What would a dream future cross-country train be like?

Noddy

Established Member
Joined
11 Oct 2014
Messages
1,630
Location
UK
Whilst leaving Oxford on an overcrowded cross-country train, I wondered what a future dream rolling stock provision would look like?

So, with money no barrier, how about (1) 10 coaches, loco-hauled with DVT the other end, (2) buffet car, (3) many seats lining up with the windows, (4) comfortable seats with lots of leg room, (5) discrete but useful electronic announcements, (6) highly reliable stock that can cope with all temperature ranges (and diversion capability if needed), (7) lighting that is not overbearing at night, (8) paper timetables on tables highlighting the views of points of signficance that will be passed, (9) nice internal decor away from the usual bland "everything white"

Curious what others think such a dream train might be like?

I don’t understand why everyone here is so obsessed with obsolete loco hauled trains. My preference would be a level boarding battery bi-mode 730. (Obviously not a 730 but something with similar layout and interior). Maybe a bit more luggage storage. The 1/4 3/4 door arrangement would massively speed up dwell times.

If we have magic money tree, I would go for all 10 car trains, with 10 rows in the middle section, and 5 rows in each end section. Without infinite money, I would do a uniform 8 car layout, with 6+11+6 (3 more rows per carriage), minus luggage racks. Likely around ~600 seats per train (slightly more with 10 car), triple a current 4 car.

Not pracrical. The XC network passes through so many parts of the country which for historical reasons had different platform rail interfaces. The only real solution is to rebuild nationaly nearly every paltform to a common standard and all new trains conform to that.

The 9 car 80x solution with ASDO* (80x can have shorter carriage lenghs as per East Midlands Trains) with Tri-Mode would be my dream solution that is realistic.

*Automatic Selective Door Opening.

Why do folk always obsess over the number of coaches? It’s completely irrelevant. Modern coaches can be anywhere between 20m to 26m. Surely overall or usable length is much more important metric.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,452
Location
Preston Lancs
I don’t understand why everyone here is so obsessed with obsolete loco hauled trains.
i grew up with loco hauled travel and loved it with a passion and miss it like crazy. For me every train would be top and tailed with a locomotive. ETS of 100.
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,174
Location
LBK
I don’t understand why everyone here is so obsessed with obsolete loco hauled trains.
Loco hauled trains aren't obsolete. Some European countries are ordering them even today because of the operational flexibility they offer in terms of capacity if not redundancy.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
Loco hauled trains aren't obsolete. Some European countries are ordering them even today because of the operational flexibility they offer in terms of capacity if not redundancy.
Loco-hauled was ruled out of IET options by DfT’s Stuart Baker wrongly claiming that it took 15 minutes to couple a loco. It was presumed he’d seen the pantomime of a Pendolino drag.

Just imagine if the only thing you needed to do to strengthen a train was add some completely unpowered dumb vehicles without driving cabs. (Sigh.)
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,174
Location
LBK
Loco-hauled was ruled out of IET options by DfT’s Stuart Baker wrongly claiming that it took 15 minutes to couple a loco. It was presumed he’d seen the pantomime of a Pendolino drag.
Had he never left these fair shores?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,262
Loco hauled trains aren't obsolete. Some European countries are ordering them even today because of the operational flexibility they offer in terms of capacity if not redundancy.
There aren't that many.

As far as I know, the vast majority of passenger rolling stock being built these days is multiple units.

And a lot of "loco-hauled" stock being built these days is used in fixed formation push-pull sets that are effectively multiple units in operational terms.
 

geoffk

On Moderation
Joined
4 Aug 2010
Messages
3,920
Location
Exeter
No-one has mentioned adding 3 rail capability for Basingstoke - Bournemouth, or is that just one complexity too many (especially if a separate sub-fleet is required)?
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,244
Loco-hauled was ruled out of IET options by DfT’s Stuart Baker wrongly claiming that it took 15 minutes to couple a loco. It was presumed he’d seen the pantomime of a Pendolino drag.
Was that wrong? It certainly took around that time for a loco swap at Crewe when that was how Euston to Holyhead was worked.

Many guards would announce it and suggest people who wanted to have a smoke go on to the platform to do so.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,303
Location
Somerset
Loco-hauled and highly reliable is an oxymoron these days: it introduces an unnecessary single point of failure (the locomotive) on services. There are no longer ‘spare’ locos dotted around the network to rescue failed trains.

I understand the comfort point behind much of your wish list here, but not the loco-hauled part?
Let’s put it a different way. No under-floor diesel engines.

== Doublepost prevention - post automatically merged: ==

Was that wrong? It certainly took around that time for a loco swap at Crewe when that was how Euston to Holyhead was worked.

