• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Is there scope for one supplier and a common policy for all GBR retail facilities?

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,604
Location
Hope Valley
Moderator note: Split from

So does this thread mean that within GBR each ‘division’ will continue to have its own, bespoke, retailing policy?

Is there no scope for ‘commonality’ (let alone a ‘simplified and streamlined’ National fares system)?
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,825
So does this thread mean that within GBR each ‘division’ will continue to have its own, bespoke, retailing policy?

Is there no scope for ‘commonality’ (let alone a ‘simplified and streamlined’ National fares system)?
The description previously offered by the government about GBR at https://www.gov.uk/government/publications/railways-bill/railways-bill-tickets-and-retail suggests things will become more common.
In January 2025, the government announced that GBR would sell tickets as part of the government’s plans to provide a railway fit for Britain’s future. This will replace the numerous websites and ticketing apps run by all of the current DfT contracted train operators, which will no longer be required.
But as GBR doesn’t exist yet, presumably the existing TOC structure under DFTO continues to procure such things as there’s no one else who can?
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,216
You can have a common specification (even for service components) for all suppliers to give seamless ticketing.

You can buy nuts 'n bolts from different suppliers that fit together.

WAO
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
"One supplier"

...the words eggs and baskets spring to mind.

This isn't really relevant when it comes to in-person ticketing because you can only use the TVM or booking office at the station you have just rocked up at, you can't use the ticketing services at a station miles away. Thus you only gain resilience with online ticketing options.

That being the case, economies of scale are more valuable.

== Doublepost prevention - post automatically merged: ==

But as GBR doesn’t exist yet, presumably the existing TOC structure under DFTO continues to procure such things as there’s no one else who can?

I'm inclined to think that's why it is, though I do think DfTO should take on some of that role and let more overarching contracts, certainly for online retail.
 

Stephen42

Member
Joined
6 Aug 2020
Messages
803
Location
London
Moderator note: Split from

So does this thread mean that within GBR each ‘division’ will continue to have its own, bespoke, retailing policy?

Is there no scope for ‘commonality’ (let alone a ‘simplified and streamlined’ National fares system)?
No, it's too early to know the finer details of GBR procurement strategies.

In any case for the procurement in that thread, the original tender notice included:
The framework agreement awarded to the preferred bidder(s) will include a term of up to 8 years, and allow other DfT Operator Limited subsidiaries to call-off from.
More public procurement notices are including such language allowing sister TOCs to call off on frameworks setup by a primary TOC within the DfT Operator umbrella. The lot values would cover 2 to 3 times the number of units for Southeastern to be called off for other operators, whether it will happen or not is another question.
This isn't really relevant when it comes to in-person ticketing because you can only use the TVM or booking office at the station you have just rocked up at, you can't use the ticketing services at a station miles away. Thus you only gain resilience with online ticketing options.

That being the case, economies of scale are more valuable.
The one supplier issue is more that it could kill off the competitive market. At the end of the deal the winning supplier can name their price as everyone else will have stopped serving the market. While there's ways to tackle that, consolidating off the shelf software systems seems the easier way to unlock initial cost savings. Then can develop a strategy for integrated hardware for TVMs/information systems at stations and in the meantime do bigger orders in fewer procurements to drive cost competition for each tender.
I'm inclined to think that's why it is, though I do think DfTO should take on some of that role and let more overarching contracts, certainly for online retail.
DfT Operator did issue the Pre-market engagement for GBR Online Retail:
This preliminary market engagement exercise is being conducted by DfT Operator Limited (DFTO) on the basis described in this notice and in the accompanying documents.

GBR Online Retail will serve as the direct digital sales channel for GBR, supporting the FTR Programme's objectives by delivering a streamlined, accessible, and inclusive ticketing experience. Passengers will benefit from clear fare choices, simplified ticketing across digital and physical formats, and personalized journey information. The platform is designed to integrate railcards, concessions, and support services, ensuring inclusivity from launch.

GBR's ticketing website will combine the existing 14 rail operator websites and apps into one - with the previous websites ceasing to function. The solution will integrate with industry initiatives such as Fares Reform and Delay Repay, accelerate new product development, and support innovative customer propositions.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,100
Location
London
An NR region (or similar) already has sufficient economies of scale. Singer supplier dependency would be an unnecessary risk.
 

Top