Still waiting for an open access to jump on Darlo to Dunrobin Castle out of P2&3 with reversal on the mainline through tracksIf an open access outfit launches a Darlo to Aberystwyth* service they can use P2&3.
*Other destinations are available.
Surely you run via Stockton to tap the Northeast Tees castle/tartan marketStill waiting for an open access to jump on Darlo to Dunrobin Castle out of P2&3 with reversal on the mainline through tracks
The overrun was getting embarrassing (the refurbishment was meant to be completed by autumn 2025) so the bare minimum has been done to get the new platforms open for the start of the new timetable, but the original station, especially the Victoria Road entrance, remains a mess.Have all the works been completed or are there still jobs to do?
There's certainly plenty of room to put another bay platform in on the new side. Indeed the current layout of the station very much looks like it has been built with that in mind. Might even be able to get a third platform in on that side if you wanted.The early Network Rail idea was for P6 to be a second up through platform, with an additional separate bay P7 for services towards Teesside. That implies it’s the solution to major increases to terminating services. I don’t think we’ll see any additional local services into P2/3, as just pointed out that defeats the aim of reducing crossing moves over the through lines.
There was meant to be 2 bay platforms and one through from the initial plans and publicity that Ben Houchen put out.There's certainly plenty of room to put another bay platform in on the new side. Indeed the current layout of the station very much looks like it has been built with that in mind. Might even be able to get a third platform in on that side if you wanted.
Indeed, although 3 was rarely used anyway and 2 only got the quick turnaround on the hourly Darlo-Saltburn shuttle which is now on 6 of course.The new building looks very attractive.
I'm guessing the train shed will seem a bit quieter nowdays.
As part of this 7th path I believe it was said previously that the Bishop-Saltburn service would need to be split at Darlington to remove the crossing of the ECML - not sure if that's still the case now. I presume the extra platform capacity would allow for an increased frequency to Bishop Auckland, as you could add an hourly shuttle with relative ease using P1.The new works allow for further expansion with provision for another through platform, as per the NR Enhancements doc;
"New platforms will provide capacity for a 7th ECML passenger path through Darlington and help to enable future infrastructure improvements for a potential 8th or 9th path."
The current arrangement is one part of the enhancements required for the 7th path from York to Newcastle, allowing a second hourly TPE service to be delivered as promised by the TRU works.
Seven late night services and ECS Class 156/158 workings (2D59, 5D92, 2D63, 5A55, 2D67, 5E34 and 2D69) end up in Platforms 2 and 3.Gosh, that's a quick turnaround. I thought that it would be used for more time than that. That's ideal then!
I suppose therefore platforms 2 and 3 can therefore mainly be used for stabling services that aren't turning around quickly?
I was surprised to see that Platform 1 is used by at least one northbound ECML service (1S01 Doncaster-Edinburgh, depart 06.15). Doesn't this involve crossing from the DM to the UM and then accessing the platform by the diamond back across the DM? I did wonder if it was because Platform 5 wasn't in use until later in the day, but an earlier service does call.It's the loss of regular service on 1 which feels most strange with only an hourly use on the Bishop-Saltburn service with a handful of longer distance north/south bound trains timetabled to use it throughout the day. Outside of Northern there's 4 x Crosscountry, 3 x TPE and 2 x LNER using it per day (most of these presumably due to freight clashes or to provide extra resilience where close to another departure on 4).
Yeah there's a missing crossover so annoyingly you do have to cross from the Down to the Up briefly to access P1 from the south. An annoying bit of missing flexibility (would be especially useful in a future world where we split the Bishop at Darlington as then P4 could be a virtual bay for that leaving P1 for all the northbound stuff). Like you I was also somewhat puzzled why it used P1 rather than P4 and as yet haven't been able to come up with an answer!I was surprised to see that Platform 1 is used by at least one northbound ECML service (1S01 Doncaster-Edinburgh, depart 06.15). Doesn't this involve crossing from the DM to the UM and then accessing the platform by the diamond back across the DM? I did wonder if it was because Platform 5 wasn't in use until later in the day, but an earlier service does call.
Could 1S01 be using platform 1 due to Northerns 2D97 0619 Darlington to Bishop Auckland being in platform 4 at the time 1S01 would need to use it?Yeah there's a missing crossover so annoyingly you do have to cross from the Down to the Up briefly to access P1 from the south. An annoying bit of missing flexibility (would be especially useful in a future world where we split the Bishop at Darlington as then P4 could be a virtual bay for that leaving P1 for all the northbound stuff). Like you I was also somewhat puzzled why it used P1 rather than P4 and as yet haven't been able to come up with an answer!
Ooh that's a good shout! Yes it'll be 2D97s fault or more accurately 3D01 which is a bit of a jumbo train down from Heaton as it usually brings down four 156s into P4 at 0610. One of them goes off at 0619 to Bishop as 2D97, two more go to Saltburn at 0621 (one dropping off at Middlesbrough) as 2D06 and then the final unit shunts out of P4 at 0631 to Darlignton South Junction before finally ending up in P3 ready to form 2D08 to Saltburn at 0649.Could 1S01 be using platform 1 due to Northerns 2D97 0619 Darlington to Bishop Auckland being in platform 4 at the time 1S01 would need to use it?