Many guards would announce it and suggest people who wanted to have a smoke go on to the platform to do so.
If the infrastructure /signalling is set up correctly, it should take no longer than coupling /uncoupling two units. Possibly even less as there are no passengers in the loco to needs doors closing etc. I doubt any alterations were made to signalling / infrastructure at Crewe to facilitate quick attachment. Anywhere there’s a reversal there’s potentially even less time lost.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,262
No-one has mentioned adding 3 rail capability for Basingstoke - Bournemouth, or is that just one complexity too many (especially if a separate sub-fleet is required)?
I would certainly think that would be a nice feature if it is possible, but not that much of XC is really on third rail any more.
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,240
I would certainly think that would be a nice feature if it is possible, but not that much of XC is really on third rail any more.
I think it's just Basingstoke to Bournemouth, which is ~60 route miles out of 850 on the core CrossCountry network (Bournemouth / Plymouth – Manchester / Edinburgh).
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,204
Location
Oxford
Dual voltage equipment is pretty trivial these days, any kind of electric unit that'll run on DC could (and should) be fitted with shoes etc. Yes, Basingstoke to Bournemouth isn't a huge proportion of the XC network, but it's not an insignificant nothing section either.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,244
If the infrastructure /signalling is set up correctly, it should take no longer than coupling /uncoupling two units. Possibly even less as there are no passengers in the loco to needs doors closing etc. I doubt any alterations were made to signalling / infrastructure at Crewe to facilitate quick attachment. Anywhere there’s a reversal there’s potentially even less time lost
The loco needs to go somewhere and come from somewhere.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,204
Location
Oxford
That isn't possible.
How so? You can't do splitting and joining if it's not possible for one part of a train to wait in a platform for the other part.

And you clearly can do splitting and joining, it happens hundreds of times every day.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,244
How so? You can't do splitting and joining if it's not possible for one part of a train to wait in a platform for the other part.

And you clearly can do splitting and joining, it happens hundreds of times every day.
It's not a splitting / joining train. The loco has to come from somewhere before the attachment, and it needs to go somewhere after detachment.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,204
Location
Oxford
Ok yes, we're talking about different things then. That arrival/ departure is not part of the time take to split/ join, and if the timetable permits the loco could just wait in the platform between duties. But it might need to shunt away somewhere too.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
Was that wrong? It certainly took around that time for a loco swap at Crewe when that was how Euston to Holyhead was worked.
In my BR ops days, 10 mins was a standard run-round allowance and 10 or less for a loco swap depending on location. The Met line steam/diesel swaps (well before my time!) were usually quoted as 2-3 minutes. I’m also told by those from that area that the 33/1 attachments/detachments at Bournemouth were pretty fast too.

As for Mr Baker, it took Roger Ford in Modern Railways to call out his belief that he knew more about physics than Isaac Newton and that distributed traction did not bring magical properties.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
Why do folk always obsess over the number of coaches? It’s completely irrelevant. Modern coaches can be anywhere between 20m to 26m. Surely overall or usable length is much more important metric.

Even usable length isn't that helpful, as taking an extreme example, if 2/3rds of a train is 1st class vs a train which is all standard class is going to be able to carry a vastly different number of passengers.

As to what it should look like:
- a mix of 9 coach and 5 coach fleet (the latter being the minority)
- ideally able to work with XC & LNER stock
- the 5 coach stock used to run services like Scotland to Cardiff/Plymouth
- 2 engines plus a battery (5 coaches) or 3 engines plus 2 batteries (9 coaches)
- would require extra maintenance deposits, again ideally one in GWR land to aid them (especially if the order allows several of the 5 coach GWR sets to be lengthened to 9 coaches)
- the above is due to the fact that Central Rivers wouldn't be available to the new sets until at least some (if not a significant number and maybe even all) 22x's are withdrawn from passenger duties as the maintenance facilities wouldn't be suitable (the new 5 coach sets would be too long and with 9 coach sets as well, it'll need significant changes to service the new fleet)
- ideally more electrification, could allow the fleet to loose the diesel engines in due course
 

Noddy

Established Member
Joined
11 Oct 2014
Messages
1,630
Location
UK
Even usable length isn't that helpful, as taking an extreme example, if 2/3rds of a train is 1st class vs a train which is all standard class is going to be able to carry a vastly different number of passengers.

As to what it should look like:
- a mix of 9 coach and 5 coach fleet (the latter being the minority)
- ideally able to work with XC & LNER stock
- the 5 coach stock used to run services like Scotland to Cardiff/Plymouth
- 2 engines plus a battery (5 coaches) or 3 engines plus 2 batteries (9 coaches)
- would require extra maintenance deposits, again ideally one in GWR land to aid them (especially if the order allows several of the 5 coach GWR sets to be lengthened to 9 coaches)
- the above is due to the fact that Central Rivers wouldn't be available to the new sets until at least some (if not a significant number and maybe even all) 22x's are withdrawn from passenger duties as the maintenance facilities wouldn't be suitable (the new 5 coach sets would be too long and with 9 coach sets as well, it'll need significant changes to service the new fleet)
- ideally more electrification, could allow the fleet to loose the diesel engines in due course

Yeah but we all know that a 5 coach 80X is a completely differently beast to a 5 coach Voyager due to the appalling inefficient layout of the latter. A 5x26m unit is longer than a 6x20m unit. A 9x26m unit is 54m longer than a 9x20m unit, and almost as much as a 12x20m unit such as a class 745.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,624
In my BR ops days, 10 mins was a standard run-round allowance and 10 or less for a loco swap depending on location. The Met line steam/diesel swaps (well before my time!) were usually quoted as 2-3 minutes. I’m also told by those from that area that the 33/1 attachments/detachments at Bournemouth were pretty fast too.

