Sadiq Khan says future of Heathrow Express should be ‘reconsidered’ due to Elizabeth line success

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,268
Location
Bath
Heathrow station can probably have 6 platforms - 2 bay platforms terminating services from the GWML, 2 bay platforms terminating services from the south, and 2 through platforms for the Elizabeth Line trains. That's probably too many platforms, but you get the gist.
But why do you need 6 platforms and terminating trains when you could have 2? That's a huge extra cost no real benefit.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,443
Location
Isle of Man
Heathrow station can probably have 6 platforms - 2 bay platforms terminating services from the GWML, 2 bay platforms terminating services from the south, and 2 through platforms for the Elizabeth Line trains
It can’t. Or not easily. The box for the south west extension is already built under T5. They’re not going to go off tunnelling more than that.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,607
The way they are paired, you'd have two through (tunnelled into the unfinished box) - and whichever services would terminate, would turn at the current HEx/Crossrail island.
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
997
There is an article in the latest edition of RailWatch written by Steve Costello which offers a new twist on his company's plans. (Not yet shown on the Heathrow Southern Access website.) In addition to the original suggestions for Southern Access, the article suggests an alternative route to reading from Heathrow T5 with trains taking a new route via the existing tunnel. It suggests an additional service from Waterloo.

  • Four trains per hour from Waterloo to Reading via Clapham Junction, Heathrow Terminal 5 and central terminal area, and Slough.
Here is his diagram of the services proposed
Heathrow Services.jpg

However, our alternative Heathrow western Railway proposal provides an integrated solution at lower cost, making optimum use of the constrained rail network capacity both withing Heathrow and on the national network.

I don't know how practical this would be. It would require a new west-facing chord at Heathrow junction to allow trains to turn west onto the GWML.

My thought is that it might be better to incorporate any service like that into a new tunnel with a station at the new Terminal planned for the third runway.

What are the thoughts of others here?
 

rmHawk765

Member
Joined
8 Apr 2025
Messages
710
Location
ECML South
There is an article in the latest edition of RailWatch written by Steve Costello which offers a new twist on his company's plans. (Not yet shown on the Heathrow Southern Access website.) In addition to the original suggestions for Southern Access, the article suggests an alternative route to reading from Heathrow T5 with trains taking a new route via the existing tunnel. It suggests an additional service from Waterloo.


Here is his diagram of the services proposed
View attachment 207049



I don't know how practical this would be. It would require a new west-facing chord at Heathrow junction to allow trains to turn west onto the GWML.

My thought is that it might be better to incorporate any service like that into a new tunnel with a station at the new Terminal planned for the third runway.

What are the thoughts of others here?
'Centre of the south-east rail network' is certainly a stretch... though perhaps if the overall aim is to integrate the SWR network with Heathrow this makes more sense. However I doubt there is capacity for an extra 4tph at Waterloo, through Clapham Junction, or at Reading.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,581
Location
UK
It would require a new west-facing chord at Heathrow junction to allow trains to turn west onto the GWML.
Only a few hundred million for that. Pennies in the scheme of things, eh? ;)
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
There is an article in the latest edition of RailWatch written by Steve Costello which offers a new twist on his company's plans. (Not yet shown on the Heathrow Southern Access website.) In addition to the original suggestions for Southern Access, the article suggests an alternative route to reading from Heathrow T5 with trains taking a new route via the existing tunnel. It suggests an additional service from Waterloo.


Here is his diagram of the services proposed
View attachment 207049



I don't know how practical this would be. It would require a new west-facing chord at Heathrow junction to allow trains to turn west onto the GWML.

My thought is that it might be better to incorporate any service like that into a new tunnel with a station at the new Terminal planned for the third runway.

What are the thoughts of others here?

