• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future of the 350/2s

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,047
Location
West Wiltshire
Please remind me why they would be no good for theWigan NW to Stalybridge route?
They don't have quick door opening cycle, so much better suited to longer semi-fast services with fewer station calls, than ones with closely spaced stations where doors open every 2-3 minutes
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,047
Location
West Wiltshire
Does this mean a reshuffle, with 331s being moved to routes like Hadfield and Wigan, or will some 323s be retained?
Presumably if talking late next year, they mean by December 2027 timetable change.

Weren't some more sections of new electrification supposed to be switched on by then, which presumably allows some services to switch from diesel, so going to have to be some sort of cascade of stock anyway. I don't know which months various electrification switch ons occur.
 

Transilien

Member
Joined
10 Mar 2024
Messages
729
Location
Ayrshire
Presumably if talking late next year, they mean by December 2027 timetable change.

Weren't some more sections of new electrification supposed to be switched on by then, which presumably allows some services to switch from diesel, so going to have to be some sort of cascade of stock anyway.
IMO, it would be better if more 150s were replaced before the 323s
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,237
They don't have quick door opening cycle, so much better suited to longer semi-fast services with fewer station calls, than ones with closely spaced stations where doors open every 2-3 minutes
Yes, weird how slow the doors are to open, when the doors on other plug door fitted stock are so much faster. But decent trains.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,667
Location
Selby
IMO, it would be better if more 150s were replaced before the 323s
Replacing the 150s with 350s might be mathematically more satisfying but they wouldn't get very far on those routes. Yes, the 150s do urgently need to be replaced but there isn't a surplus of DMUs available. The 350s are available to replace the 323s without going through any new build process, so it would be churlish to turn them down just because the 150s can't be replaced in the same timescale.
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,416
Location
Birmingham
As a cross city local, to hear that 323s are finishing all together now is incredibly sad. But... The 350/2s will be very much a welcome improvement for the people of the North West and I'm glad they being put back into use, as let's face... With a good needed refurbishment they are actually very good units.

Looks like I need to get up to Manchester and North West Sharpish to get some rides on the old friends before they go.
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
755
Location
Warrington
Internal brief just gone out confirming Class 350s replacing 323s at Northern. Expected late next year with use on the South Manchester routes
Excellent news, looking forward to using them!

Does "Expected late next year" mean they'll enter service or be in full service by then? If the former, why does it take 18 months to introduce trains that are not awaiting to be cascaded? Are they planning on repainting/refurbing them before introduction perhaps?
 

absolutelymilk

Established Member
Joined
18 Jul 2015
Messages
1,587
Chime Whistle Publishing on X
Northern has received government approval to replace its class 323s with 37 Porterbrook owned class 350s. The fleet will receive a £25M refurb and the first five will enter service late next year.
Apparently the 34 Class 323s will be replaced with 37 Class 350s. Given that 350s are a bit longer and there will be a few more of them, that means a reasonable increase in capacity.
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,416
Location
Birmingham
Excellent news, looking forward to using them!

Does "Expected late next year" mean they'll enter service or be in full service by then? If the former, why does it take 18 months to introduce trains that are not awaiting to be cascaded? Are they planning on repainting/refurbing them before introduction perhaps?
first 5 come into service late next year. they need to be refurbished first and crew training to take place as Northern haven't operate them before.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,991
Location
Surrey
first 5 come into service late next year. they need to be refurbished first and crew training to take place as Northern haven't operate them before.
Seems a long period but given anything that gets stored aka 175s these days appears to suffer many problems when they put them back in traffic best be cautious.

I wonder how much this was being pushed by Andy Burnham as mayor to get more capacity and hes just been able to get it pushed through now in advance of the Manchester Mayoral election
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
755
Location
Warrington
Chime Whistle Publishing on X

Apparently the 34 Class 323s will be replaced with 37 Class 350s. Given that 350s are a bit longer and there will be a few more of them, that means a reasonable increase in capacity.
first 5 come into service late next year. they need to be refurbished first and crew training to take place as Northern haven't operate them before.
Excellent, thanks both! It'll be interesting to hear what the refurb entails eventually.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,402
Location
Taunton or Kent
Chime Whistle Publishing on X

Apparently the 34 Class 323s will be replaced with 37 Class 350s. Given that 350s are a bit longer and there will be a few more of them, that means a reasonable increase in capacity.
They are longer but only by 10m a unit, because 350s are 20m carriages while 323s are 22.8m. I also recall seeing that the seating capacity is not actually higher on 350/2s vs 323s. However, a refurbishment could sort this out depending on the needs of the routes they are going onto.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,047
Location
West Wiltshire
They are longer but only by 10m a unit, because 350s are 20m carriages while 323s are 22.8m. I also recall seeing that the seating capacity is not actually higher on 350/2s vs 323s. However, a refurbishment could sort this out depending on the needs of the routes they are going onto.
The 323s are 70.2m long, 350s are 81.36m, so nearer 11.2m longer

323s are rated at 1168kw (1566HP), 350s are 2000kw (2680HP), so have 171% of the 323 power rating, although they are geared for 20mph higher speeds. So 350s should accelerate faster (even if door opening is slower than a 323)

How the seating capacity might change during a refurb, (and they will be around 18-19 years old at refurb date in late 2027, so close to expected mid life) is not known yet.
 
Last edited:

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,130
Location
Atherton, UK
Does this mean a reshuffle, with 331s being moved to routes like Hadfield and Wigan, or will some 323s be retained?
331s are equally as slow with door release- 331018 was on the Hadfield line one night this week and the journey I took lost 2 minutes across it due to the slower release cycle.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
I'm guessing Stoke stoppers won't get the 350/2s due to the door opening and closing cycles.

331s do quite well at keeping to 323 timings to be fair, not sure how good of a job a 350/2 would do.

Whatever happens though it means the end of Northern services using P3 at stoke and Northern don't use P3 when 331s operate stoke stoppers.

The lack of 331 spare parts helps to explain why so many stoke services were operated by 331s yesterday.
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,416
Location
Birmingham
The lack of 331 spare parts helps to explain why so many stoke services were operated by 331s yesterday.
I recall someone at soho referred to the 323 fleet as one a kind and lot of the parts are obsolete for many years. So the timing to get rid of them now before they get older and more obsolete makes complete sense.

It's a full credit to the teams at Allerton (and soho) for keeping them running in top condition for so long.
 

Anvil1984

Established Member
Joined
28 Aug 2010
Messages
1,513
So forum members dreaming of batteries and the west of England line can probably now give up?

Do the Class 323s have more room for batteries underneath for use on the Morpeth and Northumberland Line (entering the future 1001 potential uses for a class 323 contest )
 

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,836
Location
Rugby
Now the new home is confirmed we can bring this thread to a close

 
Status
Not open for further replies.

Top