As for Mr Baker, it took Roger Ford in Modern Railways to call out his belief that he knew more about physics than Isaac Newton and that distributed traction did not bring magical properties.
10 minute run round? Assume that wasn't for freight too!
 

squingo44

Member
Joined
5 Jan 2026
Messages
173
Location
London
At a minimum: electrify the entire cross country main line, quadrupling the track in busy areas with local metro service like Birmingham and Leeds. Rebuild all stations along the route with step-free access and level boarding.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,050
Location
Reston City Centre
Obviously nobody is going to argue with cost-free statements like "comfortable seats and excellent window alignment"... Sure, nobody is going to argue against those in principle (only when they come up against other costs/benefits).

However i really don't understand why, if you're trying to tackle the capacity problems that XC experience, your starting point would be "I'd like a twenty meter long non-passenger unit at the front of the train, which will act as a single point of failure, plus a further twenty metres of space at the rear taken up by a non-passenger unit

Fifteen minutes to attach/detach a locomotive may sound like it's erring on the side of caution but the realities of performing this procedure at a busy station like New Street wouldn't be fast, especially after BR "simplified" track layouts forty or so years ago). Fine if you have a dedicated platform at a quieter station, like in The Good Old Days, where the detached 33 could just occupy the platform waiting for the next EMU to arrive... But I remember how it worked at places like Carstairs. Great fun for enthusiasts , no doubt, but a long delay for through passengers. Good luck if your plan involves hogging a platform at a busy modern station, with that platform specifically dedicated to XC

If you grasped the nettle and split XC into a "Manchester to Reading/ beyond" corridor and a "ECML to West Country" corridor (to minimise complications/ delays, simplify operations etc) then it might be worth considering some Third Rail capacity for units running the first corridor and some 125mph capacity for units running the second corridor. Both would come at costs, but may be worth justifying on those specific corridors. However, keeping the existing muddle of services and paying to ensure that a "go anywhere" fleet of identical trains would have both Third Rail and 125mph capabilities sounds like a very expensive bit of gold plating, designed to make them sound prohibitively expensive. Keep It Simple, Stupid.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,582
Location
Greater Manchester
140mph capable, tri-voltage (battery, 3rd rail, OLE) and some diesel for Devon/Cornwall and Aberdeen services.

Large doors at thirds (think 195s) for better flow (surely over double than what you can get on a Voyager).
Low floor as minimum at entrances, internal ramps if underfloor space is insufficient for batteries and diesel (unless a power pack solution is used).

Probably 9 car at 26 metre if Hitachi, other manufacturers would provide different but similar results in terms of seating.

Seating aligned with windows, and good seats (cue discussion). High amout of tables with suitable legroom

I would say tilting but I think that's getting too fanciful even despite the rest of my post, and might be extra-difficult with low floor.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
Fifteen minutes to attach/detach a locomotive may sound like it's erring on the side of caution but the realities of performing this procedure at a busy station like New Street wouldn't be fast,
With ‘dream’ in the thread title let’s dream that there will be a time when our former second city won’t need diesels for nine* of its radial routes.
Keep It Simple, Stupid.
Yep. Electric traction throughout.

* To/via Derby, Leicester, Oxford, Stratford, Bristol, Cardiff, Hereford, Stourbridge, Shrewsbury.
 
Last edited:

Technologist

Member
Joined
29 May 2018
Messages
467
Dream Cross Country Train:

9 car BEMU derived from off the shelf automotive componentry, transformer replaced by DC-DC converter. Carries 39 tonnes of batteries (6MWh) for a 150 mile range off wire at express speeds. It has 35MW (46,500bhp) from a pair of Lucid Air PM motors (32kg) per axle. It has an eddy current braking system capable of slowing the train at up to 2ms-2 irrespective of the traction conditions.

It accelerates at 1.3ms-2 up to over 125mph, top speed north of 300mph on battery, 200mph+ on OHLE. When not operating on a mixed traffic line the vehicle uses its massive acceleration to allow it to reach much higher speeds than current trains can between geometric restrictions, it also tilts. Net result is that we get high speed train timetables on existing lines, the high acceleration means we can stop at most stations and express trains aren't needed ergo we can have higher capacity.
 

Top