Yes, I meant not every working between 1200 and 1700.I think the fact tghey are offpeak services is niot relevant. More significant is that 1000 to 1700 is the hottest part of the day.
Yes, I meant not every working between 1200 and 1700.I think the fact tghey are offpeak services is niot relevant. More significant is that 1000 to 1700 is the hottest part of the day.
At Woking, it might be difficult to find room, as there are a lot of tracks through and around the junction. I think the two locations ringed in yellow are the relevant diamonds, up Portsmouth crossing firstly down slow then down fast (if I've managed to follow the tracks correctly!).Given that we are heading for these higher temperatures every summer, would there be a case for temporary 'sunshades' over the most vulnerable parts of the formations at operationally crotical junctions? The anchoring points could be permanent but screens could be attached seasonally.

That is a good point about "sun shades" - perhaps that is something to be considered, at least they would stop the direct heat onto the rails. In relation to the lack of space, perhaps they would have to be much larger than actually needed, ie: over the whole railway from side to side. There may well be objections to "unsightlyness" or perhaps even local planning problems, but in view of the fact that these current tempratures are going to continue into the future and indeed, even raise, something needs to be done and radical thinking applied !At Woking, it might be difficult to find room, as there are a lot of tracks through and around the junction. I think the two locations ringed in yellow are the relevant diamonds, up Portsmouth crossing firstly down slow then down fast (if I've managed to follow the tracks correctly!).
View attachment 208885
It's happened on several occasions (and not just this year), although you're right this is the first time it's been picked up on by news outlets as far as I'm aware.
Typically it's only off peak, and generally not every service presumably due to route knowledge constraints
Description
The Met Office are advising that temperatures are forecast to be above average across England and Wales early this week.
Until 17:00, services running between Portsmouth Harbour and Woking will be diverted via Cobham & Stoke d'Abernon.
Customer advice:
Due to the high temperatures forecast, changes will be made to services on the Portsmouth line between 10:00 and 17:00. These changes will help provide a more reliable and resilient service during the period of hot weather.
The following changes will occur:
Some services from Portsmouth Harbour towards London Waterloo will be diverted via Cobham & Stoke d'Abernon after they reach Guildford.
How do I get to my destination?
You can still travel as planned, but please allow extra time for your journey as your train may be diverted via Cobham & Stoke d'Abernon.
Further minor timetable amendments may be necessary, so please check journey planners before you travel.
If you need any help with your journey, please speak to a member of staff or use a station help point.
Further information:
If you would prefer to use local buses to continue your journey please check Traveline. South Western Railway tickets are not valid on local buses unless stated above.
⚠️NEW - Alterations to South Western Railway services between Portsmouth Harbour and London Waterloo expected until 17:00
#SWweather
The Met Office are advising that temperatures are forecast to be above average across England and Wales early this week.
Until 17:00, services running between Portsmouth Harbour and Woking will be diverted via Cobham & Stoke d'Abernon.
nationalrail.co.uk/service-disrup…
⚠️ We will be making a small number of changes to services from Portsmouth Harbour to London Waterloo via Guildford to provide a more reliable and resilient service during the period of hot weather.
Between the hours of 10:00 and 17:00 on Tuesday 4 August some Portsmouth Harbour to London Waterloo via Guildford services will be diverted via Cobham & Stoke D'Abernon after Guildford.
The diversion will not increase journey times. However, customers travelling to Woking should change at Guildford for services to Woking.
This is due to a set of points in the Woking area that at high rail temperatures can impact the normal operation of infrastructure and equipment. We are working towards a full renewal of these points next year.
Journey planners will be updated on the day at 02:00.
With OLE equipped track, the structures would need to be about 6m high.That is a good point about "sun shades" - perhaps that is something to be considered, at least they would stop the direct heat onto the rails. In relation to the lack of space, perhaps they would have to be much larger than actually needed, ie: over the whole railway from side to side. There may well be objections to "unsightlyness" or perhaps even local planning problems, but in view of the fact that these current tempratures are going to continue into the future and indeed, even raise, something needs to be done and radical thinking applied !
Snow sheds have been a fact of railway operations almost since the start of railways, so is it now time to consider "sun sheds" ?
My understanding is that it's the rightmost one of those crossovers - it's a switch diamond so has moving blades, whereas the other is I believe just a standard crossover with no moving parts.At Woking, it might be difficult to find room, as there are a lot of tracks through and around the junction. I think the two locations ringed in yellow are the relevant diamonds, up Portsmouth crossing firstly down slow then down fast (if I've managed to follow the tracks correctly!).
View attachment 208885
Not trying to be pedantic, but a crossover is two points/turnouts, allowing trains to cross from one line to another, whereas this is a crossing, where two tracks intersect without, as you say, any point blades, etc.My understanding is that it's the rightmost one of those crossovers - it's a switch diamond so has moving blades, whereas the other is I believe just a standard crossover with no moving parts.
I don't know however why this one is so vulnerable, given others in the area (including one at Addlestone Jn nearby) don't seem to be nearly as affected. (Although tbf that one only moves a couple of times a day, rather than 3-4 times an hour)
Yes, it would make sense for just the fast line to be a switch diamond, pretty much all trains on the up Pompey and the down main slow will be calling at Woking so taking the crossing at low speed.My understanding is that it's the rightmost one of those crossovers - it's a switch diamond so has moving blades, whereas the other is I believe just a standard crossover with no moving parts.
I don't know however why this one is so vulnerable, given others in the area (including one at Addlestone Jn nearby) don't seem to be nearly as affected. (Although tbf that one only moves a couple of times a day, rather than 3-4 times an hour)
Apart from the general service smoothing potential, that's a lot to pay to replace one temperamental crossing, especially when the alternative routeing seem to be acceptable even with DR!Perhaps they will dust off the plans for a flyover again?
