Merle Haggard
Established Member
Iirc the ballast level was lowered as well as the tunnel floor during electrification , and even with all that it was still a tight fit.
I think I remember correctly that it was a pioneer use of slab track to improve (= reduce) tolerance but possibly I'm getting confused with another section of line nearby.