What's the plan for Barry? Is it just a stopgap to provide extra stabling space while there are two fleets to handle and therefore to be off-leased later?Once 15x are gone, will Canton have spare maintenance capacity for additional Stadler units?
What's the plan for Barry? Is it just a stopgap to provide extra stabling space while there are two fleets to handle and therefore to be off-leased later?Once 15x are gone, will Canton have spare maintenance capacity for additional Stadler units?
They invested quite a bit iirc so I suspect it'll end up being used long term, potentially replacing some of the stabling that was planned for Rhymney. I guess it might also result in canton having more stabling capacity. One downside to Barry Vs Canton is Barry has no electrified sidings for charging the batteries up.What's the plan for Barry? Is it just a stopgap to provide extra stabling space while there are two fleets to handle and therefore to be off-leased later?
Depends on what you're giving up in return. I'd say that accessibility and longevity (pure DMUs should be phased out before the lifespan of new trains) aren't worth giving up.In this little island of ours with a big population all trying to get around surely it’s better to get more carriages and seats for your buck and therefore buy cheaper trains?
Doors opening at speed, ISTR.The entire 155 fleet had to be completely withdrawn and temporarily replaced by 156s and loco hauled stock on the Cardiff - Portsmouth line (was it brake issues?) for example, and now the 153s are considered bomb proof trains, so there is hope the 197s will get sorted!
Are the 197s leased or purchased ‘outright’? If leased then would be ongoing operating costs rather than one off capital expenditure.Is there any idea what the specific cost of the 197 fleet was? TfW put out £800m as the overall cost of all the new trains
Of course, the FLIRTS also have the bonus that it is feasible to convert all-diesel units into bi-modes at a later date, as TfW are doing with theirs.I remember posting this table that I found online a while ago, but irritatingly I can't actually find the original page I got it from!
![]()
From the base price, it looks like the 197s were about £5.5 million per unit. By comparison, the diesel-only 231s were about £6.9 million per unit.
About £1.5mil cheaper per unit, but on a 231 you get far more train per £ imo. CAF really did earn the "Cheap as ####" nickname with the build quality, with reliability poor enough that you'll often find yourself needing to "Call A Fitter", after the units have "Caused A Farce".
Imo FLIRTs should be the way to go, not CAF's offering. The unreliability of the CAF units will cost far more in the long run that £1.5 million in delay repay, disruption, and increased maintenance costs.
I do wonder if Stadler could be convinced to make a quad-mode unit, capable of working off Diesel, Battery, OLE, and Third Rail. Would make for an interesting test train!Of course, the FLIRTS also have the bonus that it is feasible to convert all-diesel units into bi-modes at a later date, as TfW are doing with theirs.
Hopefully, seeing that TfW is government operated, they'll have an incentive to not anger their potential voter base!With regards to your last sentence - companies will find it cheaper to do a bad job and pay the fines, than it would be to just provide an adequate service. Royal Mail comes to mind as a good example...
A bi/tri/quad mode unit with 3rd rail pickup could be of interest to SWR replacing their 159s, but that's straying further off topic...I do wonder if Stadler could be convinced to make a quad-mode unit, capable of working off Diesel, Battery, OLE, and Third Rail. Would make for an interesting test train!
A bi/tri/quad mode unit with 3rd rail pickup could be of interest to SWR replacing their 159s, but that's straying further off topic...
It would make sense to keep it depending on what happens with any new fleet order.What's the plan for Barry? Is it just a stopgap to provide extra stabling space while there are two fleets to handle and therefore to be off-leased later?
I remember James Price saying to us that they'd pretty much exhausted the penalty clauses they could throw at CAF. This was back when they had been introduced to service late, and we were having endless issues with aircon and toilets.With regards to your last sentence - companies will find it cheaper to do a bad job and pay the fines, than it would be to just provide an adequate service.
