Sadiq Khan says future of Heathrow Express should be ‘reconsidered’ due to Elizabeth line success

Farnborough

Member
Joined
2 Mar 2025
Messages
292
Location
Farnborough
I guess it really does just make sense to build an extra pair of tracks for freight from Acton Wells to Airport Junction, get them out of the way...
And is this before, or after, you've resolved World Peace?

Just where are you planning to put this extra pair of tracks?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,402
Location
Northampton
Thanks for this detailed analysis! This is all very interesting, and it's going to take me a while to digest in full.

My reason for making the Heathrow services the express services and the Maidenhead services the stopping services between Ealing Broadway and Hayes & Harlington was that it prioritises traffic to and from the central core. I'm not sure why you would focus on traffic between the three skipped stations and Heathrow Airport when the majority of passengers are more likely to be concerned about getting into the city centre? On top of that, journeys to and from Heathrow Airport are mostly going to be from city centre stations, so there's more value to speeding up those journeys, even at the cost of making the Hanwell - Heathrow Airport journey require an interchange.
The case for stopping the Maidenhead trains and forcing interchange for Heathrow will be galactically weaker than stopping Heathrow trains and forcing interchange for Maidenhead/Reading. Although in this instance I'm also assuming that HEx isn't going anywhere as the idea that you can re-use the Main Line paths for anything has already been debunked so a fast service will continue.
If HEx was just withdrawn and everybody told to lump it, then I think the case for switching the stops to the Maidenhead would be more equal.
The time penalty for entering and exiting the turnouts looks harsh.
30 seconds is based on plenty of existing examples around the network (and is actually quite generous, given that the difference in turnout speeds will likely require approach control and the need for full-length passenger overlaps). The main penalty for the loops is from standing waiting for the overtake.
I guess it really does just make sense to build an extra pair of tracks for freight from Acton Wells to Airport Junction, get them out of the way, and then run every Elizabeth Line trains all-stops.
"Sense" is being used in quite broad terms here. Although my analysis suggests you'd "only" need the extra tracks from Acton Main Line to Hanwell. Still going to cost multiple Billions, though.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,022
Location
West Wiltshire
I guess it really does just make sense to build an extra pair of tracks for freight from Acton Wells to Airport Junction, get them out of the way, and then run every Elizabeth Line trains all-stops.
Just where are you planning to put this extra pair of tracks?
The volume of freight does not need pair of tracks, one single reversible track over the 9 miles would be more than enough.

Clearly there is no need for station platforms on any extra track, in reality would probably need to bore a tunnel from Acton to West Ealing, and could probably squeeze in one extra track for much of the rest of the distance, although would need to widen Hanwell viaduct, so would probably be easier to build tunnel to Boston Manor then use the formerly double track Brentford branch to Southall with a short dive under tunnel west of Southall.

Although if Heathrow western spur is built some trains might be diverted via airport so section of route near M25 would be less busy
 

squingo44

Member
Joined
5 Jan 2026
Messages
183
Location
London
If HEx was just withdrawn and everybody told to lump it, then I think the case for switching the stops to the Maidenhead would be more equal.
Oh right, I see where you're coming from. I've been assuming in my head that the Heathrow Express is going to be removed and replaced with some form of express commuter service to Reading or beyond.
"Sense" is being used in quite broad terms here. Although my analysis suggests you'd "only" need the extra tracks from Acton Main Line to Hanwell. Still going to cost multiple Billions, though.
Several billions is what something like this is just going to cost. Any alternative to get more EL trains out onto the GWML would be just as, if not more, expensive.
And is this before, or after, you've resolved World Peace?

Just where are you planning to put this extra pair of tracks?
I'd fix the planning system so that it's a lot easier to demolish and rebuild residential buildings to widen nationally significant transport corridors. Pretty much everywhere along the GWML between Acton Main Line and Hanwell could do with being significantly densified anyway.
The volume of freight does not need pair of tracks, one single reversible track over the 9 miles would be more than enough.
Only needing a single extra track would make things a lot easier tbh
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,268
Location
Bath
I'd fix the planning system so that it's a lot easier to demolish and rebuild residential buildings to widen nationally significant transport corridors. Pretty much everywhere along the GWML between Acton Main Line and Hanwell could do with being significantly densified anyway.
And how are you fixing the cost of doing so? Since the Elizabeth Line a ton of flat blocks have been build and house costs in the area have skyrocketed. Short of just declaring you can seize land at will with no compensation how are you affording the land purchase?
 