I think that opening up a direct route between Waterloo services and Slough could be useful
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,944
Location
London
I think that opening up a direct route between Waterloo services and Slough could be useful

In what sense? You can probably get to Waterloo quicker than any hypothetical "direct service" via a fast GWR train to Paddington and the Bakerloo line. The only thing would be better connectivity to intermediate stations.

Of course Western / Southern link would be a good thing but not so sure this is a major reason.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,944
Location
London
Even if there was capacity isn't the whole area too built up to have a chord? Joining into Staines/Egham you'd surely have to dig underground.

It's more the reservoirs, wetlands/rivers and presumably floodplain in the way. You'd have to dig underground anyway as that's where the railway is of course.

1783015630641.png
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,261
I don't know how practical this would be. It would require a new west-facing chord at Heathrow junction to allow trains to turn west onto the GWML.
That seems crazy. How would grade elevation be achieved into the Heathrow tunnels when there are already significant viaducts over the GWML there, a short distance to the tunnel portal and other things in the way? With the spur to Terminal 4 being on the flat, what else can get through Heathrow Central?
1783016649183.png
[Screenshot is a map of Heathrow Airport Junction west of Hayes & Harlington illustrating a lack of space for a grade separated junction from the west.]
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
In what sense? You can probably get to Waterloo quicker than any hypothetical "direct service" via a fast GWR train to Paddington and the Bakerloo line. The only thing would be better connectivity to intermediate stations.

Of course Western / Southern link would be a good thing but not so sure this is a major reason.

I specifically said "Waterloo services" I.e. not necessarily between Waterloo and Slough.

Trying to get North/South between lines isn't easy and so whilst getting into London is fairly quick, getting from (say) Richmond to Slough isn't easy and so a direct service with a circa 40 minutes journey time for Slough/Richmond or circa 35 minutes Slough/Twickenham could be useful.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,549
Location
Torbay
That seems crazy. How would grade elevation be achieved into the Heathrow tunnels when there are already significant viaducts over the GWML there, a short distance to the tunnel portal and other things in the way? With the spur to Terminal 4 being on the flat, what else can get through Heathrow Central?
The Western rail link project considered and rejected this. It was judged difficult and expensive, and would put further capacity pressure on the Heathrow tunnel section, and the junction area, with all trains terminating at T5.
 

Mattplans

Member
Joined
27 Sep 2024
Messages
697
Location
London, UK
Why is Acton West an unsuitable place for a fast Elizabeth Line service from Paddington to Heathrow to crossover?

1783023045292.png

One thing the western route definitely needs is to be a bit clearer to customers about calling patterns. As if it isn't confusing enough already knowing what train goes to your stop unless you travel to/from Ealing
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,581
Location
UK
Why is Acton West an unsuitable place for a fast Elizabeth Line service from Paddington to Heathrow to crossover?

View attachment 207079

One thing the western route definitely needs is to be a bit clearer to customers about calling patterns. As if it isn't confusing enough already knowing what train goes to your stop unless you travel to/from Ealing
Because they would conflict with other services whilst doing so. Moreover the junction is 'single lead' so only one train can do that movement and a time.o

You can timetable it so that trains in opposite directions use the crossover at different times but during disruption, trains bunch up and so it would inevitably add to delays. That's what happens on the Midland MaIn Line where Thameslink services are booked to weave to and from the Fast lines on single lead crossovers.

Acton West and other locations are used to cross services between the Mains and Reliefs when there's a two track timetable in operation (which is happening increasingly frequently for HS2/Old Oak Common station works). But because the junction is single lead, the train frequency has to be significantly reduced to make the timetable work: HEx and Elizabeth line T4 services get reduced to half hourly and Maidenhead services are cancelled.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Why is Acton West an unsuitable place for a fast Elizabeth Line service from Paddington to Heathrow to crossover?
If you think of a switch from the Down Relief to Down Main, both the Up and Down Main need to be clear for it to happen. And that means for the timetable to work that any train on either of those lines has to be far enough away for them not to be checked (ie three signals away). That in itself is going to be exceedingly difficult with the volume of traffic.

