Transpennine Route Upgrade and Electrification updates

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,453
Location
Preston Lancs
Indeed the independent feeder pokes out above ground at Ordsall Lane substation (very strategically located by how many lines fan away from that small area). But my query is whether Heyrod now directly connects to OLE at the Stalybridge end (by way of additional shorter cables) as well as the by way of Ordsall Lane. But perhaps this will only come about when wiring goes further than Stalybridge.
To my knowledge no. I think since it is planned to wire W2B and W2C it will happen then.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,055
Just on the TRU engineering works website and am a little (almost pleasantly) surprised that nothing is happening on the August Bank Holiday weekend. Maybe I've spoken/written too soon (!)
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
Railway code "GFL" is on new TRU OHLE masts between Huddersfield and Leeds.
Does it denote Greenfield to Leeds? It's the only logical link on the route I can think of.

The distance is based on zero km from Manchester Victoria, which is also where NR's North East route meets the North West route.

Any other ideas?

Another oddity I noticed today is that the masts between Neville Hill and Micklefield are plated HUL with the km measured from Hull (ie descending eastwards).
 

1D53

Established Member
Joined
2 Apr 2006
Messages
2,884
Just on the TRU engineering works website and am a little (almost pleasantly) surprised that nothing is happening on the August Bank Holiday weekend. Maybe I've spoken/written too soon (!)
Significant numbers travelling to Leeds Festival and other events. Leeds Fest is also a substantial drain on the bus hire market which would mean RRB would be difficult to recruit.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,586
Location
Nottingham
Railway code "GFL".
Although HUL is the Engineers' Line Reference as mentioned, the ELRs for the route via Huddersfield re MVL (presumably Manchester Victoria to Leeds) and MVN (Manchester Victoria to Normanton for the ex-L&Y section through Mirfield), both with number suffixes.

As far as I can see on railwaycodes.org.uk, GFL is not an ELR for anywhere, nor does it fit with the old system for OLE numbering which assigned codes starting with G to any route that branched ultimately off the WCML.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,055
Significant numbers travelling to Leeds Festival and other events. Leeds Fest is also a substantial drain on the bus hire market which would mean RRB would be difficult to recruit.

Normally a bank holiday weekend is an excuse to put on buses!
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
Latest excellent Youtube Videos from On track with Tim and Sarah bell show progress on the baker viaduct and bridges in that area.
Not much activity at Whitacre bridge Deighton.
Leeds Road and Calder road bridges still undergoing utility diversions.
Colne bridge looks well on and should open 17th July. Didn't note any lighting.

Baker viaduct 2 girders protruding over the river so only one span left to complete end to end. I don't know much about cortan steel but the latest girders look quite grey compared with previous.
K
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Latest excellent Youtube Videos from On track with Tim and Sarah bell show progress on the baker viaduct and bridges in that area.
Not much activity at Whitacre bridge Deighton.
Leeds Road and Colne bridge still undergoing utility diversions.
Calder bridge looks well on and should open 17th July. Didn't note any lighting.
Isn’t Colne Bridge Road bridge the one getting its final tarmac laid and is almost complete?
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,300
I believe it rusts over time, but unlike other steels the rust stays in place and prevents further rusting.
The wikipedia page https://en.wikipedia.org/wiki/Weathering_steel is good:
the steel forms a protective layer on its surface under the influence of the weather.

The corrosion-retarding effect of the protective layer is produced by the particular distribution and concentration of alloying elements in it. It is not yet clear how exactly the patina formation differs from usual rusting, but it's established that drying of the wetted surface is necessary and that copper is the most important alloying element.[5]

The layer protecting the surface develops and regenerates continuously when subjected to the influence of the weather. In other words, the steel is allowed to rust in order to form the protective coating.
I believe that some poor copies were made in the former Eastern Bloc, and that the corrosive polluted atmosphere there has led to some serious problems. US examples are mentioned under "disadvantages" in the Wikipedia page.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,207
Location
Oxford
HS2 are using loads of it, it's the currently popular material for constructing things out of metal.
 

chrisjackson

Member
Joined
4 Apr 2023
Messages
6
Location
ws14 0nj
I believe it rusts over time, but unlike other steels the rust stays in place and prevents further rusting.
The grey is how it looks fresh out the factory. As soon as it gets any rain on it the colour will change. There just isn't much rain around at the moment!
 

gledhill56

Member
Joined
12 Nov 2007
Messages
95
Colne Bridge Road is reopen, drove over it an hour ago on my way home from work albeit with a 20mph restriction as the resurfacing isn’t fully completed but presumably it needed to be reopened to allow the Leeds Road bridge to be closed this weekend.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
6,055
Colne Bridge Road is reopen, drove over it an hour ago on my way home from work albeit with a 20mph restriction as the resurfacing isn’t fully completed but presumably it needed to be reopened to allow the Leeds Road bridge to be closed this weekend.