London Trains

Established Member
Joined
9 Oct 2017
Messages
1,209
And how are you fixing the cost of doing so? Since the Elizabeth Line a ton of flat blocks have been build and house costs in the area have skyrocketed. Short of just declaring you can seize land at will with no compensation how are you affording the land purchase?
Whilst it would still be incredibly expensive (particularly putting a 5th track on Hanwell viaduct), I'm fairly sure a 5th track could be built without much, if any demolition of residental buildings - the only potentially problematic stretch I can see is just east of West Ealing station, between Drayton Green Road and St Leonard's Road.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,607
How well is the existing 5th track used through Iver etc?

It gets to the point in these conversations of growth on that corridor, where a Royal Oak ish fast tunnel to west of Slough, become a more viable discussion. And give over the 4 lines to Heathrow, Elizabeth line, freight and outer semi/slow services, eg the Didcots, maybe the Newbury.

And then some trackwork to enable Elizabeth to Fast line crossings better.

And the 2 Oxford, 1 Cheltenham, 2 Bristol, 2 Wales, 2 West (should be) - and maybe more, run fast in tunnel (to the joy of many who hate the OOC stop idea) ... no more peak fasts to Twyford/Maidenhead either.

enabling a mass expansion of Elizabeth line west of OOC frequency, fast line services (e.g. Ealing and Hayes only?) - more fast to Slough and beyond, and the end of HEx. Slough station might need work as more of an outer terminal, before other services rejoin and things shift from fasts to slows to accommodate the tunnelled services back on the fasts.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,269
If you could have a fifth freight dedicated track you can turn the reliefs over to Elizabeth line full time and then run the mains 15+tph running Paddington, Old Oak Common, Reading and onwards.

A single track freight tunnel is probably cheaper than a twin track high speed tunnel that carries trains with hundreds of passengers aboard and thus needs far more sophisticated safety arrangements.

I dont think a new passenger tunnel makes sense unless we are actually going for a west-facing high speed railway.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
It is an interesting discussion but are any of the ideas about grandiose capacity enhancement on the lines out of Paddington genuinely a better spend from a very finite funding source than infrastructure improvements elsewhere in London?

It seems that none of those big projects (eg Bakerloo Line extension, Crossrail 2, Croydon remodelling, Euston rebuild etc) are likely to happen, so what chance building anything to make space for more passenger trains on the west side of London.

Even a more minor intervention to move some of the passenger demand at Twyford and Maidenhead back to Wokingham and Bracknell is unlikely.

Where does Elizabeth Line westbound capacity enhancement sit? Moreover, is it actually desirable to have Shenfield trains going further west than Old Oak Common, noting that 15 years from now they will have a larger customer base with HS2 connections.
 

Chriso

Member
Joined
7 Dec 2006
Messages
526
At Paddington the Heathrow express seems to do pretty well and is punctual and reliable compared to the lizzie line . Until the Elizabeth line is actually reliable the express should stay.

I work with lots of people infuriated by the unreliable service, even tonight I heard at Paddington that anyone for Heathrow should take this service as there wasn’t another one for 40 minutes!!!!!
 

AlexSJW

On Moderation
Joined
3 Feb 2026
Messages
192
Location
London
Poor old Heathrow Express always seems to get a knock on here. I know in a way it eats up GWML paths but it’s still pretty popular and well liked by the more elite that use it along with being an asset for Heathrow Airport Holdings.
I take the Elizabeth Line to Heathrow now. The now redundant Heathrow Express would release paths for other services for sure.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,798
Location
East Anglia
I take the Elizabeth Line to Heathrow now. The now redundant Heathrow Express would release paths for other services for sure.
Ironically it’s still quite well used. I can’t see it ending any time soon.
 

RUK

Member
Joined
5 Aug 2009
Messages
408
Location
East of England
If the Elizabeth Line does replace Heathrow Express, will TfL need an extra order of Class 345s for the extra services to replace the units currently used for Heathrow Express? Would that be more than the 3 options in their original contract which haven’t yet been taken up, since they’d be replacing the 12 units currently used for Heathrow Express, which couldn’t be used, since they wouldn’t have door spacing compatible with the platform edge doors used in the core?
 

Korot

Member
Joined
16 Dec 2018
Messages
11
Heathrow Express' current units are only ~80m long, while 1 Clss 345 is 200m long, so they won't be a 1-for-1 replacement anyway.
There are currently 10 extra 345s under construction, intended for more trains through the core + extending the current Paddington-terminators to OOC when it opens, but there might be slack in there to extend some of those Pad/OOC-terminators to Heathrow.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,581
Location
UK
Heathrow Express' current units are only ~80m long, while 1 Clss 345 is 200m long, so they won't be a 1-for-1 replacement anyway.
There are currently 10 extra 345s under construction, intended for more trains through the core + extending the current Paddington-terminators to OOC when it opens, but there might be slack in there to extend some of those Pad/OOC-terminators to Heathrow.
OOC to Heathrow T4 or T5 is 30 mins. So ignoring the turnround time (which would likely be similar whether the train terminates at Heathrow or OOC) each additional unit would allow for roughly one additional train per hour. So doubling the T5 service to 4tph would require an additional two units.