![]()
I assume that you are basing you assertion that the current heatwaves are exceptional, - or at least future summer extremes will be no worse. That would be a way of kicking the problem into the yellow grass.Apart from the general service smoothing potential, that's a lot to pay to replace one temperamental crossing, especially when the alternative routeing seem to be acceptable even with DR!
Made massively less likely by BR's decision to sell off the land west of the up Pompey line which the Southern had bought to accommodate the flyover line. That's now covered in housing, making it difficult to make space for the flyover while keeping existing services running.I was not being entirely serious about a flyover being the solution.
It must be 100 years since the idea of grade separation at that junction was first mooted so I doubt it will be anytime soon.
I am sure there will be cheaper solutions if hot weather is the only problem.
Made massively less likely by BR's decision to sell off the land west of the up Pompey line which the Southern had bought to accommodate the flyover line. That's now covered in housing, making it difficult to make space for the flyover while keeping existing services running.
No, sadly, I think we are entering a Mediterranean climate regime. It's worth bearing mind, though, that the sun's actual strength (i.e. solar energy output) on a cloudless day won't increase, even if more cloudless summers make the air temperature a few degrees higher than now. Rail temperatures now can reach about 70-75C in mid-summer direct sun, I think (happy to be corrected) and those heights won't increase much if air temperatures are, say, 40C rather than 37C.I assume that you are basing you assertion that the current heatwaves are exceptional, - or at least future summer extremes will be no worse. That would be a way of kicking the problem into the yellow grass.
Would not be surprising but this is a factor GBR needs to remove from consideration. There should be no such thing as being embarrassed about using a Key Route Strategy which has not just been pulled out of thin air. At the same time I cannot blame passengers for being annoyed at constant heat-related issues when the communication is so poor most of the time. It's absurd how the fundamental principle of communication between all involved parties seems to not exist on the railway nowadays.A conspiracy theory might be that they were embarrassed as to the reason why and so didn't want to publicise the disruption.
Agreed, but of course any possible embarrasment would lie at NR's door, rather than the TOC's. GBR, being only an amalgam of TOCs (even when it has any influence), won't have a significantly different interface with the already publicly-owned NR. There will still not be anything like a joined-up railway.Would not be surprising but this is a factor GBR needs to remove from consideration. There should be no such thing as being embarrassed about using a Key Route Strategy which has not just been pulled out of thin air. At the same time I cannot blame passengers for being annoyed at constant heat-related issues when the communication is so poor most of the time. It's absurd how the fundamental principle of communication between all involved parties seems to not exist on the railway nowadays.
Except that it's highly unfortunate given a large fire has shut the mainline at West Byfleet and the issues on the Cobham line means it's unavailable for diversions!Noted that at the moment the Guildford 'new' line is blocked because the Oxshott level crossing is blocked by a road vehicle. I don't know what has happened but the timing is slightly fortunate in that no diversions are planned today!
But on the other hand, a fairly recent NR Route Strategy or Study did include a proposed track layout for a flyover, so perhaps it’s not so impossible for space reasons. Isn’t there about 500m of sidings on the down side?Made massively less likely by BR's decision to sell off the land west of the up Pompey line which the Southern had bought to accommodate the flyover line. That's now covered in housing, making it difficult to make space for the flyover while keeping existing services running.
Yes, the reception line and/or headshunt for the aggregates yard extends about 30 chains (from Quail) south of the junction, alongside the down Pompey. There might be scope to reconfigure the down yard and aggregates yard to make enough extra space, but not as easily as if the land alongside the up line had still been railway owned.But on the other hand, a fairly recent NR Route Strategy or Study did include a proposed track layout for a flyover, so perhaps it’s not so impossible for space reasons. Isn’t there about 500m of sidings on the down side?
Up on the transpennine upgrade they’ve been changing the embankment slopes in some of the cuttings for four tracking, using soil nails and sprayed concrete, so I’d assume they could widen the formation by at least another track on the up side.Yes, the reception line and/or headshunt for the aggregates yard extends about 30 chains (from Quail) south of the junction, alongside the down Pompey. There might be scope to reconfigure the down yard and aggregates yard to make enough extra space, but not as easily as if the land alongside the up line had still been railway owned.
From memory, the line's level is not far off the surrounding ground level. A 25" OS map (but pre-dating the new housing) suggests it's in a slight cutting (hard to quantify) on the approach from the south. So there may be scope to gain some width with steeper earthworks or a cantilever sheet pile wall, but my assumption is that a flyover would be a trestle structure similar to the up slow flyover at Wimbledon. I don't expect ever to see it built though, so I'll probably never know if I'm right ...Up on the transpennine upgrade they’ve been changing the embankment slopes in some of the cuttings for four tracking, using soil nails and sprayed concrete, so I’d assume they could widen the formation by at least another track on the up side.
Edit: Actually I think they did mention the renewal in the previous messages at the start of the month.This is due to a set of points in the Woking area that at high rail temperatures can impact the normal operation of infrastructure and equipment. We are working towards a full renewal of these points next year.
It may be there but earlier this week I posted, formerly known as tweeted, on X, formerly known as Twitter, National Rail Enquiries and SWR to say the main heat related disruption notice said there was no weather related disruption on South Western Railway and I asked if it could be corrected as I was aware of two issues.Unsurprisingly the diversion is back for 13/14 Aug.
But a bit more news from SWR on the plan your journey website about planned renewal of the points.
Edit: Actually I think they did mention the renewal in the previous messages at the start of the month.
Hi Tim, this information is available on the South Western Website which can be found here