Then add the move the other direction, and the Up and Down Reliefs need to be clear. And then, even if you can find slots for all those, you have to find ones where the moves in each direction don't conflict with each other.

So well nigh impossible to do such a move across single lead junctions until you get west of Airport Junction when suddenly you have 10 less services an hour in each direction. But even then it's a move that is like threading a needle through a haystack, and exposes the railway to more chance of delays as soon as any service is running late.
 

squingo44

Member
Joined
5 Jan 2026
Messages
182
Location
London
If the GWML were completely redesigned to be direction-paired, then it would easier for Elizabeth Line services to switch onto the fast lines...
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
If the GWML were completely redesigned to be direction-paired, then it would easier for Elizabeth Line services to switch onto the fast lines...
That would require completely reconstructing every station and junction between Paddington and Didcot (except Airport Junction, possibly). Not going to happen when keeping the Elizabeth line on the slows is the preferable traffic separation operationally anyway to move the greatest volume of people on the line.
 

squingo44

Member
Joined
5 Jan 2026
Messages
182
Location
London
Would it be more feasible to introduce a series of passing loops at different stations along the relief lines? Would it be possible to deliver, say, 8 TPH to Heathrow and 8 TPH all stops to Maidenhead by having the Heathrow services pass the stoppers around Hanwell?
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,581
Location
UK
Would it be more feasible to introduce a series of passing loops at different stations along the relief lines? Would it be possible to deliver, say, 8 TPH to Heathrow and 8 TPH all stops to Maidenhead by having the Heathrow services pass the stoppers around Hanwell?
Which stations would lose direct access to Heathrow under that proposal? Remember that Heathrow is a huge centre of employment, over 80k people work at the airport itself or associated businesses. Many of them live in west London and commute by train now that there's a frequent and fast service (6tph) on the Elizabeth line. I hardly imagine that severing this or forcing them to change would be popular....
 

squingo44

Member
Joined
5 Jan 2026
Messages
182
Location
London
Which stations would lose direct access to Heathrow under that proposal? Remember that Heathrow is a huge centre of employment, over 80k people work at the airport itself or associated businesses. Many of them live in west London and commute by train now that there's a frequent and fast service (6tph) on the Elizabeth line. I hardly imagine that severing this or forcing them to change would be popular....
This proposal would only provide good value for money if flighting the Heathrow and GWML services could massively increase the frequency of Elizabeth Line trains west of OOC without impacting freight traffic. West Ealing, Hanwell, and Southall would be skipped, and the Heathrow-bound trains would probably need an extra pair of dedicated platforms at Hayes & Harlington to avoid conflicts.

The frequency of service to the skipped stations would stay the same, if not increase, and a wait of at most a couple of minutes for cross-platform interchange at H&H to Heathrow doesn't sound particularly harsh to me. Alternatively, you could 6-track the GWML all the way from Acton Wells to Airport Junction...
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
This proposal would only provide good value for money if flighting the Heathrow and GWML services could massively increase the frequency of Elizabeth Line trains west of OOC without impacting freight traffic.
It can't, freight can barely get slots as it is.
West Ealing, Hanwell, and Southall would be skipped, and the Heathrow-bound trains would probably need an extra pair of dedicated platforms at Hayes & Harlington to avoid conflicts.
The optimum setup would surely be to have the Maidenhead run fast from Hayes to Paddington (OOC when it opens) and the Heathrows all-stops. Then there is no loss of connectivity to Heathrow, better journey times for the outer EL services, and still have consistent calling patterns? The GJT would reduce by increasing the service (under your plans).
The frequency of service to the skipped stations would stay the same, if not increase, and a wait of at most a couple of minutes for cross-platform interchange at H&H to Heathrow doesn't sound particularly harsh to me. Alternatively, you could 6-track the GWML all the way from Acton Wells to Airport Junction...
As an approximate value, a station call costs about 2 minutes journey time in a commuter train. If we assume all trains are stopping Paddington and Hayes & Harlington, and that OOC will have platform capacity for both services to call as well, then you are looking at up to 5 stations being skipped for a maximum of 10 minutes Journey time difference (8 if you keep Ealing Broadway call in for the Underground interchange).

