It's literally not what I said or implied. The point is that prior to tranches of significant legislation coming in, the railway had less of an impetus to look after the health and safety of the people who worked for it and used it. It does not imply negligence or lack of care. The reality is simple - fatal accidents were vastly more common 50 years ago, as were derailments, and this is why the railway had a much more ready in-house solution to attending accident scenes. They were more common for myriad reasons, but to claim the railway was impervious to the changing sands of legislation relating to health and safety is daft. In 1970 the railway had almost no responsibility at all for causing deaths of employees as it was governed by OSRPA 1963 which was extraordinarily weak when it came to actual industrial accidents and was superseded in law for good reason.

Don't invent what I said and then get offended at the made-up version. At no point did I ever say or imply BR "didn't care". It existed in a different time when there were different priorities and, for much of its existence, lower consequences for causing death or serious injury to people using it or working on it. That the Rule Book is written in blood does not equate to a slur on people who happened to work for BR.
Strange then that it was only after Privatisation that I and others were taken to task for stopping trains or work on the grounds that it was not safe. My experience since is that "Managers" were quite happy to skirt around safety to achieve performance or financial targets.

The difference in safety culture was quite wide especially with the emerging Projects organisations

Safety on the railway did and still does depend on which department / company / division and what location / area / region that you work in.

As an example, in the area where I worked, the electricians (this was before OHL made it to our area) worked very safety when on the track, as they were very cautious. The S&T were fairly good (more so after a member of staff was killed, which resulted in new instructions to all S&T staff). But some of the P.Way teams, well...

Also, safety levels in our society in general has changed.

Within the railways, many a time, the comparison was made with the building trade for some reason. Where traditionally they were seen to have a poor safety record.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,458
Location
Gomshall, Surrey
I imagine another element to the recovery process today as opposed to decades ago is the need for extra care to preserve evidence which may not have been done then. Trains are much more complex and delicate in many ways now, plus there are more analysis methods available now than then. All the little things add up. I can't imagine the unpleasantness of the task in this weather when having to wear safety clothing, etc.
 

Haywain

Veteran Member
Joined
3 Feb 2013
Messages
24,480
I imagine another element to the recovery process today as opposed to decades ago is the need for extra care to preserve evidence which may not have been done then.
Indeed, and the fact that there are potential criminal offences now makes that more important. Years ago the emphasis was on finding out what happened and why, rather than seeing if there was someone responsible who might be subject to prosecution.
 

442Haz

Member
Joined
9 Sep 2013
Messages
62
Recovery here seems to be going very well which is great for the investigation timeline to continue at pace and also good for the restoration of the railway naturally which is a key priority here.

Back in the 80s at Clapham, it was exceptionally difficult due to access roads, but more so due to the crashworthiness of the old Mk1s, 2003 the REP at the head of the 12 car rake from Bournemouth was basically destroyed and lifting was only achievable after extensive flame cutting to separate sections of mangled twisted metal. The 360 as can be expected held up very well in comparison so thankfully we’re in a different world now compared to 1988.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
I imagine another element to the recovery process today as opposed to decades ago is the need for extra care to preserve evidence which may not have been done then.
They will be particularly interested in the structural crashworthiness of the trains, as this is essentially the first time the measures introduced in the 90s have been tested "in anger". Any further damage to the ends during recovery could compromise that.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,458
Location
Gomshall, Surrey
They will be particularly interested in the structural crashworthiness of the trains, as this is essentially the first time the measures introduced in the 90s have been tested "in anger". Any further damage to the ends during recovery could compromise that.
Yes, and from my views of the damage on photos, I can only imagine how earlier generation stock would have fared in a 50mph impact.
 

Trainman40083

Established Member
Joined
29 Jan 2024
Messages
4,523
Location
Derby
Office in Derby but probably heading to the HSE laboratory at Buxton where they have all the necessary facilities plus are independent as well.
But would they be on the A6 south of Derby if they were going to Buxton? I'd have thought M6 , due to low bridges
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
But would they be on the A6 south of Derby if they were going to Buxton? I'd have thought M6 , due to low bridges
A6 connects with A50 that then connects ultimately with M6 doesn't it?
Anyway it's speculation on destination so far.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,196
Location
Yorkshire
Just a gentle reminder to stick to discussing the topic as described in the thread title please.

Any discussion of any spin-off matter, or indeed any other topic (such as climate resilience or a comparison of past approaches to health & safety) should be posted in a new thread (if there isn't one already) for the new topic.

Thanks.
 

flitwickbeds

Member
Joined
19 Apr 2017
Messages
768
Any updates as to the current status of the site? I understand all train carriages have been removed into the field, then moved out of the field - so I assume there is nothing of the trains left on the tracks?

