• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Bridge Strike between Fenchurch Street and West Ham High Level No C2C on all lines. (24/07/26)

Kenny G

Member
Joined
20 Mar 2014
Messages
81
Fully appreciate that this must be causing significant issues but c2c are usually able to provide a service short of affected areas. Does this really require a full close down?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,411
Location
Northampton
From the live data maps it looks like services are starting to run again east of Barking. I would guess that given the location of the strike, control needed a brief time to work out what services could be operated, noting usefulness to passengers, Crew hours and so on.
 

Kenny G

Member
Joined
20 Mar 2014
Messages
81
From the live data maps it looks like services are starting to run again east of Barking. I would guess that given the location of the strike, control needed a brief time to work out what services could be operated, noting usefulness to passengers, Crew hours and so on.
Fair enough. I can see the dilemma as a couple of weeks back in the high temperatures they were trying to be extra hopeful and kept West Ham platform open as people experienced repeat cancellations/ delays. Today they closed the West Ham platform and posted online that all was closed for rush hour period. At least it meant I could make the decision to take an alternative non c2c route but it did feel different.
 

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
5,574
Location
The West Country
Seems to be a bridge on Manor Road West Ham. It’s been hit by a scaffolding lorry. LU are cautioning their own trains.
 

Kenny G

Member
Joined
20 Mar 2014
Messages
81
Seems to be a bridge on Manor Road West Ham. It’s been hit by a scaffolding lorry. LU are cautioning their own trains.
Fortunately the district line is still flowing as really didn't fancy having yet another 3 hour commute in current heat levels.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,411
Location
Northampton
1B64 1600 London Fenchurch Street to Shoeburyness was diverted via Stratford
As has 2B98 1607 LONDON FENCHURCH STREET - SHOEBURYNESS, and it looks like 2D46 1610 London Fenchurch Street to Pitsea will also do so. Up trains are beginning to divert via Stratford as well, so this bridge bash is very likely going to cause some huge consequentials.

2R09 1540 Grays to London Fenchurch Street is in West Ham up platform, presumably will either recover to West Ham depot wrong-road or just wait it out as passengers will have gone for the LU services.
 

Mattplans

Member
Joined
27 Sep 2024
Messages
698
Location
London, UK
A bit puzzled about how the same bridge strike at West Ham has decimated c2c but LU is running through with only minor delays.

Reminds me of a couple weeks back to the fire at New Cross, and Southeastern threw in the towel while London Overground trains which run much closer to the site of the fire were running through fine (for the first few hours that was).
 

SteveHFC

Member
Joined
1 Nov 2014
Messages
263
A bit puzzled about how the same bridge strike at West Ham has decimated c2c but LU is running through with only minor delays. Reminds me of a couple weeks back to the fire at New Cross, and Southeastern threw in the towel while London Overground trains which run much closer to the site of the fire were running through fine (for the first few hours that was).
I'm only guessing, but I wonder if it's a weight issue - are the c2c trains heavier than the District Line trains? It could also purely be different TOCs having different rules on how they react to the same situation.

(edited to add) It's also struck me that Network Rail may have put a line block in place, but London Underground didn't.
 

Expression357

Member
Joined
16 Jul 2009
Messages
87
Location
Essex
A bit puzzled about how the same bridge strike at West Ham has decimated c2c but LU is running through with only minor delays. Reminds me of a couple weeks back to the fire at New Cross, and Southeastern threw in the towel while London Overground trains which run much closer to the site of the fire were running through fine (for the first few hours that was).
This is quite simple.

Manor Road bridge at West Ham station is effectively 3 separate structures - so depending on what line has been struck and from what side, will dictate a certain impact.

Whether the vehicle was still stuck underneath the bridge will also prompt a different operational response.

And, underpinning all of that, each bridge will have a dispensation categorisation ranging from Green, Amber, Double Amber and Red. This will be determined by engineers based on the structure of the bridge and the level of mitigation in place.

If the bridge involved is categorised Red, then traffic over it has to be stopped until the bridge and the track is examined by a Bridge Strike Examiner (normally a MOM) who can reopen the line.
 

RUK

Member
Joined
5 Aug 2009
Messages
409
Location
East of England
Fully appreciate that this must be causing significant issues but c2c are usually able to provide a service short of affected areas. Does this really require a full close down?
Perhaps they had some trains trapped between Fenchurch Street and West Ham that they had to work out how they could replacements in place for?
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,168
Location
0035
A bit puzzled about how the same bridge strike at West Ham has decimated c2c but LU is running through with only minor delays. Reminds me of a couple weeks back to the fire at New Cross, and Southeastern threw in the towel while London Overground trains which run much closer to the site of the fire were running through fine (for the first few hours that was).
It will all come down to each company’s rules and procedures and the risk and robustness of their assets, and this would differ by infrastructure manager (so Network Rail or LUL) as opposed to train operating company.

