The UK rail network just can’t cope with this extreme heat, to put it bluntly.

A problem not confined to the UK:


France’s heatwave turned a train ride from Paris–Nice into a nightmare for everyone on board. The train is said to have stopped on the tracks for almost four hours under the hot sun. With no air conditioning, some passengers reportedly struggled to breathe and had to even step outside for fresh air. This incident has shown how extreme heat is disrupting normal travel across the world.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,370
Not only does this wider range of climate conditions mean it is harder to specify new kit that is suitable for all occasions, but the rapid change in what we have to consider normal means that anything that was specified more than 20 years ago to cope with 99% is now only able to cope with 95% but is nowhere near ready for replacement or retirement.
I think that the problem is that we learn by experience that certain rolling stock has particular vulnerabilities, but that maintenance depot staffing is so restricted and hide-bound by contracts and by shareholder pressures that ramping up attention on something that is outside the plan can't (or just won't) be done.

A current example might be vacuum cleaning A/C and engine cooling heat exchanger matrix inlet sides each night. "Not in the contract!" "Nobody on the staff to do it!" Who cares that it means loads of trains out of service and a nightmare for passengers? (Clue: it's not the accountants, they will claim the credit for not allowing any extra expenditure.)
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,738
Location
West Riding
Northern have very sensibly pre-emptively withdrawn the Yorkshire Flyer tomorrow, to hopefully improve overall reliability on that corridor during the hot weather.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,646
Location
Isle of Man
It’s not particular to the UK.

I’m in France this week where it is 33C. The local transport operator have just cut the frequencies on the buses and trams here by about 40% because they’re having lots of technical faults all caused by the heat.
 

chipbury

Member
Joined
29 Mar 2021
Messages
165
Location
Bath
Today we attempted a journey from Freshford to Waterloo (via Salisbury).

Unfortunately there was signalling issues between Westbury and Warminster, combined with a level crossing issue at an unspecified location on the Exeter/Waterloo route. Also at Westbury all the passenger information screens were out of order so the poor platform staff were really struggling to sort out many questions.

We abandoned the journey and just enjoyed two trips on a 166 with no AC...

It's been suggested to me that we will not be booking any train tickets for long distance again, unfortunately I have to agree with this opinion. Especially as it is the same time and cheaper to drive to London now than take a train.
 

JohnofWessex

Member
Joined
3 Jan 2026
Messages
159
Location
frome
What I suggest we are looking at is a combination of extreme heat which is becoming increasingly common and under inveatment.

If Reliability was made a priority and the necessary money spent then things could be better
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,370
What I suggest we are looking at is a combination of extreme heat which is becoming increasingly common and under investment.

If Reliability was made a priority and the necessary money spent then things could be better
Don't forget that it is necessary to spend money ("invest") in looking after what assets you have already got to get the best out of them. There is no "fit and forget" - especially on the operating railway.

Unfortunately, in today's world, paying enough people to maintain or look after things is out of fashion. I can't understand why, when even software needs maintaining - and that doesn't have a hard life like the railway's physical assets do!
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,806
Location
South Yorkshire
What is the Yorkshire Flyer or Northern Flyer?
It is the "fast" service between Leeds and Sheffield calling only at Wakefield Westgate. It should run hourly on the opposite half hour to the Cross Country service. It started operation with the December 2025 service.
It's normally formed of a single class 158 unit.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,738
Location
West Riding
It is the "fast" service between Leeds and Sheffield calling only at Wakefield Westgate. It should run hourly on the opposite half hour to the Cross Country service. It started operation with the December 2025 service.
It's normally formed of a single class 158 unit.
Also, worth mentioning that it's very much squeezed into the timetable and that there are 5tph still between Leeds and Sheffield per hour still without it, although some of them are long journey times and others are inadequately formed. Withdrawing the Flyer improves reliability on the key stretch of the ECML spur from Leeds to the junction for Moorthorpe, and no single station loses its service so it doesn't incur much (if any) delay repay cost.
 

EuxtonNeutral

Member
Joined
5 Apr 2025
Messages
49
Location
London
If records are being broken it must be rare, but I know what you mean.
Records are being broken every year now. Record-breaking heat is no longer a rare occurrence. Thanks to the el-Nino, these records will likely be broken again in 2027, set to be the hottest year on record (again). I think it’s important to be straight with ourselves: extreme weather is the new normal.
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,799
Must admit to being educated about pollen affecting rolling stock! Never thought that was a thing! Personally had a horrible few days with pollen fever, swollen eyes, glands, burning face etc, used up my full supply of prednisolone!

The odd thing was the met office site said pollen was "low" while other weather apps said "high to severe".

Tree pollen is easy to see as alluded to, what filters does a train have, I could do with some attached to my portable air con!
 

EuxtonNeutral

Member
Joined
5 Apr 2025
Messages
49
Location
London
Something that has never happened before is, by definition, unique. Therefore it cannot be anything other than rare.
Numerous heat records have been broken so far this year. 6, at the very least. More to come. This has occurred regularly in the last few years, with 2022 another extreme year. Next year will be worse because of el-Nino. The science predicts ongoing heating.

It is now not rare for UK summer heat records to be broken. Which means that it is not rare for 30C + temperatures to occur in summer.

For the purposes of infrastructure planning policy, that is the relevant reality. It seems important that the railway (and society as a whole) should grasp this.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,404
Location
East coast of Yorkshire
Numerous heat records have been broken so far this year. 6
Since around 2000 the highest summer temperatures have increased by about 4C, this isnt the average annual temperature rise which is lower, but its maximums which cause the disruptions. It seems likely that 40.2C of 2022 will be exceeded again soon, with 40C eventually occuring most years. Given that the infrastructure life cycle is much much longer than the current rate of climate change there are problems ahead.

