On the WCRC Jacobite website they show a TripAdvisor travellers choice award/badge. Only problem is it's from 2020, not sure if they'll get a 2024 version.
Yes, the problem with proudly displaying trinkets such as that from several years ago is that it immediately begs the question “What’s happened since?”, which can end up not being a terribly good look!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Wolfie

Established Member
Joined
17 Aug 2010
Messages
7,393
Yes, the problem with proudly displaying trinkets such as that from several years ago is that it immediately begs the question “What’s happened since?”, which can end up not being a terribly good look!
There was a restaurant l know of which only recently removed a banner relating to a 2010 award.....

Personally l'm in agreement with you that such things do more harm than good to a business.

Certainly providing safe, sanitary and properly climate-controlled rolling stock should be considered a given on such services.
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,597
Location
South Staffordshire
Do they say anything about the interiors? With that many tables, plenty of places for litter to accumulate.
I am not sure what the staffing arrangements were for the 2024 Jacobite season but I am guessing there was less requirement for stewarding each door since CDL was introduced.
Did the on train stewards do any carriage clean9ng on arrival back at Fort William ?
 

bleeder4

Member
Joined
19 Jan 2019
Messages
792
Location
Worcester
I am not sure what the staffing arrangements were for the 2024 Jacobite season but I am guessing there was less requirement for stewarding each door since CDL was introduced.
Did the on train stewards do any carriage clean9ng on arrival back at Fort William ?
They never stewarded each door anyway! That was the whole reason why their Mk1 licence got revoked.
 

TheLancsNinja

Member
Joined
9 Mar 2023
Messages
104
Location
The North
No it wasn’t. The reason their Mark 1s were prevented from use was a lack of CDL.
Bit of both; because of the lack of CDL, the ORR insisted on them drawing up a stewarding plan to keep the non-CDL doors safe. WCRC then failed two spot inspections, where their agreed plan was not being adhered to, so the ORR forced them to use CDL-only stock because they could not be trusted to adhere to the mitigations already agreed by the regulator.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,730
Bit of both; because of the lack of CDL, the ORR insisted on them drawing up a stewarding plan to keep the non-CDL doors safe. WCRC then failed two spot inspections, where their agreed plan was not being adhered to, so the ORR forced them to use CDL-only stock because they could not be trusted to adhere to the mitigations already agreed by the regulator.
You are conflating two separate regulatory processes.

The first is the operation of the Jacobite service where spot inspections (presumably after a tip-off) revealed non-compliance with the agreed stewarding plan for non-CDL fitted doors. This was subject to enforcement action, twice, including suspension of service.

The second is WCRC's wider non-CDL fitted door issue, which applies to their whole fleet, not just the Jacobite. The ORR signposted several years ago that there would be no further blanket exemptions from the CDL regulations, and agreed time-bound plans with other operators to fit CDL, but allow them to continue running. WCRC chose a diferent route and challenged it via a Judicial Review. Having had their case thoroughly rejected in the Judicial Review process, ORR have terminated the limited exemption that WCRC had that kept them running through the review. Having failed to engage and provide a CDL fitment plan, ORR will not be issuing any further CDL exemptions for WCRC unless or until WCRC change their approach.
 

STINT47

Member
Joined
16 Aug 2020
Messages
860
Location
Nottingham
It is strange the door locks are suddenly an issue. Mk1s have been running for decades without them but of a sudden they need stewards or locks.

I can even remember even HSTs had no locks and you could open a door at 125mph. Insisting on these having locks makes a bit more sense but given the lower speed of the Jscobite it would appear that the regulator just wants to destroy someone's business and people's enjoyment over not very much.
 

cce

Member
Joined
10 May 2018
Messages
77
It is strange the door locks are suddenly an issue. Mk1s have been running for decades without them but of a sudden they need stewards or locks.

I can even remember even HSTs had no locks and you could open a door at 125mph. Insisting on these having locks makes a bit more sense but given the lower speed of the Jscobite it would appear that the regulator just wants to destroy someone's business and people's enjoyment over not very much.
This discussion was had thirty pages back.


