johncrossley
Established Member
I forgot SWR have Tap2Go so they may already be set up to deal with tapping in and out at the same station. Does anyone know what happens if you use Tap2Go in this way?
Tap in tap out within 10 minutes at opposite gate lines no charge, don't tap out, penalty fare is charged.
That doesn't solve the problem you're quoting. Also, you can't penalty fare people in this way, do you mean a maximum fare?Tap in tap out within 10 minutes at opposite gate lines no charge, don't tap out, penalty fare is charged.
Exactly and I note that's what one respondent said in response to the planning application.In the Netherlands, it is common practice to walk through a station to get from one side to the other, including gated stations. You simply tap in and tap out at the other end. When you tap out, the system cancels the journey and you are not charged anything. So anywhere with ITSO or contactless validity (so including Guildford) could allow this if they wanted to.
Contactless is being rolled out to Guildford soon, probably later this year. The system already provides for no fare to be charged when exiting at the same station within 2 minutes. I've read elsewhere that this extends up to 30 minutes in some circumstances, I'm not sure whether that would apply at Guildford once PAYG goes live there.There is no contactless (bank) card validity at Guildford. SWR has an ITSO 'Touch' smartcard, but it's limited in its usefulness and doesn't seem (to me) to be widely used except by commuters, who presumably have a season ticket loaded on it.
You could charge a penalty if rules were changed. Or just close the bridge for people wanting to pass through and make them go around the station, exactly like SWR are proposing, that is the simple and easy answer. No ticket, no entry like it should be.That doesn't solve the problem you're quoting. Also, you can't penalty fare people in this way, do you mean a maximum fare?
There are five rail routes from Guildford.No ticket, no entry like it should be.
This is a much quicker/easier/cheaper solution to prevent some fare-dodging and prevent staff assaults at Guildford though, so it doesn't surprise me that SWR are doing this (and tbh I'm surprised they didn't do this years earlier).There are five rail routes from Guildford. On every one of them, the next station is only a short distance away (around 1 - 3 miles), and all five are open stations (Worplesdon, London Road, Shalford, Farncombe, Wanborough). Until SWR addresses this, closing the back door at Guildford will have little effect beyond annoying passengers and those who have used the bridge legally for decades.
However very easy for revenue protection officers to observe and then challenge an individual.Doesn’t solve Tap in, Tap out, but don’t walk out!!!
The pavements are each more than wide enough for two or even three people to walk alongside, and easily wide enough for a pedestrain to pass a pushchair. For evidence, look at Google maps street view, where you will see a mum with two kids one each side.
Planning guidance under LTN 1/20 is that pavements should be a minimum of 2 metres width, without obstructions such as communications boxes or lamp posts.
Farnham Road does not meet that standard.
Does this only apply to new pavements?Planning guidance under LTN 1/20 is that pavements should be a minimum of 2 metres width, without obstructions such as communications boxes or lamp posts.
Farnham Road does not meet that standard.
Yes, in the same way that much of this country's Victorian housing stock doesn't meet modern Buildings Regulations.Lots of pavements don‘t.
It's not adding a new pavement though or replacing the bridge with it. The pavement already exists as a route.Yes, in the same way that much of this country's Victorian housing stock doesn't meet modern Buildings Regulations.
Removing existing provision, and replacing it with inferior provision that doesn't meet modern standards is certainly... a choice.
Guidance I think is the key word here.Planning guidance under LTN 1/20 is that pavements should be a minimum of 2 metres width, without obstructions such as communications boxes or lamp posts.
Farnham Road does not meet that standard.
Yes but it is now being designated as the alternative to an existing route that much more closely meets the guidance. And in the original agreement with BR the substitution of an alternative route was only permitted if it was "equally commodious" or something along those lines, which a narrow pavement clearly isn't. They are trying to get around that requirement by getting rid of it.It's not adding a new pavement though or replacing the bridge with it. The pavement already exists as a route.
Yes but it is now being designated as the alternative to an existing route that much more closely meets the guidance. And in the original agreement with BR the substitution of an alternative route was only permitted if it was "equally commodious" or something along those lines, which a narrow pavement clearly isn't. They are trying to get around that requirement by getting rid of it.