So are there any short term measures to try and mitigate what will undoubtably become a recurring problem every summer. Obviously maintenance is important, but operating something 5C above its design temperature is going to result in problems and failures. The recent Eurostar changes to their new fleet (45C > 55C) are an indicator of what needs to be done long term, but there is an awful lot of stuff that probably has anything from 10-30 years life that may not be able to cope with the conditions that occur during the later part of its life.

I would also ask if UK rail procurement is making changes to requirements now, the Eurostar change looks like a sensible response, but UK procurement is driven by the treasury, and 'cheap as possible, just about adequate' seems to be the mode of operation. Are current rolling stock orders taking rising temperatures into account?
 

speedy1

Member
Joined
1 Sep 2023
Messages
449
Location
Mossley
I think the future is going to look like what Renfe are doing with buses/coaches, especially outside of London.

Renfe already have 10 year plans with partners, and they think there could be a 900% increase in demand in the future to cover more parts of the rail network.

(edit: to clarify my meaning: I meant the British government copying what Renfe are doing in Spain with expanding their use of buses to serve their 'rail' network. For the avoidance of doubt, I did not mean Renfe would be running a part of the UK rail network, neither with trains nor buses. By "outside of London" I was speculating this plan would be implemented more so outside of London)
 
Last edited:

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,844
I think the future is going to look like what Renfe are doing with buses/coaches, especially outside of London.
I had no idea they were operating in an area that we might consider to be "outside of London". Perhaps you could enlighten us.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,370
I had no idea they were operating in an area that we might consider to be "outside of London". Perhaps you could enlighten us.
My recent experience of RENFE (Seville/Huelva/Cadiz) is of woefully inadequate infrequent short D- and E-multiple units with compulsory reservations - and a thriving inter-urban coach service paralleling rail lines, running hourly, both non-stop and calling intermediately - and extras put on if the number of reservations goes over the first bus-full.
 

speedy1

Member
Joined
1 Sep 2023
Messages
449
Location
Mossley
My recent experience of RENFE (Seville/Huelva/Cadiz) is of woefully inadequate infrequent short D- and E-multiple units with compulsory reservations - and a thriving inter-urban coach service paralleling rail lines, running hourly, both non-stop and calling intermediately - and extras put on if the number of reservations goes over the first bus-full.
Sounds like a very successful operation with the coaches. It's nobody idea of perfect (that would be high speed trains), but it sounds pragmatic and something they got into place relatively quickly (?). I think that's commendable.
 
Last edited:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,474
Location
Somerset
Sounds like a very successful operation with the coaches. It's nobody idea of perfect (that would be high speed trains), but it sounds pragmatic and something they got into place relatively quickly (?). I think that's commendable.
Replacing a train with a coach is rarely a “successful operation” except in the eyes of the bean-counters in an office so far away that they don’t actually have to use the so-called “service”.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,404
Location
East coast of Yorkshire
Sounds like a very successful operation with the coaches.
Having spoken to a couple of friends who now live in Spain I understand that the Spanish motorway network is in general no where near as congested as the UK network for the most part. In the UK a lot of significant rail destinations are also a considerable distance from a motorway or equivilent standard road. As a result journey times will extend and comfort will decrease to the point where I suspect the public transport option would be dimissed by most people.
 

speedy1

Member
Joined
1 Sep 2023
Messages
449
Location
Mossley
Replacing a train with a coach is rarely a “successful operation” except in the eyes of the bean-counters in an office so far away that they don’t actually have to use the so-called “service”.
I get it, this is a rail forum. And our current approach to RRB is generally not great. I don't see the need to be so dismissive though, especially when someone appears to be highlighting a successful operation.

== Doublepost prevention - post automatically merged: ==

In the UK a lot of significant rail destinations are also a considerable distance from a motorway or equivilent standard road.
Got some examples? And what do you consider considerable? Remember a lot significant rail destinations (I assume you mean stations in large towns/cities) are not the actual beginning or end of a person's journey
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,474
Location
Somerset
I get it, this is a rail forum. And our current approach to RRB is generally not great. I don't see the need to be so dismissive though, especially when someone appears to be highlighting a successful operation.
Andrew E’s post explains - AIUI the “operation” is not running RRBs during disruption but abandoning train services and substituting with buses on a permanent basis. If that is wrong, then I apologise.
 

speedy1

Member
Joined
1 Sep 2023
Messages
449
Location
Mossley
Andrew E’s post explains - AIUI the “operation” is not running RRBs during disruption but abandoning train services and substituting with buses on a permanent basis. If that is wrong, then I apologise.
I mentioned RRBs in the context that it's the closest thing we have to compare, and assumed that's what your opinion of coaches run by the railway is based on. I think we're close to talking past each other
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,474
Location
Somerset
I mentioned RRBs in the context that it's the closest thing we have to compare, and assumed that's what your opinion of coaches run by the railway is based on. I think we're close to talking past each other
Possibly. I also gave plenty of experience of buses operated by the Deutsche Bundesbahn as a supplement to skeleton rail services - not impressed.
 

EuxtonNeutral

Member
Joined
5 Apr 2025
Messages
49
Location
London
I get it, this is a rail forum. And our current approach to RRB is generally not great. I don't see the need to be so dismissive though, especially when someone appears to be highlighting a successful operation.

== Doublepost prevention - post automatically merged: ==
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,404
Location
East coast of Yorkshire
Got some examples?
Locally to me Scarborough is a good example its around 40 miles to the nearest 'decent' road (York). It has a very seasonal flow, with overcrowding at busy times. Rail takes 50 minutes to York. The road journey even at quiet times is about 1h 20m in a car, and would be longer in a coach, and at busy times, which is when the extra capacity is needed will be around 2hrs, or even longer if as happens frequently, there is an accident.
 

Top