2024 Tube Stock (Siemens Inspiro London)

eastrail

Member
Joined
25 Mar 2025
Messages
20
Location
London
I thought LCD displays were a thing of the past, didn’t the 1973TS refurb the 1995/96TS and originally the 1992TS use unreliable yellow segment for their exterior LCD destination indicators? They were unreliable and especially on the 1992TS, being replaced by LED displays form the mid to late 1990s. Tube Lines replaced the examples on the 73,95 and 96TS. The Networker trains also had green segment LCD displays, they were replaced again with LED ones akin to the 1992TS, the LCD segment displays deteriorated quickly, I recall it was due to sunlight degrading the segments?

Do the Aventra trains and pretty much everything else have TV style displays? What type of displays are they?

== Doublepost prevention - post automatically merged: ==

With the 2009TS about 15 years older than the 2024TS by the time it finally enters service, the contrast of modernity will be immense. I find the 2009TS quite similar externally to the 2024TS, the shape of the door windows and the front is somewhat reminiscent, of course the 2024TS is much more modern and looks a better train than the 09 Stock. I fear the 09 Stock may have an early replacement as it will seem so old and outdated once 2024TS is rolled out across the entire deep level lines in the next 10 to 20 years. The lack of walkthrough carriages and outdated scrolling DMI indicators and more importantly air conditioning, will make the carriages stand out like a sore thumb compared to the 2024TS or similar varieties.
You are correct in that LCD segment displays are a thing of the past. The thing replacing them were LED dot matrix displays which could display text in a very readable manner and didn't suffer from burn-in unlike its prior counterpart.

Most of the rail industry have now moved onto LCD panels which is the same tech behind TVs and computer monitors. This is what is on the in-carriage screens for Aventras and the 2024TS.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dgl

Established Member
Joined
5 Oct 2014
Messages
3,039
Continuing the chat about display types, Desiro's use another type of display for the external destination displays, the flip-led display. These are a hybrid of the mechanical flip-dot/segment display (like the Family Fortunes display) but with and LED for each element. This makes them readable in bright sunlight without needing extremely bright LED's.
Work really well in my opinion.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Had a look at the maps in the TfL Board papers regarding compulsory purchase for servicing depots for the 36 Bakerloo trains, and sites appears to be :

1) the area currently used by Travis Perkins at Queens Park. Basically the long site between Bakerloo tracks and WCML all way back to ramp off Chamberlayne Road

2) Northwest of Stonebridge Park depot, alongside Wembley Brook, a sort of triangular site alongside WCML towards Wembley Central
 

announcements

Member
Joined
31 Mar 2011
Messages
682
I noticed new cameras at Finsbury Park, presumably to feed the in-cab monitors? They're hanging on new gantries alongside the existing ones, a similar shape/size.
 

Attachments

  • Screenshot_20260713-180859~2.jpg
    Screenshot_20260713-180859~2.jpg
    212.6 KB · Views: 178
Last edited:

Mawkie

Established Member
Joined
17 Feb 2016
Messages
1,242
I noticed new cameras at Finsbury Park, presumably to feed the in-cab monitors? They're hanging on new gantries alongside the existing ones, a similar shape/size.
Correct, a fair few have been incorrectly placed (blocking the old cameras) and have been reported and moved.
When did these start appearing?

View attachment 207617
[photo showing 24 stock stop marker]
Is that Turnpike? These markers and the 24 stopping diamonds on the track have been appearing over the last 12 months - I think I posted about one in Wood Green some time ago. Hopefully the removed roundel in your pic is in the London Transport Museum at Acton....
 

GFE

Member
Joined
6 Jun 2024
Messages
131
Location
HA4
Yes it's amazing the amount of kit that is required for the new trains "system" ( and has to be installed and proven before they can enter passenger service)
 
Last edited:

scammell

Member
Joined
29 Dec 2019
Messages
14
Location
Beverley
Noted in the yard at Gascoine Wood this week was what appeared to be an underground unit. The facility has seen visits by 730 units for mods etc. but this seems to be an new venture. Does anyone have any information on what's going on? TIA.
 

GFE

Member
Joined
6 Jun 2024
Messages
131
Location
HA4
Believe this is being used to store completed 24 tube stock for the Piccadilly line.
 

ST156

Member
Joined
10 May 2014
Messages
154
Can anyone confirm which set moved from Goole to Old Dalby on 25th June?

Headcode for the transfer was 6X26.
 

Alxxxs

Member
Joined
14 Oct 2024
Messages
54
Location
London
TFL app appears to be showing when the Heathrow trains will be passing through the stations (Turnham Green here)
 

Attachments

  • IMG_0774.png
    IMG_0774.png
    344 KB · Views: 191

Mawkie

Established Member
Joined
17 Feb 2016
Messages
1,242
48030 made it to Terminal 5 today. I saw pictures, but they all had faces from the testing crew so won't post. A good milestone though.

Also testing was taking place on the 'local line' between South Ealing and Acton Town. This is a regular testing track for lots of stock and allows for wet testing, with a water spray (which is the white mist in the shots below.)
Screenshot_2026-08-01-23-30-34-13_6012fa4d4ddec268fc5c7112cbb265e7.jpg
Screenshot_2026-08-01-23-32-26-85_6012fa4d4ddec268fc5c7112cbb265e7.jpg
(Pictures show a 24 stock progressing along a track with a mist water spraying onto the tracks)

Apologies, the quality is low as it was a screen shot of a WhatsApp message and I don't know who to credit.
 

73Stock

On Moderation
Joined
18 Aug 2023
Messages
160
Location
London
It was impressive watching the brake testing take place today. Here's a video I captured demonstrating the stopping capability in wet conditions.

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
The American company, Aecom, has been appointed to do a feasibility study into additional stabling and depot capacity for 2024 stock on Bakerloo

American infrastructure firm Aecom has been appointed by Transport for London (TfL) to deliver a feasibility study for the depots and sidings required to facilitate the Bakerloo Line Upgrade (BLU), marking one of the first steps towards the rollout of a new fleet of trains on the London Underground line.
The appointment forms part of the feasibility, planning and optioneering work needed to enable the introduction of new rolling stock on the Bakerloo line, replacing the existing fleet that first entered service in 1972. The trains, which are now more than 50 years old, are the oldest in daily passenger operation in the UK.

The programme is intended to support the introduction of the new fleet while delivering long-term improvements in reliability and passenger experience on the line.

As lead consultant for the early-stage feasibility and planning work, Aecom, supported by Arcadis, will lead multidisciplinary delivery across planning, systems engineering, rail disciplines, environmental services, digital delivery and building information modelling (BIM) integration. The work will culminate in a coordinated baseline design covering Stonebridge Park Depot, the Queen’s Park area and the London Road (Elephant & Castle) sidings.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,779
Location
Somewhere, not in London
The American company, Aecom, has been appointed to do a feasibility study into additional stabling and depot capacity for 2024 stock on Bakerloo


So TfL are paying the Americans to do a feasability study that will tell them what they already knew 10 years ago.

I feel like a slow clap for government efficiency is coming on.
 

GFE

Member
Joined
6 Jun 2024
Messages
131
Location
HA4
You would have liked to think that TFL and previous consultants had got the requirements and dependencies understood ( been a lot of rumours of need for blockades) .
But perhaps not clearly documented and ready for the commercial project structure envisaged ( lessons learnt from PLU).
Let's hope the framework arrangement with Aecom works well and they don't take TFL for a ride
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
So TfL are paying the Americans to do a feasability study that will tell them what they already knew 10 years ago.

I feel like a slow clap for government efficiency is coming on.

In this country we spend more money and time on "feasibility" studies, consultations and all sort of other paperwork than some other countries spend on actual rolling stock production or infrastructure construction.

Roll on "consultation nation".
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,762
Presumably TfL don't have any in-house architects/civil engineering any more so they have to use a consultant? Calling it a feasibility study when it's going to produce an actual design seems a bit inappropriate
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,265
Location
Bath
Presumably TfL don't have any in-house architects/civil engineering any more so they have to use a consultant? Calling it a feasibility study when it's going to produce an actual design seems a bit inappropriate
They do have in house civil engineers but they are obviously specialised in day to day operations etc. It isn’t economical to employ enough people to do a feasibility study this large that only happens once a decade.
 

ATS3

Member
Joined
16 Oct 2022
Messages
170
Location
London
You would have liked to think that TFL and previous consultants had got the requirements and dependencies understood ( been a lot of rumours of need for blockades) .
But perhaps not clearly documented and ready for the commercial project structure envisaged ( lessons learnt from PLU).
Let's hope the framework arrangement with Aecom works well and they don't take TFL for a ride
Aecom is the same company that has been appointed for the Bakerloo Line Extension Stations & Elephant & Castle, and they've been appointed to the DLR's Beckton Depot Upgrade (which has presumably been completed), and I haven't heard anything negative about that so presumably they're not too bad.

== Doublepost prevention - post automatically merged: ==

So TfL are paying the Americans to do a feasability study that will tell them what they already knew 10 years ago.

I feel like a slow clap for government efficiency is coming on.
The title is clickbaity and misleading. In reality they're doing more than just a feasibility study:

"As lead consultant for the early-stage feasibility and planning work, Aecom, supported by Arcadis, will lead multidisciplinary delivery across planning, systems engineering, rail disciplines, environmental services, digital delivery and building information modelling (BIM) integration. The work will culminate in a coordinated baseline design covering Stonebridge Park Depot, the Queen’s Park area and the London Road (Elephant & Castle) sidings."
 