In the case of NR, they have assessed each bridge’s robustness is assessed and they have given it a classification, in this case the bridge is given a red (stop trains classification). In comparison, LU has not assessed any of its bridges as requiring trains to be stopped, however for all bridges they will impose a 15mph (or 24km/h) TSR until assessed by civils, this is unless there is a sacrificial beam fitted in which case normal line speed applies.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,946
Location
London
A bit puzzled about how the same bridge strike at West Ham has decimated c2c but LU is running through with only minor delays. Reminds me of a couple weeks back to the fire at New Cross, and Southeastern threw in the towel while London Overground trains which run much closer to the site of the fire were running through fine (for the first few hours that was).

They are different bridges. Bridges also have a variety of classifications by NR. If it’s “red” that’s a job stopper until someone can be brought out to inspect as opposed to other classifications which might allow trains to initially run at reduced speed.

Luckily it wasn’t too long and although there were a few diversions via Stratford / Woodgrange Park sending too many would also have decimated the Elizabeth line service during the peak considering its 12tph.
 

Kenny G

Member
Joined
20 Mar 2014
Messages
81
I'm impressed there is enough capacity on the Stratford section at that time of day to squeeze additional C2C trains in. If they could include some Stratford trains into usual weekday peak operations it would definitely help with Elizabeth line and GA connections.
 

StephenHunter

Established Member
Joined
22 Jul 2017
Messages
2,896
Location
London
I'm impressed there is enough capacity on the Stratford section at that time of day to squeeze additional C2C trains in. If they could include some Stratford trains into usual weekday peak operations it would definitely help with Elizabeth line and GA connections.
That might happen with GBR Anglia; the 720s from GA have just been cleared for LTS.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,621
I'm impressed there is enough capacity on the Stratford section at that time of day to squeeze additional C2C trains in. If they could include some Stratford trains into usual weekday peak operations it would definitely help with Elizabeth line and GA connections.

There isn’t, really. The diversions caused some delay to Elizabeth Line services.


That might happen with GBR Anglia; the 720s from GA have just been cleared for LTS.

I can guarantee it won’t happen in normal circumstances.
 

saismee

Established Member
Joined
20 Oct 2023
Messages
1,688
Location
UK
That might happen with GBR Anglia; the 720s from GA have just been cleared for LTS.
That's just to simplify unit diagrams and maintenance. It probably won't have any effect on service except to cover LTS when multiple units need repairs.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,946
Location
London
I'm impressed there is enough capacity on the Stratford section at that time of day to squeeze additional C2C trains in. If they could include some Stratford trains into usual weekday peak operations it would definitely help with Elizabeth line and GA connections.

There isn't. Hence only a few went through and even then Elizabeth line services were slightly delayed. Services have to cross over onto the Down road at Gas Factory Junction which is not as bad, but crossing both the Down and then Up again to go towards Barking is what hurts, as well as the cautionary aspects with a C2C service running through.

It's a balancing act though; it would be difficult to justify sending nothing from Fenchurch St in the evening peak. As I said, it was lucky it wasn't prolonged or Elizabeth line services probably would have been reduced slightly to accommodate more diversions.

It definitely can't be part of the regular peak operations.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
It will also depends who sign the chord between Gas Factory and Bow Jns. It wasn't core route knowledge (and believe it still isn't) for c2c drivers. Newer drivers don't sign that route and Barking to Liverpool Street to start with.
 

racyrich

Member
Joined
25 Jan 2014
Messages
234
Service down the pan again this evening. 20 mph speed restriction all the way from Fen St to Campbell Rd junction in both directions, so 5+ min delays. Which sounds trivial but seemed to cause chaos.
No actual explanation why but presumably 1949 OHLE related.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,621
Service down the pan again this evening. 20 mph speed restriction all the way from Fen St to Campbell Rd junction in both directions, so 5+ min delays. Which sounds trivial but seemed to cause chaos.
No actual explanation why but presumably 1949 OHLE related.

Yes OHLE related.

Your defintion of “chaos” must be very different to mine.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,751
Location
Newport
If they could include some Stratford trains into usual weekday peak operations it would definitely help with Elizabeth line and GA connections.
A symptom of failing to build a C2C/Elizabeth line interchange.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,751
Location
Newport
C2C and Elizabeth line use the same platforms at Stratford though.
Yes. The E line platforms, but only at weekends, and then only those weekends where engineering work doesn’t prevent C2C running to Liv Street.

Monday to Friday there are usually no C2C trains at Stratford.
 

Top