Moderator note - split from:
www.railforums.co.uk
May 2026 timetable
I was just looking for my daughter who wants to go from Hull to Manchester later this year and there don't appear to be any Hull to Manchester directs into September. I can see them throughout July and into August on RTT. Seem to stop 10th August and resume 7th September.
I don't think this would be possible, I know they do it at peak times, but I think they should look at the possibility of making services from Waterloo to Aldershot via Ascot more of a permanent thing which would give Camberley and Bagshot better connections into Central LondonA permanent change for greater connectivity. While it adds two minutes to the overall journey time, it may also reduce the length of journey for sone users.
https://www.southwesternrailway.com/plan-my-journey/timetables
Last edited by a moderator: