Cross-country overcrowding: what could be done?

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,056
Presumably/hopefully/maybe GBR will sort out all these 'idiosyncracies' with some kind of 'standardisation'. Perhaps the customer will come first? Running trains half locked out with passengers standing and stops being omitted- what kind of 'service' is that?
The customer is a distant third while the Treasury and Unions fight over the comb.

Running full and standing with half the train locked up is just another bargaining chip, like when when they threaten to disrupt the Olympics or some other major sporting event unless they are bought off with a special payment. Meanwhile the spare 221s continue to accumulate rust.

In South London, trains run with 3 non-corridor units and just a driver in the front.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,130
Location
London
It’s such a shame that the 222s were sent to Scotrail rather than a few to XC.

For the umpteenth time, the 222s are not 'sent' to ScotRail. ScotRail made a commercial offer on a fleet of trains that were coming off lease.

All those 'if only' posts about 222s reveal an unhealthy attitude that Scotland should be subordinate to English needs.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,028
My record was Leicester to Cambridge which hurt like hell.

Also for those saying XC won’t order new trains: isn’t it the case that DfT are strong arming and stopping this happening?

Although as I've previously said a mixed 80x fleet of 5 and 9 coach trains giving a circa 30% uplift in capacity whilst not actually needing any extra coaches over the current fleet size (let alone adding the in store 221's).
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,390
Location
Lichfield
For the umpteenth time, the 222s are not 'sent' to ScotRail. ScotRail made a commercial offer on a fleet of trains that were coming off lease.

It's clear what was meant though.

All those 'if only' posts about 222s reveal an unhealthy attitude that Scotland should be subordinate to English needs.

I don't see that at all, I see XC as a cross border Intercity TOC that could be transformed if it was given the 222s, that would be beneficial to all of mainland UK.
 
Joined
8 Jul 2014
Messages
393
What sort of timeframe are we looking at to hear weather it's been successful or not?
Anything the DfT have to agree on can take an absolute age. I thought it would have been wrapped up by now, but it’s all gone quiet. I personally don’t see what the issue is. XC need rolling stock, said rolling stock is stored and ready to go (pending a spruce up)…
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,365
Anything the DfT have to agree on can take an absolute age. I thought it would have been wrapped up by now, but it’s all gone quiet. I personally don’t see what the issue is. XC need rolling stock, said rolling stock is stored and ready to go (pending a spruce up)…
There's a change of PM underway, and no one is going to take ownership of a decision involving spending money until they know which way the politics will lie. Meanwhile, HM Treasury will continue to do what they always do, and procrastinate, procrastinate, procrastinate rather than commit to spending money.

Which is also, incidentally, why the 222s weren't able to stay with EMR until the 810s arrived.
 

Bikeman78

Established Member
Joined
26 Apr 2018
Messages
6,171
Correct. 221101-221106 stored at Litchurch Lane. XC still awaiting outcome of the business case put to the DfT to acquire these units.
At the risk of pouring petrol onto the fire, there is no point leasing extra units until they sort the problem of running pairs of units with one locked out of use. All that will happen is more units locked out of use. How is that helpful to anyone?
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,130
Location
London
It's clear what was meant though.

The language and tone are problematic

I don't see that at all, I see XC as a cross border Intercity TOC that could be transformed if it was given the 222s, that would be beneficial to all of mainland UK.

A DfT TOC (/operating unit, or whatever you call it) and ScotRail are equal players in a rule-based market. The only thing that should matter are who gets their house in order first.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,436
Location
Sheffield
Anything the DfT have to agree on can take an absolute age. I thought it would have been wrapped up by now, but it’s all gone quiet. I personally don’t see what the issue is. XC need rolling stock, said rolling stock is stored and ready to go (pending a spruce up)…
Almost certainly it's down to money.

It's certain to cost XC more to lease and run the extra units.

It's certain they won't immediately generate sufficient extra fare income to cover those costs.

Is the inevitable extra subsidy a priority for a cash strapped government? Is their a realistic prospect that increased income could be attracted to cover those costs in the foreseeable future?

