Oxfordblues
Member
- Joined
- 22 Dec 2013
- Messages
- 1,115
When I worked at the Central Wagon Authority at BRBHQ our remit was to minimise the "fresh air traffic" by optimising the utilisation of common-user wagons through a system of movement instructions and control orders which were intended to eliminate the wasteful cross-haulage of empties.
I noticed that yesterday's 4M61 12:54 Southampton Maritime to Trafford Park Freightliner was half-loaded, with boxes occupying the front half of the train but the rear half completely empty. Southbound intermodal trains heading to Southampton also often include empty wagons. It occurs to me that there is scope to reduce the amount of wasteful cross-haulage of empty wagons, thereby saving expensive fuel and marginally speeding-up the trains after signal checks. Perhaps the manager at Southampton could liaise with their colleague in Manchester and agree how many empties should be detached based on projected loadings for the return working 4O22 at 00:45. Freightliner has a nice orange 08 shunter at Maritime for this very purpose. The surplus empties could be placed in a spare siding ready to be attached if required to the next day's 4M61.
Now I know that the "Liner Train Concept" was for fixed-formation trains with no intermediate remarshalling but this was later diluted by portion-working through the Basford Hall hub. I believe there is scope for similar flexibility in the management of empty wagons.
I noticed that yesterday's 4M61 12:54 Southampton Maritime to Trafford Park Freightliner was half-loaded, with boxes occupying the front half of the train but the rear half completely empty. Southbound intermodal trains heading to Southampton also often include empty wagons. It occurs to me that there is scope to reduce the amount of wasteful cross-haulage of empty wagons, thereby saving expensive fuel and marginally speeding-up the trains after signal checks. Perhaps the manager at Southampton could liaise with their colleague in Manchester and agree how many empties should be detached based on projected loadings for the return working 4O22 at 00:45. Freightliner has a nice orange 08 shunter at Maritime for this very purpose. The surplus empties could be placed in a spare siding ready to be attached if required to the next day's 4M61.
Now I know that the "Liner Train Concept" was for fixed-formation trains with no intermediate remarshalling but this was later diluted by portion-working through the Basford Hall hub. I believe there is scope for similar flexibility in the management of empty wagons.
Last edited: