• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

SWR Portsmouth services diverted via Oxshott on 3/4 August

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DelW

Established Member
Joined
15 Jan 2015
Messages
5,947
Given that we are heading for these higher temperatures every summer, would there be a case for temporary 'sunshades' over the most vulnerable parts of the formations at operationally crotical junctions? The anchoring points could be permanent but screens could be attached seasonally.
At Woking, it might be difficult to find room, as there are a lot of tracks through and around the junction. I think the two locations ringed in yellow are the relevant diamonds, up Portsmouth crossing firstly down slow then down fast (if I've managed to follow the tracks correctly!).

Screenshot_20260804-154114_Maps~3.jpg
 

wickham

Member
Joined
3 Feb 2021
Messages
697
Location
Knaphill
At Woking, it might be difficult to find room, as there are a lot of tracks through and around the junction. I think the two locations ringed in yellow are the relevant diamonds, up Portsmouth crossing firstly down slow then down fast (if I've managed to follow the tracks correctly!).

View attachment 208885
That is a good point about "sun shades" - perhaps that is something to be considered, at least they would stop the direct heat onto the rails. In relation to the lack of space, perhaps they would have to be much larger than actually needed, ie: over the whole railway from side to side. There may well be objections to "unsightlyness" or perhaps even local planning problems, but in view of the fact that these current tempratures are going to continue into the future and indeed, even raise, something needs to be done and radical thinking applied !
Snow sheds have been a fact of railway operations almost since the start of railways, so is it now time to consider "sun sheds" ?
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
It's happened on several occasions (and not just this year), although you're right this is the first time it's been picked up on by news outlets as far as I'm aware.
Typically it's only off peak, and generally not every service presumably due to route knowledge constraints

My first recognition of this occurring was on 10 July.

I got to Guildford station and noticed a train I wanted to catch was skipping Woking. I then found all trains but one an hour were skipping Woking at that time of the day.
There was no disruption notice. So I put a post on X to SW_Help staff to ask how bad disruption needs to be in order for there to be a disruption notice.

They never answered this question. I was also interested in the reason for the disruption. That wasn't answered either.

I personally felt the disruption was enough to deserve a disruption notice. A conspiracy theory might be that they were embarrassed as to the reason why and so didn't want to publicise the disruption.

It certainly caught me out that day as I didn't check the service stops to see if any had been removed.

It seems some disruption notices still don't give reasons why.
Description
The Met Office are advising that temperatures are forecast to be above average across England and Wales early this week.
Until 17:00, services running between Portsmouth Harbour and Woking will be diverted via Cobham & Stoke d'Abernon.
Customer advice:
Due to the high temperatures forecast, changes will be made to services on the Portsmouth line between 10:00 and 17:00. These changes will help provide a more reliable and resilient service during the period of hot weather.
The following changes will occur:
Some services from Portsmouth Harbour towards London Waterloo will be diverted via Cobham & Stoke d'Abernon after they reach Guildford.
How do I get to my destination?
You can still travel as planned, but please allow extra time for your journey as your train may be diverted via Cobham & Stoke d'Abernon.
Further minor timetable amendments may be necessary, so please check journey planners before you travel.
If you need any help with your journey, please speak to a member of staff or use a station help point.
Further information:
If you would prefer to use local buses to continue your journey please check Traveline. South Western Railway tickets are not valid on local buses unless stated above.

⚠️NEW - Alterations to South Western Railway services between Portsmouth Harbour and London Waterloo expected until 17:00
#SWweather
The Met Office are advising that temperatures are forecast to be above average across England and Wales early this week.
Until 17:00, services running between Portsmouth Harbour and Woking will be diverted via Cobham & Stoke d'Abernon.
nationalrail.co.uk/service-disrup…

However, a solution may be coming in the future.
⚠️ We will be making a small number of changes to services from Portsmouth Harbour to London Waterloo via Guildford to provide a more reliable and resilient service during the period of hot weather.
Between the hours of 10:00 and 17:00 on Tuesday 4 August some Portsmouth Harbour to London Waterloo via Guildford services will be diverted via Cobham & Stoke D'Abernon after Guildford.
The diversion will not increase journey times. However, customers travelling to Woking should change at Guildford for services to Woking.
This is due to a set of points in the Woking area that at high rail temperatures can impact the normal operation of infrastructure and equipment. We are working towards a full renewal of these points next year.
Journey planners will be updated on the day at 02:00.

Given they are working towards a full renewal of the points, it baffles me why they wouldn't want to make this more widely known. It is a positive thing.

Not saying anything, like they were doing on 10 July and maybe other days around then and with many of the disruption notices now just saying resilience, doesn't help their cause.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,016
Location
St Albans
That is a good point about "sun shades" - perhaps that is something to be considered, at least they would stop the direct heat onto the rails. In relation to the lack of space, perhaps they would have to be much larger than actually needed, ie: over the whole railway from side to side. There may well be objections to "unsightlyness" or perhaps even local planning problems, but in view of the fact that these current tempratures are going to continue into the future and indeed, even raise, something needs to be done and radical thinking applied !
Snow sheds have been a fact of railway operations almost since the start of railways, so is it now time to consider "sun sheds" ?
With OLE equipped track, the structures would need to be about 6m high.
The problem with 3rd rail areas, and particularly SWML throats and junctions, is that there often aren't any 'ten foots' meaning that as you say, several tracks would need to be covered, - look at the old signal box gantries near Clapham Junction.
 

Oxalin

Member
Joined
27 Aug 2021
Messages
23
Location
Hampshire
At Woking, it might be difficult to find room, as there are a lot of tracks through and around the junction. I think the two locations ringed in yellow are the relevant diamonds, up Portsmouth crossing firstly down slow then down fast (if I've managed to follow the tracks correctly!).

View attachment 208885
My understanding is that it's the rightmost one of those crossovers - it's a switch diamond so has moving blades, whereas the other is I believe just a standard crossover with no moving parts.
I don't know however why this one is so vulnerable, given others in the area (including one at Addlestone Jn nearby) don't seem to be nearly as affected. (Although tbf that one only moves a couple of times a day, rather than 3-4 times an hour)
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,458
Location
Gomshall, Surrey
I happened to be passing Clandon today and stopped off for a quick look, based on what Traksy was saying about diversions. A couple of up diversions, but the wonderful irony was that...it rained! Only briefly, but enough to make the heat-related diversions seem slightly humorous (it was much less hot today than yesterday anyway)!

== Doublepost prevention - post automatically merged: ==

My understanding is that it's the rightmost one of those crossovers - it's a switch diamond so has moving blades, whereas the other is I believe just a standard crossover with no moving parts.
I don't know however why this one is so vulnerable, given others in the area (including one at Addlestone Jn nearby) don't seem to be nearly as affected. (Although tbf that one only moves a couple of times a day, rather than 3-4 times an hour)
Not trying to be pedantic, but a crossover is two points/turnouts, allowing trains to cross from one line to another, whereas this is a crossing, where two tracks intersect without, as you say, any point blades, etc.
 

Attachments

  • DSC03891 (1).jpeg
    DSC03891 (1).jpeg
    3.2 MB · Views: 47

DelW

Established Member
Joined
15 Jan 2015
Messages
5,947
My understanding is that it's the rightmost one of those crossovers - it's a switch diamond so has moving blades, whereas the other is I believe just a standard crossover with no moving parts.
I don't know however why this one is so vulnerable, given others in the area (including one at Addlestone Jn nearby) don't seem to be nearly as affected. (Although tbf that one only moves a couple of times a day, rather than 3-4 times an hour)
Yes, it would make sense for just the fast line to be a switch diamond, pretty much all trains on the up Pompey and the down main slow will be calling at Woking so taking the crossing at low speed.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,016
Location
St Albans
Apart from the general service smoothing potential, that's a lot to pay to replace one temperamental crossing, especially when the alternative routeing seem to be acceptable even with DR!
I assume that you are basing you assertion that the current heatwaves are exceptional, - or at least future summer extremes will be no worse. That would be a way of kicking the problem into the yellow grass.
 

slicedbread

Member
Joined
11 Oct 2012
Messages
52
I was not being entirely serious about a flyover being the solution.
It must be 100 years since the idea of grade separation at that junction was first mooted so I doubt it will be anytime soon.

I am sure there will be cheaper solutions if hot weather is the only problem.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,947
I was not being entirely serious about a flyover being the solution.
It must be 100 years since the idea of grade separation at that junction was first mooted so I doubt it will be anytime soon.

I am sure there will be cheaper solutions if hot weather is the only problem.
Made massively less likely by BR's decision to sell off the land west of the up Pompey line which the Southern had bought to accommodate the flyover line. That's now covered in housing, making it difficult to make space for the flyover while keeping existing services running.
 

sharpener

Member
Joined
4 Oct 2018
Messages
371
Made massively less likely by BR's decision to sell off the land west of the up Pompey line which the Southern had bought to accommodate the flyover line. That's now covered in housing, making it difficult to make space for the flyover while keeping existing services running.

and unlike at Hitchin no expanse of agricultural land to put a great big loop in.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,458
Location
Gomshall, Surrey
I assume that you are basing you assertion that the current heatwaves are exceptional, - or at least future summer extremes will be no worse. That would be a way of kicking the problem into the yellow grass.
No, sadly, I think we are entering a Mediterranean climate regime. It's worth bearing mind, though, that the sun's actual strength (i.e. solar energy output) on a cloudless day won't increase, even if more cloudless summers make the air temperature a few degrees higher than now. Rail temperatures now can reach about 70-75C in mid-summer direct sun, I think (happy to be corrected) and those heights won't increase much if air temperatures are, say, 40C rather than 37C.

The sensible solution in this particular case would obviously be to install a crossing that is fit for purpose, but the grade-separation idea at Woking is not new, of course. I do wonder if a significant increase in infrastructure reliabilty (and therefore service reliability) could be achieved there which would obviate the need for major construction - i.e. putting it crudely, spending above the going rate for track and signalling at the junction that has very high reliability. If moveable crossings are hard to make reliable then surely a revised junction layout using only points must be considered.
 