Northern are tendering for new stock https://www.northernrailway.co.uk/about-us/newtrainsObviously TfW have spent the money now and have to make the 197 fleet work, that’s quite a big chunk of the £800m! When TfW put the orders in I doubt they would have foreseen these issues and thought they were getting a good train for their money? Am I right in thinking the following operators/GBR areas outside of TfW operate DMU services with 15x units which will require replacement -EMR, SWR, Scotrail, Northern & GWR. Have any of them indicated any form of replacement plan?
For completeness, the thread for Northern new train updates is linked here. Albeit currently locked (at the time of my writing this post) as there haven't been any updates in a while!Northern are tendering for new stock https://www.northernrailway.co.uk/about-us/newtrains
There’s a thread on GWR/SWR/Chiltern potentially ordering replacements https://www.railforums.co.uk/thread...ble-combined-fleet-order-philip-haigh.289507/
Scotrail have also started their procurement process https://www.railforums.co.uk/threads/scotrail-suburban-fleet-emu-and-bemu-market-engagement.289261/
Wales could also electrify.Oh yes, if only for an electrify and cascade.......
The big picture but too big for a mere UK government I am afraid.
It's been a while since Siemens made them for us, and I don't recall any other recent orders elsewhere for them. Does Siemens still make Desiros these days?Thanks! Are the Siemens Desiro units an option? They have supplied electric and diesel units to the UK that would fit the bill, are they considered more sturdy and less problematic than CAF ones?
I don't think Siemens make diesel multiple units anymoreThanks! Are the Siemens Desiro units an option? They have supplied electric and diesel units to the UK that would fit the bill, are they considered more sturdy and less problematic than CAF ones?
Iirc battery chargers are not all that expensive to install, either. Certainly, it's a drop in the bucket compared to OLE installation.Realistically, what we should be ordering now to replace end-of-life DMUs and to enable passenger growth is BEMUs, across all operators, though there should be some cascading of existing DMUs to the more challenging routes.
From comments on the Scottish procurement thread, all the expected players are competing for that, which I think means Hitachi, CAF, Siemens, Alstom, and Stadler. There is also a few potential new players competing, based on the same thread.
For Wales, an electrification "island" around Shrewsbury would probably be enough to switch the Manchester service to BEMUs, and given the position of Shrewsbury in the TfW network, would also be a step towards enabling BEMU operation on many other services.
You are not going to get any Bi/Tri/Quad units going onto the Mersey Rail network if they have a diesel engine. Merseyrail do not want trains containing fuel in their tunnels.TfW might find one with third rail handy for operating the Borderlands onto the Liverpool Loop, though I suspect that's probably more likely to be delivered (if it ever is) by Merseyrail taking it over with battery 777s on their behalf. Adding another operator to Merseyrail's network would be quite a lot of added complexity, particularly given that neither will go into GBR as such.
Have CAF shot themselves in the foot though, with their handling of the TfW fleet supply and the poor after sales service!From comments on the Scottish procurement thread, all the expected players are competing for that, which I think means Hitachi, CAF, Siemens, Alstom, and Stadler. There is also a few potential new players competing, based on the same thread.
Have CAF shot themselves in the foot though, with their handling of the TfW fleet supply and the poor after sales service!

The Verves are very obviously being marketed towards the ScotRail tender but I suspect the requirements are similar in Wales, and the ScotRail tender requiring level boarding should mean a lot of manufacturers developing their plans for level boarding (the Verves would offer level boarding for example.I don't think Siemens make diesel multiple units anymore
There is a UK size version of Desiro, called verve, still on their website, but it only exists on paper, as none have ever been ordered
The Verves are very obviously being marketed towards the ScotRail tender but I suspect the requirements are similar in Wales, and the ScotRail tender requiring level boarding should mean a lot of manufacturers developing their plans for level boarding (the Verves would offer level boarding for example.
Yeah I suspect that's the case, I just meant there's leaflets online advertising them with a livery that's essentially ScotRails but saying Desiro Verve as the text instead.They are also likely I'd have thought to bid it for the Northern procurement, and probably the GWR one if that is progressing.