What?? You mean they'll shut only one bridge at a time?! :D seems awfully logical for the UK!
 

david_g

Member
Joined
16 Mar 2013
Messages
125
Location
Warwickshire
Sleepers are down for what will be the up fast for about a mile from the end of Huddersfield viaduct towards Deighton and the track bed is ready for sleepers most of the way to Deighton.

As far as I could see all the frames for the canopy extension at the Leeds end of Huddersfield station are in place and they are filling in between the platform faces of what will be platforms 5&6.

Progress seems so rapid that this will be out of date by tomorrow.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,856
Location
west yorkshire
Sleepers are down for what will be the up fast for about a mile from the end of Huddersfield viaduct towards Deighton and the track bed is ready for sleepers most of the way to Deighton.
As far as I could see all the frames for the canopy extension at the Leeds end of Huddersfield station are in place and they are filling in between the platform faces of what will be platforms 5&6.
Progress seems so rapid that this will be out of date by tomorrow.
Impressive progress indeed mostly shown on YouTube "On track with Tim"

New railway sleepers have now been positioned through the Hillhouse area, marking another significant milestone in the Transpennine Route Upgrade as preparations continue for the new fast lines into Huddersfield Station. In this week’s construction update, we trace the progress of the new track infrastructure around Hillhouse Depot, examine developments at Fieldhouse Lane Bridge, explore the latest work on the station’s subway extension, and take a closer look at the remarkable transformation taking place across Huddersfield Station. There has also been significant progress on the station roof refurbishment, the sawtooth footbridge, lift shafts, and preparations for the future island platforms. With September’s Gledholt Tunnel blockade approaching, work is steadily advancing towards the next major phase of the project. If you enjoy regular engineering updates from across the Transpennine Route Upgrade, consider subscribing for weekly construction progress and exclusive aerial views of one of Britain’s biggest railway infrastructure projects. Locations featured
  • Huddersfield Station
  • Hillhouse Depot
  • Fieldhouse Lane Bridge
Chapters 00:00 Introduction & Latest Progress 02:20 Railway Sleepers Progress Through Hillhouse 06:35 Hillhouse Depot & Fieldhouse Lane Bridge 08:45 Huddersfield Station Transformation & Subway Extension 11:20 Roof Refurbishment & What’s Next

Anyone know the date for installation of the new track layout at Huddersfield?

K
 
Last edited by a moderator:

neil65

Member
Joined
15 Jul 2022
Messages
510
Location
Huddersfield, Kirklees, United Kingdom
Impressive progress indeed mostly shown on YouTube "On track with Tim"



Anyone know the date for installation of the new track layout at Huddersfield?

K

I would imagine everything will be joined up in the Xmas 2026 to Jan/Feb 2027 full possession

== Doublepost prevention - post automatically merged: ==

No photos but looks like work on the new cutting at Heaton lodge seems to be picking up, lots going on including what at looked like a membrane covering being installed on the cutting sides when I passed on Wednesday 15th
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
We are largely moving into
I would imagine everything will be joined up in the Xmas 2026 to Jan/Feb 2027 full possession

== Doublepost prevention - post automatically merged: ==

No photos but looks like work on the new cutting at Heaton lodge seems to be picking up, lots going on including what at looked like a membrane covering being installed on the cutting sides when I passed on Wednesday 15th
Cutting has been largely complete for a good while awaiting track works. The gas diversion at the Leeds end was taking some time, unsurprisingly.
 

david_g

Member
Joined
16 Mar 2013
Messages
125
Location
Warwickshire
And they were rolling out what appeared to be artificial grass mats on one slope at Heaton Lodge yesterday. Has anyone else spotted this, is that what it really was or did my eyes deceive me?
 