Stopgap options to cover for delays to introduction of Class 810 for EMR?

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,386
Location
Taunton or Kent
Former Transport Secretary

== Doublepost prevention - post automatically merged: ==


In theory there are 6 stored 221s but haven't Cross Country applied to take at least some of them? When the DfT can get round to considering it, of course.
The latest RAIL magazine has just dropped and it has an item that says the 6x off lease 221s are set to go to EMR on a short-term basis ('a few months'), then will head over to XC.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
The latest RAIL magazine has just dropped and it has an item that says the 6x off lease 221s are set to go to EMR on a short-term basis ('a few months'), then will head over to XC.
I wonder where they got their information from? Though that would put the jigsaw pieces together, with the new managing director stating that a ‘plan’ will be revealed in the next few weeks..
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,713
Location
West of Andover
The latest RAIL magazine has just dropped and it has an item that says the 6x off lease 221s are set to go to EMR on a short-term basis ('a few months'), then will head over to XC.
It will probably take a few months to get staff trained on the various differences between a 221 & 222.

I presume a 221 voyager has already been cleared to work Leicester to St Pancras, unless they are planning to keep them north of Leicester.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,268
Location
East Midlands
The latest RAIL magazine has just dropped and it has an item that says the 6x off lease 221s are set to go to EMR on a short-term basis ('a few months'), then will head over to XC.
I'm really surprised at this, you'd think that the training involved would be disruptive and take long enough that this would not help the situation. Surely them going to EMR for "a few months" would be barely enough to get them into passenger service there at all? Or are they so very similar that converting drivers and onboard staff from 222s to 221s is pretty trivial?

At least they don't have to worry about the reservation systems being incompatible!
 

2001olib

Member
Joined
5 Jun 2025
Messages
54
Location
East mids
IF the 221 were to be going to EMR on short term basis there must be plenty of drivers spare in order the speed up the training process.
 

Clansman

Established Member
Joined
4 Jan 2016
Messages
2,648
Location
Scotland and Hong Kong
Much smarter for Scotrail to keep their HST’s in service longer, to allow 222’s to stay until 810’s can enter service reliably.
In what way would it be smarter for ScotRail to do this? It would be only to their disadvantage to ever agree to that.
 

Speed43125

Member
Joined
20 Jul 2019
Messages
1,172
Location
Dunblane
The latest RAIL magazine has just dropped and it has an item that says the 6x off lease 221s are set to go to EMR on a short-term basis ('a few months'), then will head over to XC.
Do we know if these will be maintained at Central Rivers?

If so that's at least 4 or 5 extra diagrams you could reasonably expect to have covered everyday, once they've got them all brought up to spec. - Does anyone know if the off-lease 221s are in warm or cold storage?
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
I presume a 221 voyager has already been cleared to work Leicester to St Pancras, unless they are planning to keep them north of Leicester.
Route wise, they're definitely cleared Wigston-Leicester-Derby & Nottingham.

I'm not sure if a train physically needs to be sent down a route for it to be deemed safe/route cleared nowadays, as I believe route clearance can be done digitally via various set profiles.

Although I wouldn't be surprised to see a series of test runs up and down the MML, prior to them entering public service, as you'll still need staff physically training on them.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,387
Location
Lichfield
The latest RAIL magazine has just dropped and it has an item that says the 6x off lease 221s are set to go to EMR on a short-term basis ('a few months'), then will head over to XC.

Good news especially about them then heading to XC.

One big concern is what sort of damage are EMR and Hitachi going to do to the 221s while they have them?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,157
One big concern is what sort of damage are EMR and Hitachi going to do to the 221s while they have them?
Is it known that any Class 221s will be based at Etches Park, rather than Central Rivers?
 
Joined
8 Apr 2018
Messages
41
Location
Loughborough
That's great news if true. I wonder what they would do about Long Eaton, as it can only take 4 cars and from reading another thread I don't believe the Class 221s have SDO? Keep them on the Sheffield Fasts and the Nottinghams perhaps - is there much interworking needed?

Edit: Actually further reading I think there is a method of working for short platforms now. Ignore me.
 
Last edited:

Russel

Established Member
Joined
30 Jun 2022
Messages
5,387
Location
Lichfield
Is it known that any Class 221s will be based at Etches Park, rather than Central Rivers?

No idea, let's just hope for everyone's sake that it's Central Rivers.

If it's Etches Park, the Rosco need to make sure the maintenance part of the contract is watertight.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
No idea, let's just hope for everyone's sake that it's Central Rivers.

If it's Etches Park, the Rosco need to make sure the maintenance part of the contract is watertight.
Would Etches Park even have room for additional units?

Also, if they can't even keep up with maintenance of the 222/810s I can hardly see them basing the 221s there, especially as it will technically be a new fleet for the Hitachi staff to have to learn.

They need to be left alone to focus on there current fleets and let Central Rivers focus on the 221s.
 

Llandudno

Established Member
Joined
25 Dec 2014
Messages
2,740
Location
Matlock
While his posts do feel a bit like engagement farming at times, the fact Roger Ford engages with him surely suggests he must have some decent sources?

== Doublepost prevention - post automatically merged: ==


I've not checked how practical these are for other stations, but for Chesterfield they are a farce.

The only option is via Tamworth, which is once every two hours at best via XC - hardly going to be easy to get a seat on that - then LNWR from there to Euston. Only half an hour longer if everything is on time, but the majority is on what is essentially a commuter service.

No idea why we couldn't have had Doncaster as an option, as Sheffield has.
Perhaps buy a return from Sheffield to London and travel via Doncaster and buy a separate ticket Chesterfield - Sheffield or X17 bus to Sheffield?

