white.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,498
Location
Preston Lancs
Not a track limit per se, however the speed for hump shunting, certainly at Tinsley, was 1.3mph to ensure that one cut cleared the points before gravity took hold on the next wagon, without the need to stop pushing.
The class 13s had separate low range speedometers for this purpose
I never knew that and I am a class 13 fan! Makes sense though.
 

jamesst

Established Member
Joined
4 May 2011
Messages
1,370
Location
Merseyside
Does the washer at Birkenhead North actually operate and is used?
Evertime I pass it looks as though it has never been used. The brushes are always very white.
Yep, every Merseyrail and tfw stock that goes on there early evening and at end of service uses it, been through it many times
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,873
Location
East Anglia
Stadler 755s have a 1mph setting for coupling. Lowest actual linespeed I’ve known is obviously 3mph for wash plants and within the shed.
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,808
Location
West is best
Many, many years ago I travelled over the Weymouth Quay line where the railman walked in front of the train on the section through the town. The speed restriction must have been walking pace!
I've imposed a walking pace speed limit before. There was a DMU (with passengers) trapped on a branch and the points ahead of it (it was the return journey) were damaged. These points were now being used in the facing direction for the movement that the train was supposed to be making.

Unknown to the signaller, the points had been damaged during an overnight T3 engineering occupation. They had been run through, but showed detection when the T3 was handed back, hence the signaller not noticing a problem. So the first train of the day was signalled normally along the branch.

When the signaller set the route for the return journey, the points failed to gain detection for the opposite position. So the signaller reported this as a fault. My team and I responded and discovered that the points had been badly damaged.

I advised the signaller that repairs would take a number of hours and that the points could not be used until the repairs had been completed. But I was asked if we could do anything to allow the trapped train to pass over them.

After careful consideration, we made a number of adjustments and fitted two point clips to hold the bent switch rail as tightly as possible up against the stock rail.

Although derailment was unlikely, just in case, the driver was instructed to proceed at walking pace while the train passed over the points and to watch me as I walked along the cess just ahead of the train, with instructions to stop immediately if I indicated for them to do so. Meanwhile my team member closely watched each wheel of the train as it passed over the switch rails of the points.

The driver followed the instructions and the train successfully passed over the points without incident. The branch was closed to traffic after this. Once we had the replacement parts, repair work started.
 

Top