Where does the unit come from for 2D97?
Does it shunt from 2/3 or does it arrive off an ecs from Heaton?
Used it for the first time last week. Entered via Victoria Road as I was walking from town. This entrance seems somewhat forgotten and run down which, as the natural pedestrian entrance/exit, is disappointing. The lack of any work/smartening up on the existing train shed makes it feel neglected and unloved.Have more staff have been taken on to "man" the new part of the station - does anyone know?
Are the escalators working yet?
Have all the works been completed or are there still jobs to do?
I've used it once and the new extension is massively oversized and seems to be just corridors and a car park.Looks complete now. Travelling with a bike I have explored all(I think) exits. It adds about 5 minutes exiting. The longish walk to Newshan Road might be my best bet, the lift faff slowing my usual Victoria Road route to the south.
My conclusion and feelling about the new and now ginormous station is "WTF".
Good thinking ref staffing; but that would have required LNER to regrade the barrier staff and ticket office staff into a multi skilled role.I think it's inefficient that the new ticket gateline is distant from the new ticket office, and the new ticket office is an old-fashioned ticket window behind glass. A consolidated layout could have allowed staff to work together at busy times, and allowed one staff member to cover both roles at quiet times.
Regarding the new exit, it should get good footfall as that's where the main car park is, as the tempory car park on Clifton Road is now permanently closed.I was there a couple of days ago (I'm originally from Darlo) and must admit I'm not quite sure how to feel about it.
Positive to see what is clearly a large spend and nice new areas and useful platform capacity.
But agree the long corridor to the new exit seems a confusing design and not convinced the waiting area with the Greggs is going to get much use given how remote it is from the two currently "known" entrances and all the platforms. I passed through admittedly late but it was fully lit and a bank of screens was broadcasting train times to an empty room.
Also doesn't integrate aesthetically with the existing station. It's like they built a standalone station to a generic modern design next door with no consideration of the existing train shed and its fittings at all. The new bridge particularly looks like they just cut a hole in the Victorian train shed roof with little thought.
It is obviously a modern addition to the old building, personally I prefer that kind of thing rather than "pretend old". Makes it clear what's original and what's not. Aesthetic preference is personal, though.Also doesn't integrate aesthetically with the existing station. It's like they built a standalone station to a generic modern design next door with no consideration of the existing train shed and its fittings at all. The new bridge particularly looks like they just cut a hole in the Victorian train shed roof with little thought
The station expansion is proving to be worth its weight in gold today. A points failure is meaning that down trains are having to go wrong line and are using platform 1 as the down main.
This would undoubtedly have been a lot more difficult without the new layout.
Yes I suspect it is easier to manage this now with the new layout. Not perfect of course because as noted elsewhere in this thread to go from the Down Main to P1 you still have to cross the Up Main briefly but at least the Up trains can happily sit in P5 whilst that's going on instead of having to wait for P1 to become clear before they can arrive! It really used to cause plenty of congestion before the new layout when they tried that manoeuvre.
Though we really do need someone to come back and fettle it so that trains can arrive into P1 without ever having to touch the Up Main at all...
I've also noticed that it's been a boon for the Darlington - Saltburn service as well. The ECML can be in complete chaos including at Darlington but the Northern service is happily still trundling in and out of the station on its own little spur. Obviously Bishop is still fighting for its life crossing the ECML. But at least only half the trains are subject to ECML induced delays now!
Oh yeah that's a little rare but it does happen from time to time. The layout at Darlington has always been very flexible (apart from that one little niggle). It was more painful when a down LNER (or XC/TPE) had to pass a Northern at the southern end of P4. The bypass loop is painfully slow compared to the direct P4 approach (10/20mph I think versus maybe 50 or 60?).I also experienced Northern trains passing eachother at the Southern end of P4, which I hadn't realised was a thing.
But extremely difficult to replace the switched diamond with 3 turnouts in the space available to keep the connection to Eagleascliffe. Could possibly be done though - but may require losing the line adjacent to 1 and moving the turnouts for 2/3 on to the Down Loop.Yes, a new crossover to enable independant access to P1 down trains would be handy for day to day running.
Bypass loop is 20mph, southern half of 4 is 35mph according to the Sectional appendix. It changes to 50mph in the northern half after the points from the loop. https://vaildata.uk/sa?lor=LN600&seq=010&name=DARLINGTONOh yeah that's a little rare but it does happen from time to time. The layout at Darlington has always been very flexible (apart from that one little niggle). It was more painful when a down LNER (or XC/TPE) had to pass a Northern at the southern end of P4. The bypass loop is painfully slow compared to the direct P4 approach (10/20mph I think versus maybe 50 or 60?).