I travelled from Glasgow to Stranraer and back last Saturday and couldn't help noticing the posters advertising the three week closure of the Girvan-Stranraer section for engineering works from next Saturday 8th August. Replacement buses will be in operation during this period for (long-overdue) track replacement and viaduct & tunnel repairs.
I don't have any inside information - so this is purely speculative - but on arrival at Stranraer, there was ample evidence that a major rationalisation will be taking place at the terminus. There were large stacks of new concrete sleepers and a large pile of new ballast in the former lorry park at the landward end of the pier....and the numerous painted markings on the track and paintwork at the station throat would seem to indicate that the signalbox and signalling - which have been rarely switched-in since the ferries moved to Cairnryan in 2011 - are to be abolished and removed, with just a single line running into and out of platform 1.
This would be very logical as it would pave the way for the construction of a new single platform station at the landward end of the pier....which would enable shortening of the line and removal of the rapidly-deteriorating pier in the not-to-distant future.
A local staff member also told me that they thought that the remote Glenwhilly signalbox and passing loop were also to be abolished. This would be ironic, as the box has recently had its unique semaphore up distant signal replaced by a brand new colour light.
Does anyone have any definite information?
I don't have any inside information - so this is purely speculative - but on arrival at Stranraer, there was ample evidence that a major rationalisation will be taking place at the terminus. There were large stacks of new concrete sleepers and a large pile of new ballast in the former lorry park at the landward end of the pier....and the numerous painted markings on the track and paintwork at the station throat would seem to indicate that the signalbox and signalling - which have been rarely switched-in since the ferries moved to Cairnryan in 2011 - are to be abolished and removed, with just a single line running into and out of platform 1.
This would be very logical as it would pave the way for the construction of a new single platform station at the landward end of the pier....which would enable shortening of the line and removal of the rapidly-deteriorating pier in the not-to-distant future.
A local staff member also told me that they thought that the remote Glenwhilly signalbox and passing loop were also to be abolished. This would be ironic, as the box has recently had its unique semaphore up distant signal replaced by a brand new colour light.
Does anyone have any definite information?