Last edited:

rmHawk765

Member
Joined
8 Apr 2025
Messages
710
Location
ECML South
A conspiracy theory might be that they were embarrassed as to the reason why and so didn't want to publicise the disruption.
Would not be surprising but this is a factor GBR needs to remove from consideration. There should be no such thing as being embarrassed about using a Key Route Strategy which has not just been pulled out of thin air. At the same time I cannot blame passengers for being annoyed at constant heat-related issues when the communication is so poor most of the time. It's absurd how the fundamental principle of communication between all involved parties seems to not exist on the railway nowadays.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,458
Location
Gomshall, Surrey
Would not be surprising but this is a factor GBR needs to remove from consideration. There should be no such thing as being embarrassed about using a Key Route Strategy which has not just been pulled out of thin air. At the same time I cannot blame passengers for being annoyed at constant heat-related issues when the communication is so poor most of the time. It's absurd how the fundamental principle of communication between all involved parties seems to not exist on the railway nowadays.
Agreed, but of course any possible embarrasment would lie at NR's door, rather than the TOC's. GBR, being only an amalgam of TOCs (even when it has any influence), won't have a significantly different interface with the already publicly-owned NR. There will still not be anything like a joined-up railway.

== Doublepost prevention - post automatically merged: ==

Noted that at the moment the Guildford 'new' line is blocked because the Oxshott level crossing is blocked by a road vehicle. I don't know what has happened but the timing is slightly fortunate in that no diversions are planned today!
 

nctd2306

Member
Joined
2 Jan 2024
Messages
362
Location
Berkshire
Noted that at the moment the Guildford 'new' line is blocked because the Oxshott level crossing is blocked by a road vehicle. I don't know what has happened but the timing is slightly fortunate in that no diversions are planned today!
Except that it's highly unfortunate given a large fire has shut the mainline at West Byfleet and the issues on the Cobham line means it's unavailable for diversions!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,232
Made massively less likely by BR's decision to sell off the land west of the up Pompey line which the Southern had bought to accommodate the flyover line. That's now covered in housing, making it difficult to make space for the flyover while keeping existing services running.
But on the other hand, a fairly recent NR Route Strategy or Study did include a proposed track layout for a flyover, so perhaps it’s not so impossible for space reasons. Isn’t there about 500m of sidings on the down side?
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,947
But on the other hand, a fairly recent NR Route Strategy or Study did include a proposed track layout for a flyover, so perhaps it’s not so impossible for space reasons. Isn’t there about 500m of sidings on the down side?
Yes, the reception line and/or headshunt for the aggregates yard extends about 30 chains (from Quail) south of the junction, alongside the down Pompey. There might be scope to reconfigure the down yard and aggregates yard to make enough extra space, but not as easily as if the land alongside the up line had still been railway owned.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,232
Yes, the reception line and/or headshunt for the aggregates yard extends about 30 chains (from Quail) south of the junction, alongside the down Pompey. There might be scope to reconfigure the down yard and aggregates yard to make enough extra space, but not as easily as if the land alongside the up line had still been railway owned.
Up on the transpennine upgrade they’ve been changing the embankment slopes in some of the cuttings for four tracking, using soil nails and sprayed concrete, so I’d assume they could widen the formation by at least another track on the up side.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,947
Up on the transpennine upgrade they’ve been changing the embankment slopes in some of the cuttings for four tracking, using soil nails and sprayed concrete, so I’d assume they could widen the formation by at least another track on the up side.
From memory, the line's level is not far off the surrounding ground level. A 25" OS map (but pre-dating the new housing) suggests it's in a slight cutting (hard to quantify) on the approach from the south. So there may be scope to gain some width with steeper earthworks or a cantilever sheet pile wall, but my assumption is that a flyover would be a trestle structure similar to the up slow flyover at Wimbledon. I don't expect ever to see it built though, so I'll probably never know if I'm right ... :frown:
 

slicedbread

Member
Joined
11 Oct 2012
Messages
52
Unsurprisingly the diversion is back for 13/14 Aug.

But a bit more news from SWR on the plan your journey website about planned renewal of the points.

This is due to a set of points in the Woking area that at high rail temperatures can impact the normal operation of infrastructure and equipment. We are working towards a full renewal of these points next year.
Edit: Actually I think they did mention the renewal in the previous messages at the start of the month.
 
Last edited:

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
Unsurprisingly the diversion is back for 13/14 Aug.

But a bit more news from SWR on the plan your journey website about planned renewal of the points.


Edit: Actually I think they did mention the renewal in the previous messages at the start of the month.
It may be there but earlier this week I posted, formerly known as tweeted, on X, formerly known as Twitter, National Rail Enquiries and SWR to say the main heat related disruption notice said there was no weather related disruption on South Western Railway and I asked if it could be corrected as I was aware of two issues.

I didn't check if it was corrected, and this is the reply I got:
Hi Tim, this information is available on the South Western Website which can be found here

They linked to a South Western Railway page.

It might be avilable there but elsewhere they were saying no issues, so why would someone then think I must check elsewhere, unless they don't trust NRE. They would be right not to.
 

Top