Is this 20 mph restriction what has killed the revised timetable that was due to be implemented later this year?
If the Ffestiniog tunnel is going to need expensive work carried out on it, then this really should be the final straw to call into question the lines viability. Just how much money is going to be thrown at shoring up a service that is next to useless?
At one time, converting all or part of the line to a heritage operation might have been plausible, but with most heritage railways struggling these days, I don't think anyone in their right mind would take on the Conwy Valley these days. Especially with its propensity for swallowing sizeable sums of money in infrastructure costs. I certainly can't see the Ffestiniog touching it with a bargepole. And if running at only 25mph, the increase in journey time would mean it would only be tourists using it.
I must admit that Blaenau having the same ticketing statistics as Betws is odd. Is that because much of Betws traffic is tourists, many of whom are on rover tickets, so don't show on the stats. I have to admit that I am not up to date on what bus and rail rovers are available these days, since the demise of the red rover. I also wonder how the free concessionary travel affects the statistics, as I suspect that a lot of local passengers are travelling on such passes - at places like Llandudno and the Junction you are told to get the ticket on the train, but many guards only want to issue them when they have time on their hands after Betws.
A 2tp3h (or a train every 90 minutes) would be little better than what we have now. It would mean that you would have alternate bad and very bad connections. What is needed is no connection at all - a through service. And god help us if we need to make connections at both Blaenau and Betws.
If the Ffestiniog tunnel is going to need expensive work carried out on it, then this really should be the final straw to call into question the lines viability. Just how much money is going to be thrown at shoring up a service that is next to useless?
At one time, converting all or part of the line to a heritage operation might have been plausible, but with most heritage railways struggling these days, I don't think anyone in their right mind would take on the Conwy Valley these days. Especially with its propensity for swallowing sizeable sums of money in infrastructure costs. I certainly can't see the Ffestiniog touching it with a bargepole. And if running at only 25mph, the increase in journey time would mean it would only be tourists using it.
I must admit that Blaenau having the same ticketing statistics as Betws is odd. Is that because much of Betws traffic is tourists, many of whom are on rover tickets, so don't show on the stats. I have to admit that I am not up to date on what bus and rail rovers are available these days, since the demise of the red rover. I also wonder how the free concessionary travel affects the statistics, as I suspect that a lot of local passengers are travelling on such passes - at places like Llandudno and the Junction you are told to get the ticket on the train, but many guards only want to issue them when they have time on their hands after Betws.
A 2tp3h (or a train every 90 minutes) would be little better than what we have now. It would mean that you would have alternate bad and very bad connections. What is needed is no connection at all - a through service. And god help us if we need to make connections at both Blaenau and Betws.