Very roughly speaking, extending all the current Paddington terminators to OOC would take an additional 3 units in the high peak (where 12tph terminate there). That's based on a journey time of around 7 minutes, using the interpolated timings on RTT for Old Oak Common West.

So all else being equal, that would still leave 4 of the additional 10 units left to increase the core frequency, if we assume 1 is needed to cover for maintenance on the additional 10 based on a typical EMU availability rate of 90%.
 

MPW

Member
Joined
2 Dec 2021
Messages
265
Location
Orpington
OOC to Heathrow T4 or T5 is 30 mins. So ignoring the turnround time (which would likely be similar whether the train terminates at Heathrow or OOC) each additional unit would allow for roughly one additional train per hour. So doubling the T5 service to 4tph would require an additional two units.

Very roughly speaking, extending all the current Paddington terminators to OOC would take an additional 3 units in the high peak (where 12tph terminate there). That's based on a journey time of around 7 minutes, using the interpolated timings on RTT for Old Oak Common West.

So all else being equal, that would still leave 4 of the additional 10 units left to increase the core frequency, if we assume 1 is needed to cover for maintenance on the additional 10 based on a typical EMU availability rate of 90%.
If EL takes over HEX wouldn't that be on the fast lines and therefore OOC to Heathrow should be less than the 15 minutes current paddington to Heathrow HEX service?
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,581
Location
UK
If EL takes over HEX wouldn't that be on the fast lines and therefore OOC to Heathrow should be less than the 15 minutes current paddington to Heathrow HEX service?
Ok yes, I wasn't sure exactly what @Korot was referring to. If it was running the Hex services, that is currently done with 5 (pairs of) units most of the time, with short turnarounds at Paddington reducing that to 4 units at certain times of day to allow for unit swaps to/from Reading depot.

So if they stuck with longer turnrounds it would account for 5 of the 10 units ordered. Personally speaking I'm not convinced that Khan's proposal is really for TfL to take over the Heathrow Express, but stranger things have happened.
 

squingo44

Member
Joined
5 Jan 2026
Messages
183
Location
London
If EL takes over HEX wouldn't that be on the fast lines and therefore OOC to Heathrow should be less than the 15 minutes current paddington to Heathrow HEX service?
I imagine it would be more likely that they recast the timetable to fit more EL paths on the relief lines. Crossing the EL trains onto the main lines would create a lot of conflicting moves, reducing capacity a lot.

Tbh any way you slice it, if the Elizabeth line takes over HEx then some form of infrastructure intervention will be needed.
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,828
I imagine it would be more likely that they recast the timetable to fit more EL paths on the relief lines. Crossing the EL trains onto the main lines would create a lot of conflicting moves, reducing capacity a lot.

Tbh any way you slice it, if the Elizabeth line takes over HEx then some form of infrastructure intervention will be needed.
Also trying to stick 90mph Class 345s on the fasts replacing the current 110mph 387s is going to make a mess.
 

Korot

Member
Joined
16 Dec 2018
Messages
11
In understand the Hex -> Crossrail replacement to be a bye-bye to the 'express' part: Heathrow express no longer runs, freeing up paths on the fasts/mains.
Instead, Crossrail trains are extended along the slow/relief lines to keep up capacity to Heathrow, even if at a slower journey time (because slower max speed, but also because more stops).
The questions is if there is capacity on those reliefs between Airport Junction & OOC for those extra paths.
 

squingo44

Member
Joined
5 Jan 2026
Messages
183
Location
London
In understand the Hex -> Crossrail replacement to be a bye-bye to the 'express' part: Heathrow express no longer runs, freeing up paths on the fasts/mains.
Instead, Crossrail trains are extended along the slow/relief lines to keep up capacity to Heathrow, even if at a slower journey time (because slower max speed, but also because more stops).
The questions is if there is capacity on those reliefs between Airport Junction & OOC for those extra paths.
There isn't, something would need to be done. The best solution is probably a 5th track between Acton Yard and Airport Junction, which would require a significant widening of the GWML corridor.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,269
The 5th track would be something of the order of 13km long, looks like quite a bit of stuff in the way, especially the multi story car park west of Ealing Broadway.