Letting those units stand idle when they're badly needed seems nonsensical, until you start doing the sums! If pushed the DfT is very likely to be effectively instructed by HM Treasury to say NO. As it may for new trains for other operators.
 

Tetragon213

Member
Joined
14 Oct 2024
Messages
675
Location
West Midlands
Regarding staffing, if the problem is to do with not being able to get between the units, short term I see no reason why the middle coaches of the stored sets couldn't be cannibalised and added to the XC diagrams with the worst overcrowding, turning 4 coach units into 5 or 6 coach units to at least reduce some of the pressure on the passengers while still allowing staff to travel throughout the whole length of the train.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,181
Location
Bolton
Thank you all.

== Doublepost prevention - post automatically merged: ==

At the risk of pouring petrol onto the fire, there is no point leasing extra units until they sort the problem of running pairs of units with one locked out of use. All that will happen is more units locked out of use. How is that helpful to anyone?
Technically a four car diagram could be retired and a five car one added in its place, this would shift the balance and be easy enough to implement. But obviously, practically, while that does make a difference, it's very small, and there are few four car diagrams that don't do any coupling anymore.
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,528
Location
Derby
Regarding staffing, if the problem is to do with not being able to get between the units, short term I see no reason why the middle coaches of the stored sets couldn't be cannibalised and added to the XC diagrams with the worst overcrowding, turning 4 coach units into 5 or 6 coach units to at least reduce some of the pressure on the passengers while still allowing staff to travel throughout the whole length of the train.
But would those longer units then fit in all the platforms they are required to? Say Reading where they use bay platforms. New Street where there may be a second train in the platform etc. Does a mini fleet then cause diagramming issues, meaning less flexibility?

== Doublepost prevention - post automatically merged: ==

I see a solution would be a nice new fleet of bimode 8 car trains.. but the DfT won't do that. The DfT may indeed consider allowing XC to run more units. Like when the franchise is taken in house. Then they can claim an improvement, indeed one that they wouldn't allow XC to do earlier.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,390
Location
Lichfield
A DfT TOC (/operating unit, or whatever you call it) and ScotRail are equal players in a rule-based market. The only thing that should matter are who gets their house in order first.

I agree, but it's my opinion that the 222 fleet would be of greater benefit overall to XC.

Going back to your original point, please highlight where the "unhealthy attitude that Scotland should be subordinate to English needs" is?
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,225
Location
Oxford
I agree, but it's my opinion that the 222 fleet would be of greater benefit overall to XC.

Going back to your original point, please highlight where the "unhealthy attitude that Scotland should be subordinate to English needs" is?
I'm sure XC could have used them, but ScotRail took the lease for a reason, too.
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,525
Location
Wales
Although as I've previously said a mixed 80x fleet of 5 and 9 coach trains giving a circa 30% uplift in capacity whilst not actually needing any extra coaches over the current fleet size (let alone adding the in store 221's).
I'd still prefer a standard fleet of seven car 80x, which I feel is a better compromise between flexibility (platform usage) and capacity (still a boost over an 8 car 22x without the issues caused by pairing non-gangwayed units).

Say Reading where they use bay platforms.
They don't use them for most of the day, even with diagrams that technically fit.

New Street where there may be a second train in the platform etc.
XC already sent plenty of 8/9 coach sets into New Street. I doubt that the remaining single diagrams being a coach longer would be an issue.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,390
Location
Lichfield
I'm sure XC could have used them, but ScotRail took the lease for a reason, too.

