At present, there seems to be an acceptance that hot weather will inevitably lead to failures on the railway. When hot weather does occur, the response seems to be limited to mitigation measures (painting some track white, do not travel notices, key route strategies, etc.), rather than measures to prevent overheating in the first place.
I don't mean to criticise this approach - I'm sure NR and the TOCs have examined potential solutions but have deemed them impractical and/or uneconomical for one reason or another. But I'm curious as to what those solutions might be if resources weren't so limited.
Some ideas I had;
1. Tarpaulin canopies built over lines to shade them from direct sunlight. Would keep rails continuously shaded so they wouldn't be much hotter than ambient air temperature. Would obviously be an enormous capital cost to fit over the entire GB network, so would probably only be worth installing over major junctions where high rail temperatures are more likely to cause major disruption through points failures. Can imagine they might be a nightmare to maintain too - might need to be more of a net than a canopy to prevent water accumulation and prevent them from becoming sails in high winds.
2. Modified RHTTs than can spray low-pressure water onto the rails. Would potentially allow the entire network to be cooled without significant infrastructure investment, but might be a nightmare to fit RHTTs in around the regular timetable. I also haven't run the numbers, so it might only be able to cool short sections of rail before needing refilling.
3. Sprinkler systems to spray water onto the tracks. Similiar to 2, but switching high OpEx for high CapEx. Would probably only be feasible to fit to S&C, similiar to 1.
Any more ideas / criticisms / comments welcome.
I don't mean to criticise this approach - I'm sure NR and the TOCs have examined potential solutions but have deemed them impractical and/or uneconomical for one reason or another. But I'm curious as to what those solutions might be if resources weren't so limited.
Some ideas I had;
1. Tarpaulin canopies built over lines to shade them from direct sunlight. Would keep rails continuously shaded so they wouldn't be much hotter than ambient air temperature. Would obviously be an enormous capital cost to fit over the entire GB network, so would probably only be worth installing over major junctions where high rail temperatures are more likely to cause major disruption through points failures. Can imagine they might be a nightmare to maintain too - might need to be more of a net than a canopy to prevent water accumulation and prevent them from becoming sails in high winds.
2. Modified RHTTs than can spray low-pressure water onto the rails. Would potentially allow the entire network to be cooled without significant infrastructure investment, but might be a nightmare to fit RHTTs in around the regular timetable. I also haven't run the numbers, so it might only be able to cool short sections of rail before needing refilling.
3. Sprinkler systems to spray water onto the tracks. Similiar to 2, but switching high OpEx for high CapEx. Would probably only be feasible to fit to S&C, similiar to 1.
Any more ideas / criticisms / comments welcome.