Agree the Tamworth option is far from ideal…!
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,387
Location
Lichfield
Would Etches Park even have room for additional units?

Also, if they can't even keep up with maintenance of the 222/810s I can hardly see them basing the 221s there, especially as it will technically be a new fleet for the Hitachi staff to have to learn.

They need to be left alone to focus on there current fleets and let Central Rivers focus on the 221s.

I agree and hopefully this is how thing pan out, but we've seen plenty of questionable decisions over the years across the rail industry...
 

tsyxa

Member
Joined
12 Jul 2022
Messages
56
Location
Leicester
Hi all,

I’ve seen from numerous sources now that EMR are going to loan the 221s that are currently in storage to cover for the 222s that are out of service (either due to moving up north or just having failed). I haven’t however seen anyone mention it here yet- could anyone confirm whether this is actually happening or if it’s just wishful thinking? Thanks
 

transportphoto

Established Member
Associate Staff
Jobs & Careers
Quizmaster
Joined
21 Jan 2010
Messages
5,554
What are your sources? Are you able to cite them? This may help the forum as a collective speculate on their reliability.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,610
Location
Hampshire
I wonder if it’s part of a deal being drawn up by Alstom? Eg, they come back in to help fix the 222s (again), whilst also allowing the use of the “reserved” 6 that were due to go to their W&S operation keeping them turned over nicely.

After all, they are proving some technical support to Hitachi whilst Hitachi remain key maintenance providers. One of those deals that rather helps everyone.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,428
Location
London
Whilst it sounds like a good idea on paper, nobody at EMR will have 221s on their traction card.

Chances are they're similar enough to 222s that a relatively short course would be required but, as with the 810s, they'd need a sizeable number of staff trained before they could make use of them.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,798
Location
East Anglia
Whilst it sounds like a good idea on paper, nobody at EMR will have 221s on their traction card.

Chances are they're similar enough to 222s that a relatively short course would be required but, as with the 810s, they'd need a sizeable number of staff trained before they could make use of them.
Its going to require more training as you say but I suppose the reduced service is a saving grace.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,806
If it happened I could see a situation like what happened on TPE in their early recovery period where cancellations increased while crews were trained on different traction, which was ultimately wasted when one type was withdrawn, a decision taken out of TPE's hands when things had actually improved. In EMR's case they'd know all along it was only a short term measure. Short term pain, but no real long term gain.
 

bunnahabhain

Established Member
Joined
8 Jun 2005
Messages
2,271
What are your sources? Are you able to cite them? This may help the forum as a collective speculate on their reliability.
I don't think anybody is able to cite a source at present. There's something coming, it isn't confirmed what it is yet, but it can't really be anything other than 221s or 180s.
 

tsyxa

Member
Joined
12 Jul 2022
Messages
56
Location
Leicester
What are your sources? Are you able to cite them? This may help the forum as a collective speculate on their reliability.
Good idea, let me have a look and see where i got it from. I believe it was two different accounts on X, so not exactly the pinnacle of truth, hence I came here :lol:

== Doublepost prevention - post automatically merged: ==

Apparently it’s being reported in the RAIL magazine:

‪https://x.com/harleystravels/status/2083627872002941166?s=46&t=qeyIOkv7b8GAcfL7u9XBaw‬

Supposedly Rail Magazine have reported that EMR will be taking on Ex Avanti 221101-106 as stopgaps to help supplement the 222s, before moving to CrossCountry after. How true this is, i have no idea. But if GC can run a very small fleet of 221s, so can EMR.

‪https://x.com/RichFromRail/status/2083641653818986698?s=20‬

It's in the latest magazine which some subscribers will get now.

The story has been sourced and double sourced and we stand by it.
 
Last edited:

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,465
This problem isn't getting any better is it?
Get the new Transport Minister to request 2/3 or 4 Azuma 5 cars from LNER and get a couple of 225 sets to replace them on the ECML.
OK I do know it is not that simple but it is not totally unreasonable.

Where do you find the additional cl225 sets from?
 

apinnard

Member
Joined
2 Aug 2017
Messages
382
Location
Kettering
This problem isn't getting any better is it?
Get the new Transport Minister to request 2/3 or 4 Azuma 5 cars from LNER and get a couple of 225 sets to replace them on the ECML.
OK I do know it is not that simple but it is not totally unreasonable.
It’s very unreasonable. The east coast timetable as it is now requires the performance of the Azumas and small handful of remaining (now shortened) 225 sets to work. Stick any more full length 225 sets in and you’ll decimate the ecml timetable performance. Robbing Peter to pay Paul is really not advisable.

Then there is the problem of extra 225 sets. Where will they come from? The majority of the unused ones were scrapped or are so far beyond economical repair that it’s a non-starter.

Finally, you have the issues of clearance of Azumas on the MML. Are they cleared for the full route(s)? Do the EMR staff sign them? Will they need a program of training for drivers, guards and first class hosts? Will the unions accept?

Really, it’s not as simple as just moving a few members of a different fleet across to cover.
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,600
Location
South Staffordshire
Well, better late than never for the stored Class 221s to be put into use.
Well all I can say is good luck. The ex AWC 221s that have been returned to use by XC are not the most reliable in the fleet, and they stood for a shorter time than these six.

Gonna be interesting
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
2,347
Location
Leicester
I don’t think anything has yet officially been confirmed. However, the 221s are pretty much the only suitable option to cover the timetable, with the ongoing rolling stock issues.

All of the 222s are supposed to be gone from EMR by the end of the year. With the 810s, who knows how long it’ll take to fix them, as well as how complex all of their issues are.

We don’t know how long the revised timetable will last for, either.

A lot of questions but not a lot of answers. Though I’m sure as time goes on, things will become clearer.
 

Top