I know, I'm not saying the reason for ScotRail taking them is wrong, my point is that if XC had taken them, the benefits would be felt across the whole of mainland UK, not just Scotland.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,663
Location
Selby
But would those longer units then fit in all the platforms they are required to? Say Reading where they use bay platforms. New Street where there may be a second train in the platform etc. Does a mini fleet then cause diagramming issues, meaning less flexibility?
If we're only talking about cannibalising sets that currently run as twin units to remove the middle power cars and reform them from 4+4 into a 6-car set then there won't be any problems with the formations being too long because they'll be shorter than the formations that are already running. There aren't enough sets in the fleet to have them all as 6/7-car sets and still run the full timetable (even without the Newcastle to Reading services), many would still be 4/5-car sets. At Reading, the majority of services use the through platforms that can accommodate full length trains, it's only a minority that use platform 3 and I don't know how much that is because they need to and how much it's just because it's a convenient place to dump a terminating 4/5-car set and it's better to keep as many through platforms free as possible – if XCountry were running 6+-car sets on all services, would that actually put too much pressure on the through platforms at Reading, or would they cope just fine? There are 9 through platforms, to accommodate 11tph GWR services in each direction, which shouldn't usually need more than 4 platforms, Elizabeth Line, which needs 1 platform off-peak and 2 in the peaks, plus whatever XCountry are running.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,902
Location
North
I read somewhere on this forum that GWR have a surplus of 5-car 800/0 trains. Six out of thirty five would be very useful to relieve overcrowding on Edinburgh-Bristol or Manchester-Bristol where they could run on OHLE for half of the time replacing six 220/221 units for strengthening other XC services
Moorthorpe-Sheffield/Doncaster-Swinton electrification is a priority for SYCA for Leeds-Sheffield fast and Adwick-Sheffield stoppers to covert to electric units. This would allow XC to operate on electric as far south as Sheffield using 800s.
If MML electrification was to restart southwards from Sheffield to Derby then Edinburgh-Bristol services could run as far south as Derby on electric. That would allow two MML and two XC services each way per hour between Sheffield and Derby operating on electric.
West Midlands intends to electrify all lines Kings Norton to Barnt Green so this will allow Manchester-Bristol services to operate on electric between Manchester and Bromsgrove.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,668
Location
West Riding
I read somewhere on this forum that GWR have a surplus of 5-car 800/0 trains. Six out of thirty five would be very useful to relieve overcrowding on Edinburgh-Bristol or Manchester-Bristol where they could run on OHLE for half of the time replacing six 220/221 units for strengthening other XC services
Moorthorpe-Sheffield/Doncaster-Swinton electrification is a priority for SYCA for Leeds-Sheffield fast and Adwick-Sheffield stoppers to covert to electric units. This would allow XC to operate on electric as far south as Sheffield using 800s.
If MML electrification was to restart southwards from Sheffield to Derby then Edinburgh-Bristol services could run as far south as Derby on electric. That would allow two MML and two XC services each way per hour between Sheffield and Derby operating on electric.
West Midlands intends to electrify all lines Kings Norton to Barnt Green so this will allow Manchester-Bristol services to operate on electric between Manchester and Bromsgrove.
Wouldn’t it be better if any GWR units were used, that they just do Bristol to the South West as shuttles to reduce operational complexity. This could release some Voyagers for strengthening. Doing that along with XC picking up the spare Voyager Units would probably solve most problems on the Voyager routes. To take it a step further spare 350’s could run Birmingham-Manchester shuttles and/or York-Edinburgh/Glasgow shuttles to allow capacity improvements on the Turbostar routes too.

Not pretty, not ideal but it would solve most issues with extant resources.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,028
I'd still prefer a standard fleet of seven car 80x, which I feel is a better compromise between flexibility (platform usage) and capacity (still a boost over an 8 car 22x without the issues caused by pairing non-gangwayed units).

To create a universal 7 coach fleet would require 363 coaches (52 units to run 44 diagrams) vs 312 coaches in the current fleet:

The thing is to deliver a universal 7 coach fleet would require more coaches, and so would be the more expensive option, the whole point of the mixed 5/9 coach fleet was that it was a similar sized fleet in terms of coaches:
312 - current fleet
342 - current fleet plus the 6 in storage
304 - mixed 5/9 class 800 similar fleet (12×9 and 40x5)
332 - upgraded mixed 5/9 class 800 similar fleet (19×9 and 33x5)
364 - universal 7 coach class 800 similar fleet

Even with the 221's in storage (342 coaches) a universal 7 coach fleet (364 coaches) requires more coaches.

The upgraded 5/9 coach fleet could deliver (with 85% fleet occupancy) 16 of the 44 diagrams as 9 coach sets (roughly 1 in 3).