Back in the noughties, they closed access to the footbridge after 10 pm and all day Sundays. At the time I didn't know about the planning right.At least part of the ticketless travel must be a result of SWR's habit of leaving the Guildford Park Road entrance unstaffed, with the gates open. The cynic in me thinks that, once SWR has extinguished the public access, they will 'discover' that there's still a problem, and move to closing the back entrance outside staffed hours, possibly meaning it will only be open at peak times.
If SWR is really interested in reducing ticketless travel, why have stations like Farncombe and London Road been left as fully open at all times.
What I don't understand is how closing the footbridge will stop abuse as people coming with no ticket may kick off regardless.This is a much quicker/easier/cheaper solution to prevent some fare-dodging and prevent staff assaults at Guildford though, so it doesn't surprise me that SWR are doing this (and tbh I'm surprised they didn't do this years earlier).
Also for passengers to/from any of the open stations, if at least one end of their journey at Guildford now has ticket barriers that they can't simply waltz through by claiming to be crossing the bridge (or, when SWR leave the back barriers open at Guildford, simply waltz through entirely...), it will make some difference for no cost to SWR.
Fixing the other stations will require the capital installation cost of adding barriers, and increased staffing costs as the stations would need to be staffed start-to-finish else the barriers would be left open, making the money spent useless.
I’m not actually sure why this thread is debating it
In part because this is an example of the railway taking actions to the detriment of the communities it serves. A behaviour I think most of us would have hoped would have ebbed away following nationalisation.
And it's remarkable how many apologists there are for it.
Apart from footbridge crossing there appears to be some humours on the closure the back entrance/reducing its hours. I cannot count the number of times when using the back entrance allowed me to catch a train from platform 8 that I would have missed otherwise. Which would mean a new ticket.I’m not actually sure why this thread is debating it, it doesn’t affect rail passengers, indeed it only affects a small number of people who live (or have reason to visit) a relatively small number of properties in the vicinity of Guildford Park Avenue. As I said earlier, in the hundreds of times I have needed to get from that area to the town centre, I have never used the route through the station, the alternative is fine. I was cycling over the road bridge as an 11 year old (accepting that perception of safety standards has changed in the intervening few years).
I used to get caught out by this and I just had to start leaving early enough to have enough time to go round to the front entrance still. It's annoying, but separate from the discussion of closing the non-passenger access to the bridge (I would be very much against reducing the hours of the back entrance)Apart from footbridge crossing there appears to be some humours on the closure the back entrance/reducing its hours. I cannot count the number of times when using the back entrance allowed me to catch a train from platform 8 that I would have missed otherwise. Which would mean a new ticket.
It definitely didn’t when discussed earlier in the thread.Do we know if the so-called "Great Wall of Guildford" redevelopment of the station will include a new bridge, and if so will there be non-passenger access to that bridge?
If the actual *law* was changed by Parliament in a very substantial way, and in a way which is unlikely to be compatible with other parts of the law.You could charge a penalty if rules were changed.
I actually said that when the Yorkie Bridge is closed, the route via the station bridge to campus is by far preferable to any other route.I will add my 10 pennyworth, Previous posters have covered most issues.
As already mentioned Students from the main campus can use Yorkies bridge/Walnut tree ave to walk into town.
I'd be interested in knowing this too - Guildford is an NR operated station, even though most of the services are SWR (apart from the few GWR services on the Gatwick--Reading/North Downs route). So are the station staff SWR, NR, GWR, or something else?As an aside, can anyone clarify exactly who all the High Viz wearing staff actually are? As far as I can tell we have SWR platform staff, Revenue protection staff, Welfare staff, BTP, and temporary Agency staff (I am excluding drivers and Guards).
As Surreyman points out the bus stop at the back of the station is always busy with people using it for travel to the university and the hospital. There's a lot of university up beyond the Royal Surrey. Anyone want to walk from the town over the Farnham Road Bridge against a bus load of people coming back from the hospital?