I think I read that there was a significant portion of tracks that needed to be replaced, and then presumably the OHLE checked.

I know the line was due to be shut over the weekend anyway due to engineering works - is it likely to be back up and running by Monday, albeit maybe with a temporary timetable to get stock back in the right places?
 

Twingo37175

Member
Joined
24 Mar 2019
Messages
246
Any updates as to the current status of the site? I understand all train carriages have been removed into the field, then moved out of the field - so I assume there is nothing of the trains left on the tracks?

I think I read that there was a significant portion of tracks that needed to be replaced, and then presumably the OHLE checked.

I know the line was due to be shut over the weekend anyway due to engineering works - is it likely to be back up and running by Monday, albeit maybe with a temporary timetable to get stock back in the right places?
I believe they are aiming to get it open during today to at least get stock in the right place for Monday. I am advised there are 4 Thameslink units in Bedford as against a much higher number normally.

As you reference there are works this weekend and they will still happen keeping the line closed over the weekend, but I believe the aim maybe for normal service from Monday.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Any updates as to the current status of the site? I understand all train carriages have been removed into the field, then moved out of the field - so I assume there is nothing of the trains left on the tracks?

I think I read that there was a significant portion of tracks that needed to be replaced, and then presumably the OHLE checked.

I know the line was due to be shut over the weekend anyway due to engineering works - is it likely to be back up and running by Monday, albeit maybe with a temporary timetable to get stock back in the right places?
There’s a NR video from yesterday evening showing the track replacement progress and OHLE re-installation progress:

Six days on, we've now completed a full track renewal. Overhead line installation is underway, with one wire run complete and the second in progress as we work to safely reopen your railway as quickly and safely as possible.


Our latest update from Mark Budden.
He explains that they were waiting for the heat to die down to get on with certain work, but seems positive about overall progress.
 
Last edited by a moderator:

Amos390

Member
Joined
22 Jan 2025
Messages
678
Location
Nottingham
Lines appear to have been handed back to the signaller now, all "-T3-", "****" and "BLOK" codes are gone, with DB 0Z66 (66011) and what might be a Thameslike 700 under 5Z00 passing over the affected area at the moment.

Edit: Can confirm 5Z00 is 700048, and appears to be shuttling up and down the affected area, now as 5Z01, presumably testing the OHLE
 
Last edited:

baz962

Established Member
Joined
8 Jun 2017
Messages
3,664
Lines appear to have been handed back to the signaller now, all "-T3-", "****" and "BLOK" codes are gone, with DB 0Z66 (66011) and what might be a Thameslike 700 under 5Z00 passing over the affected area at the moment.
A couple of EMR trains are running today.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
AIUI The block is off, proving trains running now.

My guess is that the rail stressing was done last night, and would probably have been pretty easy in the small hours, no need to pull it!
 
Joined
4 Mar 2024
Messages
17
Location
Nottinghamshire
That really is some impressive work from RAIB and BTP (in terms of handing line back) and NR in fixing everything within a week, massive props to all involved
 
Joined
21 May 2014
Messages
959
That video is a great piece of communication - NR seems to be pretty good at this stuff - and the installation of a water 'cannon' for the teams working on site seems like such a good idea. Kudos to all of them that have put in the (very) hard hours on this.
 

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,692
Location
Derby
1Z53 and 1Z59 are running south to London, to return as 1Z54 and 1Z63. Alllcated are 810016 and 810014 respectively
 

AlterEgo

Verified Rep - Wingin' It! Paul Lucas
Joined
30 Dec 2008
Messages
29,180
Location
LBK
Amazing stuff really to get the line back open given the circumstances, and great expectation management from Network Rail.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
Fantastic work under such gruelling temperatures.
Well done to all for the work they have undertaken.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,837
Location
UK
Fantastic work given the level of work needed and the crazy heat and humidity.
 

Vexed

Member
Joined
12 Jan 2020
Messages
637
Location
Herts / Hants
It's great to see how quick this has happened especially with the heat. I've been outside in full PPE myself this week and it's not pleasant with the heat and humidity.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,067
Location
Redcar
Fantastic work by everyone to make this happen from a standing start and in gruelling conditions. I've said before and I'll say again that the fella fronting up for Network Rail has been tremendous with their updates. Clear and concise but still giving you plenty of information. Brilliant. Also a real poke in the eye to those dinosaurs that wang on about how "back in my day...", a reminder that the railway engineers of the 21st century are just a skilled, dedicated and hard-working as their forebears. Fantastic.
 
Status