The other thing to note is that I didn't rule out the possibility of converting to a universal 7 coach fleet, in fact I said that there should be an option with enough additional coaches in that order to facilitate that.

The following is the number of in service seats (allowing 85% of sets in service for the new fleet and 10% for the existing fleet):

13,024 - current 22x fleet
14,331 - current 22x fleet + the spares
17,630 - original 5/9 coach option
19,528 - upgraded 5/9 coach option
20,856+ - universal 7 coach option*

* there maybe a few extra seats per set if the 1st class seating wasn't a full coach, but the above gives a good enough comparison.

As such there's a significant increase in capacity across the fleet.

It's also worth noting that not all 5 coach sets are created equal:
Class 221 has 246 seats
Class 800 has 302 (LNER) or 326 (GWR)
802 has 326 (GWR) 327 (Hull Trains) or 342 seats (TPE)

As such even a LNER set replacing a 221 in service would provide an uplift in capacity of 22.76% (although would more likely be being used to replace single 220 workings which would be a 50% uplift in capacity).

I read somewhere on this forum that GWR have a surplus of 5-car 800/0 trains. Six out of thirty five would be very useful to relieve overcrowding on Edinburgh-Bristol or Manchester-Bristol where they could run on OHLE for half of the time replacing six 220/221 units for strengthening other XC services
Moorthorpe-Sheffield/Doncaster-Swinton electrification is a priority for SYCA for Leeds-Sheffield fast and Adwick-Sheffield stoppers to covert to electric units. This would allow XC to operate on electric as far south as Sheffield using 800s.
If MML electrification was to restart southwards from Sheffield to Derby then Edinburgh-Bristol services could run as far south as Derby on electric. That would allow two MML and two XC services each way per hour between Sheffield and Derby operating on electric.
West Midlands intends to electrify all lines Kings Norton to Barnt Green so this will allow Manchester-Bristol services to operate on electric between Manchester and Bromsgrove.

One option I looked at (which would reduce the number of new coaches) was to lengthen a lot of the 800's and 802's at GWR to 9 coach sets (giving GWR an increase in capacity) to then release 5 coach sets to XC without needing to increase the number of coaches leased by GWR.

Current GWR fleet:
36 × 5 coach 800
21 × 9 coach 800
22 × 5 coach 802
14 × 9 coach 802
(59 full length equivalent, where 5+5 is equivalent to a single 9 coach set)

Total coaches = 605
Total total diesel engines = 319

By substituting 2 batteries in the 9 coach sets and 1 battery in the 5 coach sets you could have longer sets without needing to increase the number of diesel engines.

This would allow a new GWR fleet of:
5 × 5 coach 800 (16 to XC)
36 × 9 coach 800
4 × 5 coach 802 (8 to XC)
24 × 9 coach 802
(64.5 full length equivalent, where 5+5 is equivalent to a single 9 coach set)

Total coaches = 605 (at GWR)
Total diesel engines = 216 (168 at GWR and 48 at XC).

Of the 136 up rated class 802 engines these could be used so every 5 coach unit used and just 11 of the 9 coach sets would be the lower powered engines.

24 class 80x's at XC would allow 20 diagrams (plus 4 units for spares) leaving 24 diagrams (plus a minimum of 5 units for spares) to be run by class 22x's.

I'd we need at least 28 sets of 22x units at XC they could be reformed to be 8 coaches by creating:
11 sets from the 220 fleet (with 2 spares coaches)
17 sets from the current XC 221 fleet (with 2 spare coaches)

Why 8 and not 9?

Well it's not possible to create a 9 coach fleet from the number of 22x's available unless some were 222's, as even if we used the entire 221 fleet (including the two at GC and the 220's that's only 27, although the 220 fleet could create a 7 coach set and IF the two spare coaches from the 221's could be used it could be possible to create the 28th unit).

Also a single unit with 8 coaches would have the same capacity as a 4+5 train. Meaning that they could directly substitute for most services and given the extra capacity across the rest of the fleet any small reduction where there's currently 5+5 trains wouldn't be significant.

