tumbles
Member
It was literally to save money as and where they could. The good thing is Pill is using the existing platform so that could easily be extended. Portishead in due course could be if required - i think a half hour service over longer platform would be the preferred one for me. They are at least redoing the signalling with that in mind - they would just require implementing a passing loop. The logical one would actually be the one past ham green half where the track bed is still wide enough.I tend to think should have made the station platforms nearer 170m long, so that they could run 8car EMUs (if ever electrified) or BEMUs, or pairs of 3car DMUs on busy event days. Especially as the Arena and Football ground (and Cricket ground, and balloon festival) are all likely to have busy days.
The idea that 120m platforms with short trains and an hourly service will cope seems misguided, if add in surrounding towns, Bristol area is nearer half million people. So building a system with capacity of just 280 seats an hour sounds tiny.
It appears the plans for all the Burns stations in South Wales have 170m platforms to cope with rush hour and event days, and some of those trains will continue to Bristol area.
It sort of feels opted for bare minimum, with no serious provision to encourage those travelling to Bristol for events to use public transport
Ran along the route today (well up to pill from Portishead anyway) but not too much to report on - bridge work on sheepway is well underway, the compounds for track work are underway at marsh lane and Portbury hundred. Other than that and the existing work at Portishead station / road reworking station not much else just yet