Network Rail don't care about disruption, providing maintenance costs are saved: what could be done about this?

Port Road

Member
Joined
27 Sep 2025
Messages
84
Location
Scotland
Moderator note: Split from

Edited as requested.
I've been saying for years (not on here) that Network Rail couldn't give two hoots about delays as long as they are saving money on maintainance ("...to hell with the 'passengers'..."). Question is, how long is this going to be allowed to continue?

I have it on good authority that this debacle today only became a debacle due to the above policy.

Axle counter failure leaving a set of points route-locked reverse in Princes Street Gardens. No S&T on duty due to maintainance 'savings'; took 3 hours to get someone there and another hour to fix the problem. But, hey, NR couldn't give a cuss 'cos they're saving £xx per year, right?

Sack the Chief Executive? ('Jeremy Westlake'; annual salary c.£550,000...lots of maintainace/S&T cover for that amount of cash, eh?)

Am I being too harsh? Ask someone (anyone) who was on 9S54....
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

voyagerdude220

Established Member
Joined
13 Oct 2005
Messages
4,247
Am I being too harsh? Ask someone (anyone) who was on 9S54....
No, I quite agree.
Coincidentally I noticed yesterday at work 9S54 was fully booked, as my colleague mentioned he had sold a family tickets for it yesterday but unsurprisingly it was fully booked. I'm guessing with it being a 9-car, not 11, it was very busy.
 

Vexed

Member
Joined
12 Jan 2020
Messages
637
Location
Herts / Hants
Unfortunately, I think there's too much reactive maintenance and not enough proactive maintenance.

And with red zone working gone S&T have less opportunities to do maintenance during the day so they'll be less of them around to react to faults.
 

speedy1

Member
Joined
1 Sep 2023
Messages
302
Location
Mossley
£60bn+ in debt, up from £34bn in 2013. Where is the money going?? How'd it get into that state?
 
Last edited:

High Dyke

Established Member
Joined
1 Jan 2013
Messages
4,995
Location
Yellabelly Country
£60bn+ in debt, up from £34bn in 2013. Where is the money going?? How'd it get into that state?
Payments for all the experienced staff that were allowed to take voluntary redundancy?

Fair enough, you can't always predict equipment failures, but when the first question asked is: "are trains being delayed?", and the answer is  no, then you can see where priorities lie. Some locations have had faults for some considerable time, but all you get is finger pointing between departments and nobody takes responsibility.
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,674
Unfortunately, I think there's too much reactive maintenance and not enough proactive maintenance.

And with red zone working gone S&T have less opportunities to do maintenance during the day so they'll be less of them around to react to faults.
Scotland hasn’t had red zone working for a long time now, they outlawed it before everywhere else.

There’s simply fewer S&T (and staff in other departments) around these days. My section lost 23% of our staff to “Modernising Maintenance” on paper, figures will vary from section to section.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,265
There are obvious tradeoffs between the cost of increasing the number of staff available on call and the cost of increased disruption from staff taking longer to arrive on site to fix things.

All this stuff has to be paid for, there is no such thing as a free lunch and all that.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,369
Location
East coast of Yorkshire
Surely the Network Rail situation is another example of the failure of rail privatisation. Up until that point infrastructure and operations were all part of the same organisation, This situation existed from the birth of railways through grouping and nationalisation. I understand they were probably different departments, but ultimately all reported to the same board/boss.

The current situation where the bean counters try and pare everything back to the absolute minimum to 'save money' probably does on paper, but if you look at the wider costs resulting from disruption for example it doesn't. It just means other organisations and individuals have to absorb the costs and inconvenience resulting from failures of Network Rail to invest to fund things.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,824
Surely the Network Rail situation is another example of the failure of rail privatisation. Up until that point infrastructure and operations were all part of the same organisation, This situation existed from the birth of railways through grouping and nationalisation. I understand they were probably different departments, but ultimately all reported to the same board/boss.

The current situation where the bean counters try and pare everything back to the absolute minimum to 'save money' probably does on paper, but if you look at the wider costs resulting from disruption for example it doesn't. It just means other organisations and individuals have to absorb the costs and inconvenience resulting from failures of Network Rail to invest to fund things.
British Rail never tried to pare back the costs? Aren’t there various bits of the network where capacity is limited because BR cut back to save on maintenance. (E.g. singling previously double track lines)
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,265
British Rail never tried to pare back the costs? Aren’t there various bits of the network where capacity is limited because BR cut back to save on maintenance. (E.g. singling previously double track lines)
I think they are arguing that British Rail tried to pare back total costs.

Network Rail and other actors in the industry today all pare back their own costs without respect for total industry costs.

Then you end up with cross cutting behaviours that undermine potential overall savings.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
A year or two ago we had a link to a NR document which I thought I had saved, but can't find now. It laid out clearly the likely consequences of the maintenance cuts that they were implementing, which included (IIRC) increasing failures of lineside equipment which would cause delays. This would be acceptable though because everything failed to safety...
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
112,941
Location
"Marston Vale mafia"
Is this not one of the things vertical integration through GBR is supposed to address, so there aren't different motivations between TOC and Network Rail? Might not work in Scotland though as it will for now at least remain separate there.
 

alxndr

Established Member
Joined
3 Apr 2015
Messages
1,674
There are obvious tradeoffs between the cost of increasing the number of staff available on call and the cost of increased disruption from staff taking longer to arrive on site to fix things.

The vast majority of S&T aren’t on call, that tends to just be in a few more remote areas where there isn’t 24/7 cover. Traditionally S&T will have staff on duty 24/7 either doing maintenance where still possible during the day or on standby for fault cover.

If there were no staff in Edinburgh then most likely they would need to come from another depot with staff on duty rather than as a call out from home.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,824
Is this not one of the things vertical integration through GBR is supposed to address, so there aren't different motivations between TOC and Network Rail? Might not work in Scotland though as it will for now at least remain separate there.
Hasn't Scotland been semi-integrated from some time already? There was the alliance agreement between Scotrail and Network Rail Scotland, and Alex Hynes was head of both.
 