PLY2AYS
Member
There’s no connection there at all now, points lead North toward the site and the railhead stops at the gated entrance. Fairly certain they’d need to lay a whole new siding down inside the worksite if they wanted to reinstate it.Yes
And yes.
Absolutely no room to fit any freight of useful size after those points before the gate either; not without taking up all of West Ruislip station and the loop anyway.