On the GWML the headway is 2 mins if the first train is non-stop and 2.5 if the first trains stops at any intermediate station (generally*). ETCS ins unlikely to bring this down below 2. That means your overtaking trains must make up at least 5 minutes to overtake trains. However, the train in front is likely going to incur and additional 0.5 minutes going into the loop and getting out of the loop (1 min total) against if the platform were just by the side of the running line, due to turnout speeds etc.

So, if we take you're 16tph figure, we're looking for trains to be 3.75mins apart Arriving at Paddington, but the railway currently works in half minutes so the 2nd train will be 3.5mins behind. For the purposes of this example it is not relevant which group goes to which branch

Station1st train (Stops)2nd train (Fast)3rd train (Stops)4th train
Paddingtonxx.00xx.03½xx.07½xx.11
Acton MLxx.06½xx/09xx.14xx/16½
Ealing Broadwayxx.09½ (xx.09a-xx.13½d)xx/11 (xx/11½)xx.17 (xx.16½a-xx.21d)xx/18½ (xx/19)
West Ealingxx.12 (xx.16½)xx/12 (xx/12½)xx.19½ (xx.24)xx/19½ (xx.20)
Hanwellxx.14 (xx.18½) [xx.19a-xx.24½d.]xx/13 (xx/13½) [xx/14]xx.21½ (xx.26) [xx.26½a.-xx.32d.]xx/20½ (xx.21) [xx.21½]
Southallxx.17 (xx.21½) [xx.28]xx/14 (xx/14½) [xx/15]xx.24½ (xx.29) [xx.35½]xx/21½ (xx.22) [xx.22½]
Hayes and Harlingtonxx.20½ (xx.25) [xx.31½]xx.16 (xx.16½) [xx.17]xx.28 (xx.32½) [xx.39]xx.23½ (xx.24) [xx.24½]
Airport Jnxx/21½ (xx.26) [xx/32½]xx/17 (xx/17½) [xx/18]xx/29 (xx.33½) [xx/40]xx/24½ (xx.25) [xx.25½]

Bold areas indicate where trains are overtaking. Note the following:
- 6-tracking dynamic loop would need to begin at Acton ML and run to Southall.
- Putting in a static loop at Ealing Broadway (Times in Parentheses) adds ½ a minute in to the fast train, and delays the slow train sufficiently that it would need to be overtaken again
- Adding in the 2nd loop at Hanwell (times in Square Brackets) delays the fast trains by an additional ½ minute, and note that the Stopping train 7.5 mins ahead of the 1st train would need to loop at Southall, or the fast trains be held back by 2.5 mins (missing the immediate interchange, BTW).

I believe @The Planner says the going rate for this analysis is north of £100/hr, so I'll be sure to send you my invoice at a competitive rate ;)

CAVEAT: All of this is done on the back of an envelope, so a proper exercise with access to a proper planning system would be required to verify the conclusions. You might need a loop moving to a different station, or potentially only need 2 rather than 3 loops, etc...

* - before the pedants come in, yes the headways are *very* particular on this section.
 
Last edited:

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,315
Location
Reading
This discussion concerning insufficient track capacity out of Paddington to Airport Junction or Slough has been going on for at least 10 years in this forum. See, for example, the post from @Starmill found here on 19 December 2016:

Personally I think if growth continues as it is now (and it looks set to - in London even the electric car isn't going to make much of a dent unless there's a radical increase in road space), an extra pair of tracks between Paddington and Slough is inevitable. The cost will be huge but we can't just ignore the problem. It is not making good use of the assets in the core section that billions have already been poured into not to do something, and that will probably become clear 1-2 years after Crossrail opens. There is no scope for this to be at the expense of IC electrification, HS2 or key investment elsewhere though. I just wish the Government would come up with a few more £billion a year and be consistent about it. It's a good use of the money.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,021
Location
West Wiltshire
Seems DfT have awarded a £1.5m tender, for legal opinion on future of Heathrow Express.