It's worth noting, that even if with all the stored units and existing fleet were available end to end of end there's only enough units to run in pairs for 50% of diagrams (whilst more across the core could be possible that would require more 4 coach sets to run on their own beyond the core).

50% of the time would allow the 4 coach sets to run as 4+4 all the time, whilst leaving the rest of the diagrams to be a minimum of 5 coaches, although there's still 4 spare 5 coach sets to pair up on some core routes where capacity is needed.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,750
Location
Newport
We can all burn through umpteen sets of crayons on XC’s woes but it is caught viciously by the railway’s post-covid shift from TOC-led growth to DfT’s misguided penny pinching.

We can only hold our breath to see what Burnham does to DfT and the treasury’s remits.
 

martin butler

Member
Joined
9 Oct 2018
Messages
849
At what point is XC due to be nationalised? might that, once it becomes part of the same nationwide organisation, change stock allocation, as then business needs might dictate what units get allocated to which branding, ?
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,036
Location
West Wiltshire
At what point is XC due to be nationalised? might that, once it becomes part of the same nationwide organisation, change stock allocation, as then business needs might dictate what units get allocated to which branding, ?
No date has been announced, but is likely to be last operator to be nationalised in mid October 2027 based on current contract which expires 15 October 2027

So effectively another 15 months before any stock cascades or swaps with other operators (or who operates the routes) could theoretically commence
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,750
Location
Newport
So effectively another 15 months before any stock cascades or swaps with other operators (or who operates the routes) could theoretically commence
Except this isn’t BR where swaps of any size could be done very rapidly. Every vehicle is owned and hired out by a fleet owner with contractual arrangements that often dictate the maintenance locations too. And DfT still controls the cash flow.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,036
Location
West Wiltshire
Except this isn’t BR where swaps of any size could be done very rapidly. Every vehicle is owned and hired out by a fleet owner with contractual arrangements that often dictate the maintenance locations too. And DfT still controls the cash flow.
Thats why I said theoretically could start. By October 2027 some operators will have been nationalised over 2 years, and DfT or DTFO or shadow GBR (whatever is the name of team doing the transition) will have had some lease contracts up for extension or renewal so will have had chance to add variations.

Personally I am in the camp of thinking best thing is to get a few 8xx bimodes to XC, and reform the voyager fleet by buying unleased sets and scrapping some end vehicles (which can provide lots of spares) and making some 4car sets into 6car sets. And if not going to use tilt would be inclined to scrap 221 end vehicles rather than 220s
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,307
I'd still prefer a standard fleet of seven car 80x, which I feel is a better compromise between flexibility (platform usage) and capacity (still a boost over an 8 car 22x without the issues caused by pairing non-gangwayed units).
but this thread is really about the shortage of capacity today and what can be done to alleviate it. New-build stock, even refurbishing the "same" stock from other operators - and possibly even re-forming Voyagers - will take years to implement, and I dread the consequences of another prolonged spell of driver training.

We need to ensure that all units in service are used for passenger capacity, which can be done with some basic level upgrading of the skills of the hospitality staff. Agree what needs to be agreed, pay what (relatively) little it will take and get the best use out of what is there.

Draft in any immediately-compatible sets and make the technical changes needed on almost-compatible sets (222s?), don't bother with re-liverying or changing interiors. These are low-cost initiatives and I am sure that income from relieving the suppressed demand will easily provide money to cover them.

If GWR (and maybe operators N of Newcastle) have the resources and can cover the outer ends I would reluctantly accept confining XC Voyagers to the core, but it would have to be with cross-platform interchanges and maybe a timetable tweak so that people didn't lose an hour by having to change.
Nicking the Voyagers running to Manchester would be good too, x-platform changes at Wolves, International or Coventry (subject to the same conditions) as 350's are available and one would hope that driver training (and LNR route knowledge) extension) would be relatively quick to implement.

Then look at a longer term new-train strategy...
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,528
Location
Derby
There have been mentions of using 800 type IEP units. Are they guage compliant on the core section of Cross Country?
 