I suppose if you could arrange a single track flyover at Old Oak onto the New North Main Line you could avoid some stuff by running freight around via Drayton Green, but thats still several kilometres from Airport Junction.

The potential gains are enormous though, it would allow the current reliefs to go over to Elizabeth Line full time (at least inside of the Airport), and the mains (and Paddington trainshed) to be dedicated to 125mph non stop trains from Old Oak to Reading.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
The potential gains are enormous though, it would allow the current reliefs to go over to Elizabeth Line full time, and the mains (and Paddington trainshed) to be dedicated to 125mph non stop trains from Old Oak to Reading.
What service would Maidenhead and Twyford be getting in that case?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,269
What service would Maidenhead and Twyford be getting in that case?
Most likely an enhanced Elizabeth Line service. As far as I can tell the bulk of trains calling at Twyford are on the same platforms whether they are Elizabeth line or Great Western, realtimetrains suggests only one train a day calls at the eastbound fast line platform.

Maidenhead is less extreme, but similar.

But that is rather peripheral to the topic of the thread, although it is probably the best way to enable a high frequency Heathrow service.
 

squingo44

Member
Joined
5 Jan 2026
Messages
183
Location
London
It would be good to build a grade-separated crossover between the relief and main lines between the eastern and (future) western heathrow airport junctions, so that outer commuter services to Twyford, Reading, and Didcot can use the main lines to Paddington at the same time as services from Reading go to Heathrow on the main lines.

== Doublepost prevention - post automatically merged: ==

The 5th track would be something of the order of 13km long, looks like quite a bit of stuff in the way, especially the multi story car park west of Ealing Broadway.

I suppose if you could arrange a single track flyover at Old Oak onto the New North Main Line you could avoid some stuff by running freight around via Drayton Green, but thats still several kilometres from Airport Junction.

The potential gains are enormous though, it would allow the current reliefs to go over to Elizabeth Line full time (at least inside of the Airport), and the mains (and Paddington trainshed) to be dedicated to 125mph non stop trains from Old Oak to Reading.
If you knock down the car park, and completely rebuild Ealing Broadway station, it looks to me like you'd just about get away with a 5th track all the way to Airport junction by taking commercial land or people's gardens. Sounds eminently reasonable to me.
 
Last edited:

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,264
Most likely an enhanced Elizabeth Line service. As far as I can tell the bulk of trains calling at Twyford are on the same platforms whether they are Elizabeth line or Great Western, realtimetrains suggests only one train a day calls at the eastbound fast line platform.

Maidenhead is less extreme, but similar.

But that is rather peripheral to the topic of the thread, although it is probably the best way to enable a high frequency Heathrow service.
Yes, and no. Dedicating the reliefs to the Elizabeth Line and running more trains to Heathrow would suggest having all services calling all stations east of Airport Junction. That would slow services for the outer stations towards Reading which would be detimental for Maidenhead and Twyford.
 

squingo44

Member
Joined
5 Jan 2026
Messages
183
Location
London
Yes, and no. Dedicating the reliefs to the Elizabeth Line and running more trains to Heathrow would suggest having all services calling all stations east of Airport Junction. That would slow services for the outer stations towards Reading which would be detimental for Maidenhead and Twyford.
Which is why Maidenhead and Twyford should get express commuter services crossing over the to the main line into Paddington - there would be no need to do anything other than an all-stops pattern on the Elizabeth line.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,269
Yes, and no. Dedicating the reliefs to the Elizabeth Line and running more trains to Heathrow would suggest having all services calling all stations east of Airport Junction. That would slow services for the outer stations towards Reading which would be detimental for Maidenhead and Twyford.
Somewhat detrimental, yes, although it could probably be mitigated through increased frequency. Assuming eight trains per hour go to the airport, you'd have eight trains per hour off-peak and 16 trains per hour peak-time to serve the stations outside the airport junction.

EDIT:

Impacts to Twyford could also be mitigated by allowing a double back via Reading; If a high intensity fast line service was implemented, you'd have 23-24 minute Reading-London Paddington trains running every three or so minutes, suggesting that someone from Twyford could:
8 minutes Twyford-Reading
5 minutes change platform time at Reading
3 minute waiting for at rain at Reading
23 minutes Reading-London

39 minutes journey time, only four minutes slower than today.
 
Last edited:

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,512
Location
West London
If you knock down the car park, and completely rebuild Ealing Broadway station, it looks to me like you'd just about get away with a 5th track all the way to Airport junction by taking commercial land or people's gardens. Sounds eminently reasonable to me.
And Wharncliffe viaduct?
 