I was under impression the contract was extended to a specific date, and unless extended ends on that date. (Can't remember date, but think it was during 2028). So wonder what is going on if deciding on the future needs lots of legal advice, presume their is some variation of what happens now (it doesn't cost £1.5m in legal fees just to extend expiry without changing anything else)

P4105017 Provision of Legal Advisers for Future of Heathrow Express​

1 supplier​

Description​

The call-off contract shall commence on the 30th June 2026 and the expiry date will be 31st March 2027 for a period of nine (9) months. The total contract value will be up to £1,500,000.00 excluding VAT. This Direct Award is being offered under RM6360 Legal Panel for Government, Lot 5: Rail Legal Services Framework and the Panel Terms and Conditions shall apply

Award Detail​

1Ashurst (Duval Square London)
  • Value: £1,500,000

CPV Codes​

  • 79100000 - Legal services

 
Last edited:

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
Seems DfT have awarded a £1.5m tender, for legal opinion on future of Heathrow Express.

I was under impression the contract was extended to a specific date, and unless extended ends on that date. (Can't remember date, but think it was during 2928). So wonder what is going on if deciding on the future needs lots of legal advice, presume their is some variation of what happens now (it doesn't cost £1.5m in legal fees just to extend expiry without changing anything else)




I suspect there's a typo in that date (Easily done).

Should it read 2028?
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
I suspect there's a typo in that date (Easily done).

Should it read 2028?
I would have thought DfT would want to clarify the situation by early 2027, so planning for the 2028 timetables can be done with some certainty.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,148
Location
Bolton
I was under impression the contract was extended to a specific date, and unless extended ends on that date. (Can't remember date, but think it was during 2028). So wonder what is going on if deciding on the future needs lots of legal advice, presume their is some variation of what happens now (it doesn't cost £1.5m in legal fees just to extend expiry without changing anything else)
GWR don't need to keep operating the service on behalf of the Airport if they choose not to after the contract expires, yes, that's absolutely right.

I suspect this has a lot more to do with the rights over Network Rail's tracks which the Airport holds, rather than anything to do with the GWR contract. The rights stem from the agreement the Airport made with BR, rather than being decided by the ORR as they might be today.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,262
The Heathrow Express track access contract is an unregulated Track Access Contract that ends in 2028. They don’t have a standard template TAA - the basis of their track access contract is the contract they made with the BRB.

In the situation where DfT ensures GBR jacks up the base track access charges in 2029 (and drives most of OA off the network) Heathrow Express would be able to pay long run incremental costs and would probably survive, so this is a very bad sign for OA generally if the DfT is now looking at their options on Heathrow Express.

The 387 units will be leased GBR assets so redeployment would be relatively easy if they wanted to kill Heathrow Express off completely.
 

squingo44

Member
Joined
5 Jan 2026
Messages
182
Location
London
It can't, freight can barely get slots as it is.

The optimum setup would surely be to have the Maidenhead run fast from Hayes to Paddington (OOC when it opens) and the Heathrows all-stops. Then there is no loss of connectivity to Heathrow, better journey times for the outer EL services, and still have consistent calling patterns? The GJT would reduce by increasing the service (under your plans).

As an approximate value, a station call costs about 2 minutes journey time in a commuter train. If we assume all trains are stopping Paddington and Hayes & Harlington, and that OOC will have platform capacity for both services to call as well, then you are looking at up to 5 stations being skipped for a maximum of 10 minutes Journey time difference (8 if you keep Ealing Broadway call in for the Underground interchange).