Risk appetites have changed.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,864
Location
Devon
We’re clearly starting to go over old ground now. If anyone has anything new to add then feel free to get in touch, but for now we’ll put a pause on proceedings.

Thanks everyone
 

RKynaston

Member
Joined
17 Nov 2017
Messages
38
It would appear the latest attempt to do something with the WCR Mk1 fleet has failed...

.. from https://railwayherald.com/

ORR REACHES DECISION ON STEAMTOWN APPLICATION

The Office of Rail and Road (ORR) has confirmed that it has reached a decision on the application from Steamtown Carnforth, for a new exemption that if granted, would allow the Mk1 coaches it owns to operate with West Coast Railway Company (WCRC) without any form of centrally-operated door locking.

An ORR spokesperson said: "We have completed our assessment of Steamtown’s application for a new exemption around fitment of central door locking. The applicant has been informed of our decision, and the reasons underpinning it." The ORR would not be drawn on the actual outcome of the application, although it is understood that it has not been successful.

West Coast Railway Company did not comment when approached.

EDIT: I should say thats the relevant part of the story, the rest is background history.


Logically if it had succeeded I am sure WCRC would have been shouting, and as per the quoted statement, why would there have needed to be reasons underpinning the decision if it was positive?
 

Isle of Mull

Member
Joined
16 Mar 2025
Messages
283
Location
Ireland
It would appear the latest attempt to do something with the WCR Mk1 fleet has failed...

.. from https://railwayherald.com/

ORR REACHES DECISION ON STEAMTOWN APPLICATION​

The Office of Rail and Road (ORR) has confirmed that it has reached a decision on the application from Steamtown Carnforth, for a new exemption that if granted, would allow the Mk1 coaches it owns to operate with West Coast Railway Company (WCRC) without any form of centrally-operated door locking.

An ORR spokesperson said: "We have completed our assessment of Steamtown’s application for a new exemption around fitment of central door locking. The applicant has been informed of our decision, and the reasons underpinning it." The ORR would not be drawn on the actual outcome of the application, although it is understood that it has not been successful.

West Coast Railway Company did not comment when approached.

EDIT: I should say thats the relevant part of the story, the rest is background history.


Logically if it had succeeded I am sure WCRC would have been shouting, and as per the quoted statement, why would there have needed to be reasons underpinning the decision if it was positive?
To be honest I was never expecting a yes, I suppose they will just have to fit CDL to all the coaches asap
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,597
Location
South Staffordshire
I suppose they will just have to fit CDL to all the coaches asap
Like all other operators of slam door passenger stock have. A real no brainer really but the words "goose" "Golden egg" and "Jacobite" seem to resonate in my head.

During the winters of 2024 and 2025 David Smith could have had 12 or 14 Mk 1s in the works and fitted them with (vacuum / magnetic) CDL. The 2025 and 2026 seasons could have operated with WCRs own vacuum braked steam locos like 44932, 45110 and forthcoming 48151 after its overhaul.

Not only that, the Jacobite Mk1 stock could have operated mainline charters in England with the likes of 35018 etc

But we know that anyway !!!
 

martin butler

Member
Joined
9 Oct 2018
Messages
848
To be honest I was never expecting a yes, I suppose they will just have to fit CDL to all the coaches asap

Expect another round of toys flying from prams, West Coast, if it had done what every other operator of Slam door stock did from day one, would have by now, have had enough mk1 and 2 a coaches, fitted with CDL to operate its tours
 

Isle of Mull

Member
Joined
16 Mar 2025
Messages
283
Location
Ireland
Expect another round of toys flying from prams, West Coast, if it had done what every other operator of Slam door stock did from day one, would have by now, have had enough mk1 and 2 a coaches, fitted with CDL to operate its tours
Absolutely, they are making a fuss of nothing and are trying not to fit CDL for as long as possible
 