On the GWML the headway is 2 mins if the first train is non-stop and 2.5 if the first trains stops at any intermediate station (generally*). ETCS ins unlikely to bring this down below 2. That means your overtaking trains must make up at least 5 minutes to overtake trains. However, the train in front is likely going to incur and additional 0.5 minutes going into the loop and getting out of the loop (1 min total) against if the platform were just by the side of the running line, due to turnout speeds etc.

So, if we take you're 16tph figure, we're looking for trains to be 3.75mins apart Arriving at Paddington, but the railway currently works in half minutes so the 2nd train will be 3.5mins behind. For the purposes of this example it is not relevant which group goes to which branch

Station1st train (Stops)2nd train (Fast)3rd train (Stops)4th train
Paddingtonxx.00xx.03½xx.07½xx.11
Acton MLxx.06½xx/09xx.14xx/16½
Ealing Broadwayxx.09½ (xx.09a-xx.13½d)xx/11 (xx/11½)xx.17 (xx.16½a-xx.21d)xx/18½ (xx/19)
West Ealingxx.12 (xx.16½)xx/12 (xx/12½)xx.19½ (xx.24)xx/19½ (xx.20)
Hanwellxx.14 (xx.18½) [xx.19a-xx.24½d.]xx/13 (xx/13½) [xx/14]xx.21½ (xx.26) [xx.26½a.-xx.32d.]xx/20½ (xx.21) [xx.21½]
Southallxx.17 (xx.21½) [xx.28]xx/14 (xx/14½) [xx/15]xx.24½ (xx.29) [xx.35½]xx/21½ (xx.22) [xx.22½]
Hayes and Harlingtonxx.20½ (xx.25) [xx.31½]xx.16 (xx.16½) [xx.17]xx.28 (xx.32½) [xx.39]xx.23½ (xx.24) [xx.24½]
Airport Jnxx/21½ (xx.26) [xx/32½]xx/17 (xx/17½) [xx/18]xx/29 (xx.33½) [xx/40]xx/24½ (xx.25) [xx.25½]

Bold areas indicate where trains are overtaking. Note the following:
- 6-tracking dynamic loop would need to begin at Acton ML and run to Southall.
- Putting in a static loop at Ealing Broadway (Times in Parentheses) adds ½ a minute in to the fast train, and delays the slow train sufficiently that it would need to be overtaken again
- Adding in the 2nd loop at Hanwell (times in Square Brackets) delays the fast trains by an additional ½ minute, and note that the Stopping train 7.5 mins ahead of the 1st train would need to loop at Southall, or the fast trains be held back by 2.5 mins (missing the immediate interchange, BTW).

I believe @The Planner says the going rate for this analysis is north of £100/hr, so I'll be sure to send you my invoice at a competitive rate ;)

CAVEAT: All of this is done on the back of an envelope, so a proper exercise with access to a proper planning system would be required to verify the conclusions. You might need a loop moving to a different station, or potentially only need 2 rather than 3 loops, etc...

* - before the pedants come in, yes the headways are *very* particular on this section.
Thanks for this detailed analysis! This is all very interesting, and it's going to take me a while to digest in full.

My reason for making the Heathrow services the express services and the Maidenhead services the stopping services between Ealing Broadway and Hayes & Harlington was that it prioritises traffic to and from the central core. I'm not sure why you would focus on traffic between the three skipped stations and Heathrow Airport when the majority of passengers are more likely to be concerned about getting into the city centre? On top of that, journeys to and from Heathrow Airport are mostly going to be from city centre stations, so there's more value to speeding up those journeys, even at the cost of making the Hanwell - Heathrow Airport journey require an interchange.

The time penalty for entering and exiting the turnouts looks harsh. I guess it really does just make sense to build an extra pair of tracks for freight from Acton Wells to Airport Junction, get them out of the way, and then run every Elizabeth Line trains all-stops.
 